You are on page 1of 49

Dalam bahasa Indonesia

Masukan Angka di sini Ü 0.00


0 0
1 Satu 0 0
2 Dua 0 0
3 Tiga 0 0
4 Empat 0 0
5 Lima 0
6 Enam 0
7 Tujuh 0
8 Delapan 0
9 Sembilan 0
10 Sepuluh 0
11 Sebelas 0
12 Dua belas 0
13 Tiga Belas 0
14 Empat Belas 0
15 Lima Belas 0
16 Enam Belas 0
17 Tujuh Belas 0
18 Delapan belas 0
19 Sembilan Belas 0
Puluh 0
Ratus

Terbilang :

In English (RUPIAH

Enter number here Ü 288,271,846.52


0 0
1 One 0 0
2 Two 0 0
3 Three 31 31
4 Four 31,333 333
5 Five 0
6 Six 0
7 Seven 0
8 Eight 0
9 Nine 3 #NAME?
10 Ten 0
11 Eleven 0
12 Twelve 0
13 Thirteen 31 #NAME?
14 Forteen 33 #NAME?
15 Fifteen 28,824,051,352 28824051352/100
16 Sixteen
17 Seventeen
18 Eighteen
19 Nineteen
20 Twenty
21 Twenty One
22 Twenty Two
23 Twenty Three
24 Twenty Four
25 Twenty Five
26 Twenty Six
27 Twenty Seven
28 Twenty Eight
29 Twenty Nine
30 Thirty
31 Thirty One
32 Thirty Two
33 Thirty Three
34 Thirty Four
35 Thirty Five
36 Thirty Six
37 Thirty Seven
38 Thirty Eight
39 Thirty Nine
40 Forty
41 Forty One
42 Forty Two
43 Forty Three
44 Forty Four
45 Forty Five
46 Forty Six
47 Forty Seven
48 Forty Eight
49 Forty Nine
50 Fifty
51 Fifty One
52 Fifty Two
53 Fifty Three
54 Fifty Four
55 Fifty Five
56 Fifty Six
57 Fifty Seven
58 Fifty Eight
59 Fifty Nine
60 Sixty
61 Sixty One
62 Sixty Two
63 Sixty Three
64 Sixty Four
65 Sixty Five
66 Sixty Six
67 Sixty Seven
68 Sixty Eight
69 Sixty Nine
70 Seventy
71 Seventy One
72 Seventy Two
73 Seventy Three
74 Seventy Four
75 Seventy Five
76 Seventy Six
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
80 Eighty
81 Eighty One
82 Eighty Two
83 Eighty Three
84 Eighty Four
85 Eighty Five
86 Eighty Six
87 Eighty Seven
88 Eighty Eight
89 Eighty Nine
90 Ninety
91 Ninety One
92 Ninety Two
93 Ninety Three
94 Ninety Four
95 Ninety Five
96 Ninety Six
97 Ninety Seven
98 Ninety Eight
99 Ninety Nine
Hundred

#NAME?
Thousand #NAME?
Rupiahs
28824051352/100 Rupiahs
in Words :

#NAME?
In English

Enter number here Ü 31,333.00


0 0
1 One 0 0
2 Two 0 0
3 Three 31 31
4 Four 31,333 333
5 Five 0
6 Six 0
7 Seven 0
8 Eight 0
9 Nine 3 #NAME?
10 Ten 0
11 Eleven 0
12 Twelve 0
13 Thirteen 31 #NAME?
14 Forteen 33 #NAME?
15 Fifteen 0
16 Sixteen
17 Seventeen
18 Eighteen
19 Nineteen
20 Twenty
21 Twenty One
22 Twenty Two
23 Twenty Three
24 Twenty Four
25 Twenty Five
26 Twenty Six
27 Twenty Seven
28 Twenty Eight
29 Twenty Nine
30 Thirty
31 Thirty One
32 Thirty Two
33 Thirty Three
34 Thirty Four
35 Thirty Five
36 Thirty Six
37 Thirty Seven
38 Thirty Eight
39 Thirty Nine
40 Forty
41 Forty One
42 Forty Two
43 Forty Three
44 Forty Four
45 Forty Five
46 Forty Six
47 Forty Seven
48 Forty Eight
49 Forty Nine
50 Fifty
51 Fifty One
52 Fifty Two
53 Fifty Three
54 Fifty Four
55 Fifty Five
56 Fifty Six
57 Fifty Seven
58 Fifty Eight
59 Fifty Nine
60 Sixty
61 Sixty One
62 Sixty Two
63 Sixty Three
64 Sixty Four
65 Sixty Five
66 Sixty Six
67 Sixty Seven
68 Sixty Eight
69 Sixty Nine
70 Seventy
71 Seventy One
72 Seventy Two
73 Seventy Three
74 Seventy Four
75 Seventy Five
76 Seventy Six
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
80 Eighty
81 Eighty One
82 Eighty Two
83 Eighty Three
84 Eighty Four
85 Eighty Five
86 Eighty Six
87 Eighty Seven
88 Eighty Eight
89 Eighty Nine
90 Ninety
91 Ninety One
92 Ninety Two
93 Ninety Three
94 Ninety Four
95 Ninety Five
96 Ninety Six
97 Ninety Seven
98 Ninety Eight
99 Ninety Nine
Hundred

