11 COVID claims
9681 40
100
4566.98
1,347,912.00
Probable Claims identified as per CA and prevailing situations
Extract of Clause
In the event that (i) the Authority does not procure fulfilment of any or all of the
Conditions Precedent set forth in Clause 4.1 within the period specified in respect
thereof, and (ii) the delay has not occurred as a result of breach of this Agreement
by the Concessionaire, or due to Force Majeure, the Authority shall pay to the
Concessionaire Damages in an amount calculated at the rate of 0.1% (zero point
one per cent) of the Performance Security for each day’s delay until the fulfilment
of such Conditions Precedent , subject to a maximum of 20% (twenty percent) of
the Performance Security
The Authority shall procure that during the subsistence of this Agreement, neither
the Authority nor any Government Instrumentality shall construct or cause to be
constructed any Competing Road; provided that the restriction herein shall not apply
if the average traffic on the Project Highway in any three consecutive years exceeds
90% (ninety per cent) of its designed capacity as stipulated in the Specifications
and Standards. Upon breach of its obligations hereunder, the provisions of clause
12 and Section 17 of The National Highways Fee (Determination of Rates and
Collection) Rules, 2008 and any applicable amendments thereof shall apply
Cost towards Utility shifting & Tree felling shall be reimbursed from NHAI, Estimates for utility
shifting is under process for approvals and Tree cutting claim shall be submitted as per SOR
Estimates for COS( both positive and negative) along with profit and reciprocal percentage
increase on SOR rates as per our project cost to be provided
As per clause 23.4 local vehicles are not permitted to use project highway if service
road/alternate roads exist adjacent to Highway, if the local vehicles still using project highway
temporary toll booths shall be provided for collecting the Toll from local vehicles
Cl 24.2: Subject to the provisions of Clause 14, in the event that the Actual Fee 1 shall have
fallen short of or exceeded the Target Fee 1 by more than 20% (twenty percent)
thereof, the Concession Period shall be deemed to be modified in accordance with
Clause 24.5.1
Cl 24.5.1:Subject to the provisions of Clause 24.2 and Clause 3.1, in the event Actual Fee 1
shall have fallen short of or exceeded the Target Fee 1 by more than 20% (twenty percent),
then for every 1% (one percent) shortfall or increase as compared to the Target Fee 1, the
Concession Period, subject to fulfillment of terms of this
Agreement, shall be increased by 1.5% (one and a half percent) or decreased by
0.75% (point seven five percent) thereof; provided that such increase or decrease in
Concession Period shall not in any case exceed not more than limits specified in
Clause 3.1. For the avoidance of doubt, and by way of illustration, it is agreed that
in the event of a shortfall or increase by 30% (thirty percent) in Target Fee 1, the
Concession Period shall be increased by 15% (fifteen percent) or decreased by
7.5% (seven and a half percent) thereof
COVID claims shall be submitted in frequent intervals i.e. every 7 days as per CA
Subject to the provisions of Clause 28.4, in the event of the Authority being in
material default or breach of this Agreement at any time after Appointed Date, it
shall pay to the Concessionaire by way of compensation, all direct costs suffered or
incurred by the Concessionaire as a consequence of such material default or breach
within 30 (thirty) days of receipt of the demand supported by necessary particulars
thereof
As per notification dated 12.11.2020 from Ministry of finance, PBG values to be reduced to 3%
on Contract value till completion of the project, this is the relief provided by GOI due to COVID
Pandemic
Payment of minimum wages/staff salaries/ machinery idling during lockdown period shall be
prepared and submitted
0.413180456564404
16
Support for Preparing Claim
73071.68 70879.53
2192.1504
75263.8304
0.941747572815534