Professional Documents
Culture Documents
Table Of Contents
1
Serial Item Annexure / Page
No. Appendix No.
2
Part-A
Summary of the project
1 2 3 4
Loan - - -
Equity - - -
Others (to be - - -
3
mentioned)
Total
Company's Own Money
Fiscal year GOB (Foreign currency) Other (Foreign
(Foreign Currency)
Currency)
1 2 3 4 5
15298.99 15298.99
2021-22 - -
(-) (-)
64887.38 64887.38
2022-23 - -
(-) (-)
60908.30 60908.30
2023-24 - -
(-) (-)
141094.67 141094.67
Total - -
(-) (-)
1 2 3
4
9.0 Summary of Estimated Expenditure (in lakhs Taka)
Compan
Details of various y's Own
Econo- GOB Percentage Of
Economic parts(Items) as Total cost Money
mic Unit Amount (foreign Others Project Total
Sub-Code per Economic *(7+8+9) (Foreign
Code currency) Cost (%)
Sub-Code Currenc
y)
1 2 3 4 5 6 7 8 9 10
(A) Revenue
Cash Wages
3111
And Salaries
Salary Of
311101 Numbers 23 265.02 265.02 - - 0.188
Officers
Employee
3111201 Numbers 5 31.39 31.39 - - 0.022
salaries
Liability Bulk
3111301 - 50.00 50.00 - - 0.035
allowance Allocation
Education Bulk
3111306 - 60.40 60.40 - - 0.043
Allowance Allocation
Medical Bulk
3111311 - 105.30 105.30 - - 0.075
Allowance Allocation
Festival Bulk
3111325 - 142.02 142.02 - - 0.101
Allowance Allocation
Overtime Bulk
3111327 - 2.88 2.88 - - 0.002
Allowance Allocation
Honorary
allowance /
fee / Bulk
3111332 - 6.00 6.00 - - 0.004
remuneration Allocation
(For different
committees)
Honorary
Allowance/Fee
/Remuneration Bulk
3111332 - 25.00 25.00 - - 0.018
(for Allocation
Intermediate
Assessment)
5
Baishakhi Bulk
3111335 - 25.01 25.01 - - 0.018
Allowance Allocation
Administrative
3211 -
expenses
Compan
Details of various y's Own
Econo- GOB Percentage Of
Economic parts(Items) as Total cost Money
mic Unit Amount (foreign Others Project Total
Sub-Code per Economic *(7+8+9) (Foreign
Code currency) Cost (%)
Sub-Code Currenc
y)
1 2 3 4 5 6 7 8 9 10
Entertainment Bulk
3211106 - 52.00 52.00 - - 0.037
expenses Allocation
Vehicle
3211107 Vehicle rental 144 180.00 180.00 - - 0.128
/ month
Seminars /
conferences / Bulk
3211111 - 90.00 90.00 - - 0.068
experience Allocation
sharing
Utility service
3211114 Month 36 5.00 5.00 - - 0.004
charges
Telephone/
3211120 Month 36 10.00 10.00 - - 0.007
Mobile
Outsourcing
3211131 staff / fees / Numbers 317 1020.87 1020.87 - - 0.724
remuneration
3231 Training - -
Overseas Bulk
3231101 - 500.00 500.00 - - 0.345
training Allocation
Internal Bulk
3231201 - 450.0 450.0 - - 0.319
training Allocation
Internal Travel
3241
And Transfer
6
Lubricant
Bulk
3243102 Gas and fuel - 50.00 50.00 - - 0.035
Allocation
Compan
Details of various y's Own
Econo- GOB Percentage Of
Economic parts(Items) as Total cost Money
mic Unit Amount (foreign Others Project Total
Sub-Code per Economic *(7+8+9) (Foreign
Code currency) Cost (%)
Sub-Code Currenc
y)
1 2 3 4 5 6 7 8 9 10
Printing And
3255
Manihari
Stationery,
Bulk
3255104 seals and - 20.00 20.00 - - 0.014
Allocation
stamps
Professional
Services,
3257 Honors And
Special
Expenses
Consulting Bulk
3257101 - 600.00 600.00 - - 0.425
services Allocation
Bulk
3257104 Survey - 100.00 100.00 - - 0.071
Allocation
Repair And
3258
Maintenance
Motor vehicle
repair, Bulk
3258101 - 10.00 10.00 - - 0.007
maintenance & Allocation
rehabilitation
PD office
Bulk
3258107 maintenance - 75.00 75.00 - - 0.053
Allocation
and decoration
(B) Capital
Buildings And
4111
Installations
Lightning
4111201 Numbers 1476 10288 10288 - - 7.292
Protector
7
4111201 Flood shelters Numbers 158 31600 31600 - - 22.396
Digital
4111314 Numbers 1700 1700 1700 - - 1.205
Dashboard
Compan
Details of various y's Own
Econo- GOB Percentage Of
Economic parts(Items) as Total cost Money
mic Unit Amount (foreign Others Project Total
Sub-Code per Economic *(7+8+9) (Foreign
Code currency) Cost (%)
Sub-Code Currenc
y)
1 2 3 4 5 6 7 8 9 10
Shores
conservation
4111321 K.M. 68 26315.92 26315.92 - - 18.615
work in urban
areas
Shores
conservation
4111321 S.M 784131 6443.21 6443.21 - - 4.567
work in rural
areas
8
(C) Price contingency Allocation 9061.13 9061.13 - - 6.42
9
11.1 Proposed Project Management Framework: (Annexure-2)
11.2 Implementation Measures: The project work will be implemented through the Project
Implementation Officer and Project Design Preparation and Supervision Consultant under the
technical and administrative supervision of the respective District Relief and Rehabilitation Officers.
The project director will be in charge of the overall implementation of the project.
12.0 Financial and Purchase Plan:
12.1 Procurement Plan: [Annexure - 3 (a), 3 (b) and 3 (c)]
12.2 Year targets based on the financial and physical activity: (Annexure 4)
13.0 Is there a need to transfer the output of the project to the revenue budget after completion of the
project? : Yes
13.1 Answer If yes, details of institutional arrangements for operation and maintenance and
technical and financial requirements:
(Specify the amount of annual cost and manpower required to keep the benefits of the project
running)
The cost of operation and maintenance of the project will be borne by the non-development
and revenue budget of the Disaster Management Department. According to the feasibility
study report of the project, the project will cost Rs. 3094.00 lakh per annum for operation and
maintenance. The project work will be implemented through the Project Implementation
Officer and Project Design Preparation and Supervision Consultant under the technical and
administrative supervision of the Self-Relief and Rehabilitation Officer. The project director
will be in charge of the overall implementation of the project.
13.2 If not answered, summary of financial and institutional arrangements required for
operation and maintenance:
(Specify the amount of annual cost and manpower required to keep the benefits of the project
running)
10