#NAME?
Thousand #NAME?
Dollars
in Words :

#NAME?

'file:///conversion/tmp/scratch/515961429.xlsx'#$TERBILANG
REHABILITASI MASJID AGUNG WATES
BQ REKAPITULASI

NO. URAIAN PEKERJAAN SUB JUMLAH JUMLAH % TOTAL

I PEKERJAAN PERSIAPAN Rp - #DIV/0!

II BANGUNAN RENOVASI MASJID

PEKERJAAN BONGKARAN Rp - #DIV/0!

PEKERJAAN STRUKTUR Rp - #DIV/0!

PEKERJAAN ARSITEKTUR Rp - #DIV/0!

PEKERJAAN ELEKTRIKAL Rp - #DIV/0!

TOTAL BIAYA PEKERJAAN FISIK BANGUNAN Rp -

JUMLAH TOTAL SELURUH PEKERJAAN #DIV/0! Rp -

PPN 10 % Rp -

TOTAL BIAYA + PPN Rp -

DIBULATKAN Rp -

TERBILANG:

Dibuat oleh
Penawar
CV/PT

Direktur

Rekapitulasi Page 7 of 49
REHABILITASI MASJID AGUNG WATES
BQ
RINCIAN ANGGARAN BIAYA

KODE
No. ITEM PEKERJAAN VOL SAT HARGA SATUAN SUB JUMLAH BOBOT TOTAL
ANALISA

I PEKERJAAN PERSIAPAN
A PEKERJAAN PERSIAPAN
1 Air dan listrik kerja 1.00 pkt Rp - Rp - #DIV/0!
2 Gudang alat dan bahan (sewa) 1.00 ls Rp - Rp - #DIV/0!
3 Direksi keet (sewa) 1.00 ls Rp - Rp - #DIV/0!
4 Papan nama proyek 1.00 unit A 5 Rp - Rp - #DIV/0!
5 Pengukuran dan Pemasangan bouwplank 1.00 ls Rp - Rp - #DIV/0!

B SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)


