Penjadwalan Sumber Daya Proyek
Penjadwalan Sumber Daya Proyek
DAYA PROYEK
Latar Belakang
Hampir selalu lebih banyak proyek atau aktivitas
dibandingkan dengan sumber daya yang
tersedia
Permasalahannya adalah bagaimana memilih
proyek yang memberikan kontribusi terbaik
terhadap tujuan perusahaan dengan kendala-
kendala sumber daya yang ada
Jika penjadwalan proyek menggunakan
komputer, dampak dari adanya proyek yang
baru dengan cepat dapat dikenali
The Problem
Will the assigned labor and/or equipment be
adequate and available to deal with my project?
Will outside contractors have to be used?
Do unforeseen resource dependencies exists?
Is there a new critical path?
How much flexibility do we have in using
resources?
Is the original deadline realistic?
If another project is added to our ongoing and
planned projects, will it cause delays in my
project?
Types of Project Constraints
Technical or logic constraints
Usually address the sequence in which project
activities must occur.
Resource constraints
When the availability of resource lower than required
Physical Constraints
Ex : renovation of ship compartment might allow only
one person to perform an activity because of space
limitations.
Kinds of Resource Constraints
PEOPLE
EQUIPMENT MATERIAL
WORKING CAPITAL
Classification of Scheduling Problem
Time Constrained
Test : if the critical path is delayed, will resources
be added to get back on schedule?
If the answer is yes, assume the project is time
constrained; if no, assume the project is resource
constrained.
Resource Constrained
The level of resource available cannot be
exceeded.
Priority Rules
Minimum Slack
Smallest Duration
Lowest Activity Identification Number
Splitting/Multitasking
Startup Shutdown
Organization
Design Develop- Documen- Assembly Testing Purchas- Quality Manufac-
Deliverables ment tation ing assurance turing
Architechural design 1 2 2 3 3
Hardware specifications 2 1 2 3
Kernal specifications 1 3 3
Utilities specification 2 1 3
Hardware design 1 3 3 3
Disk drivers 3 1 2
Memory management 1 3 3
Operating system documentation 2 2 1 3
Prototypes 5 4 1 3 3 3 4
Integrated acceptance test 5 2 2 1 5 5
Legend
1 Responsible 2 Support
3 Consult 4 Notification
5 Approval
Key Terms
Heuristics
Levelling/Smoothing
Multitasking
Resource-constrained projects
Splitting
Time-constrained projects
Review Questions
1. How does resource scheduling tie to project priority?
2. How does resource scheduling reduce flexibility in
managing projects?
3. Present six reasons scheduling resources is an
important task.
4. How can outsourcing project work alleviate the three
most common problems associated with multiproject
resource scheduling?
5. Explain the risks associated with levelling resources,
compressing or crashing projects, and imposed
duration or “catch-up” as the project being
implemented.