1 Penyiapan RKK, terdiri dari : 1.00 set Rp - Rp - #DIV/0!
- Pembuatan dokumen Rencana Keselamatan Konstruksi
- Pembuatan prosedur dan instruksi kerja
- Penyiapan formulir
2 Sosialisasi dan Promosi K3 terdiri dari :
- Induksi K3 (Safety Induction) 20.00 org Rp - Rp - #DIV/0!
- Papan informasi K3 1.00 bh Rp - Rp - #DIV/0!
3a Alat Pelindung Kerja, terdiri dari :
- Jaring pengamanan 1.00 ls Rp - Rp - #DIV/0!
3b Alat Pelindung Diri, terdiri dari :
- Topi pelindung (Safety Helmet) 10.00 bh Rp - Rp - #DIV/0!
- Pelindung mata (goggles, spectacles) 10.00 psg Rp - Rp - #DIV/0!
- Tameng Muka (Face Shield) 2.00 bh Rp - Rp - #DIV/0!
- Pelindung pernafasan dan mulut (Masker) 10.00 bh Rp - Rp - #DIV/0!
- Sarung tangan (Safety Shoes) 10.00 psg Rp - Rp - #DIV/0!
- Sepatu keselamatan (Safety Shoes) 5.00 psg Rp - Rp - #DIV/0!
- Rompi keselamatan (Safety Vest) 10.00 bh Rp - Rp - #DIV/0!
- Penunjang seluruh tubuh (Full Body Harness) 5.00 bh Rp - Rp - #DIV/0!
4 Asuransi dan Perijinan terdiri dari :
- Asuransi 1.00 ls Rp - Rp - #DIV/0!
5 Petugas K3 Konstruksi
Ahli K3 Konstruksi 5.00 OB Rp - Rp - #DIV/0!
6 Fasilitas Sarana Kesehatan :
- Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat luka, Perban 1.00 ls Rp - Rp - #DIV/0!
7 Rambu - Rambu :
- Rambu-Rambu proyek 10.00 bh Rp - Rp - #DIV/0!
- Jalur evakuasi 1.00 bh Rp - Rp - #DIV/0!
8 Lain - Lain Terkait Pengendalian Resiko K3 :
- Alat Pemadam Api Ringan (APAR) 2.00 bh Rp - Rp - #DIV/0!
- Bendera K3 2.00 bh Rp - Rp - #DIV/0!
9 Penanganan Covid-19 :
- Pelatihan K3 : Pencegahan Covid-19 3.00 org Rp - Rp - #DIV/0!
- Penyediaan fasilitas kesehatan pencegahan Covid-19 1.00 ls Rp - Rp - #DIV/0!
(thermoscan, tabung oksigen, dll)
- Peralatan pengasapan (fogging/ penyemprotan) 1.00 ls Rp - Rp - #DIV/0!

C PEMERIKSAAN STRUKTUR BANGUNAN


1 Pemeriksaan struktur bangunan 1.00 pkt Rp - Rp - #DIV/0!

BIAYA PEKERJAAN PERSIAPAN Rp -

II PEKERJAAN PEMBONGKARAN
LANTAI 01
1 Pembongkaran trap tangga eksisting + membersihkan 11.69 m3 Rp - Rp - #DIV/0!

LANTAI 02, Elev. + 18.360


1 Pembongkaran penutup atap + membersihkan 2593.66 m2 O 1 Rp - Rp - #DIV/0!
2 Pembongkaran rangka atap + membersihkan 2593.66 m2 O 2 Rp - Rp - #DIV/0!
3 Pembongkaran plafond + membersihkan 2593.66 m2 Rp - Rp - #DIV/0!
4 Pembongkaran mustaka masjid 1.00 unit Rp - Rp - #DIV/0!
5 Pekerjaan bongkar railing existing 26.99 m' Rp - Rp - #DIV/0!

BIAYA PEKERJAAN BONGKARAN Rp -

III PEKERJAAN STRUKTUR


A PEKERJAAN ATAP

RAB (RENCANA ANGGARAN BIAYA) page 8 of 49


KODE
No. ITEM PEKERJAAN VOL SAT HARGA SATUAN SUB JUMLAH BOBOT TOTAL
ANALISA
ATAP BAWAH
Catatan :
Pekerjaan profil baja sudah termasuk pengelasan, cat zincromate/ anti karat
1 Gording lipped channel 150x65x20x3.2 mm 8260.48 kg E 3 Rp - Rp - #DIV/0!
2 Plat dudukan gording, 6mm 1124.97 kg E 4 Rp - Rp - #DIV/0!
3 Baut M12 (gording) 1472.00 bh Rp - Rp - #DIV/0!
4 HILTI HAS-U (5,8) M8 + HIT RE-500V3 368.00 bh Rp - Rp - #DIV/0!
5 Plat sambung gording 3mm 241.32 kg E 4 Rp - Rp - #DIV/0!
6 Sagrod Ø 12 mm 958.78 kg E 6 Rp - Rp - #DIV/0!
7 Usuk dan reng baja ringan (mutu G550) 1288.56 m2 E 14 Rp - Rp - #DIV/0!
8 Alumunium foil double side 1288.56 m2 E 5 Rp - Rp - #DIV/0!
9 Penutup atap genteng metal berpasir 1288.56 m2 E 12 Rp - Rp - #DIV/0!
10 Bubungan genteng metal 50.00 m¹ E 13 Rp - Rp - #DIV/0!
11 Bubungan penutup 6.00 bh E 9 Rp - Rp - #DIV/0!
12 Flashing 120.00 m¹ Rp - Rp - #DIV/0!

ATAP TENGAH
Catatan :
Pekerjaan profil baja sudah termasuk pengelasan, cat zincromate/ anti karat
1 Gording lipped channel 150x65x20x3.2 mm 8704.95 kg E 3 Rp - Rp - #DIV/0!
2 Plat dudukan gording, 6mm 1320.61 kg E 4 Rp - Rp - #DIV/0!
3 Baut M12 (gording) 1728.00 bh Rp - Rp - #DIV/0!
4 HILTI HAS-U (5,8) M8 + HIT RE-500V3 432.00 bh Rp - Rp - #DIV/0!
5 Plat sambung gording 3mm 254.80 kg E 4 Rp - Rp - #DIV/0!
6 Sagrod Ø 12 mm 1047.73 kg E 6 Rp - Rp - #DIV/0!
7 Usuk dan reng baja ringan (mutu G550) 1305.10 m2 E 14 Rp - Rp - #DIV/0!
8 Alumunium foil double side 1305.10 m2 E 5 Rp - Rp - #DIV/0!
9 Penutup atap genteng metal berpasir 1305.10 m2 E 12 Rp - Rp - #DIV/0!
10 Bubungan genteng metal 96.00 m¹ E 13 Rp - Rp - #DIV/0!
11 Bubungan penutup 8.00 bh E 9 Rp - Rp - #DIV/0!
12 Mustaka masjid dari bahan tembaga 1.00 unit Rp - Rp - #DIV/0!
13 Lisplank 8/200 mm + finishing cat 168.80 m¹ E 11 Rp - Rp - #DIV/0!
14 Flashing 25.20 m¹ Rp - Rp - #DIV/0!

KONSTRUKSI RANGKA PENYANGGA ATAP ATAS


Catatan :
Pekerjaan profil baja sudah termasuk pengelasan, cat zincromate/ anti karat
1 IWF 200 x 100 x 5,5 x 8 mm 549.72 kg E 3 Rp - Rp - #DIV/0!
2 Plat rib, tebal = 8 mm 50.37 kg E 4 Rp - Rp - #DIV/0!
3 Plat sambung, tebal = 10 mm 15.71 kg E 4 Rp - Rp - #DIV/0!
4 Plat dudukan gording,(CTP - 150) 39.60 kg E 4 Rp - Rp - #DIV/0!
5 Plat plendes, tebal 15 mm 141.09 kg E 4 Rp - Rp - #DIV/0!
6 Bolt Ø 16 mm (A325) (I/WF) 48.00 bh Rp - Rp - #DIV/0!
7 Bolt Ø M12 mm (gording) 96.00 bh Rp - Rp - #DIV/0!
8 Angkur HILTI HAS-U (5,8) M16 +HIT-RE 500V3 112.00 bh Rp - Rp - #DIV/0!
Jurai
1 Double lipped channel 150x65x20x3.2 mm 380.91 kg E 3 Rp - Rp - #DIV/0!
2 Plat plendes, tebal 15 mm 70.55 kg E 4 Rp - Rp - #DIV/0!
3 Angkur HILTI HAS-U (5,8) M16 +HIT-RE 500V3 48.00 bh Rp - Rp - #DIV/0!

BIAYA PEKERJAAN STRUKTUR Rp -

IV PEKERJAAN ARSITEKTUR
A PEKERJAAN PLAFON
LANTAI 01
1 Plafon gypsum tebal 9 mm rangka metalfuring 1179.80 m2 Rp - Rp - #DIV/0!
2 Drop ceiling gypsum tebal 9 mm rangka metalfuring 436.80 m2 Rp - Rp - #DIV/0!
3 List Shadow line 119.58 m1 Rp - Rp - #DIV/0!
4 Cat plafond gypsum 1616.60 Rp - Rp - #DIV/0!

LANTAI 02
1 Plafon gypsum tebal 9 mm rangka metalfuring 2085.46 m2 Rp - Rp - #DIV/0!
2 Drop ceiling gypsum tebal 9 mm rangka metalfuring 106.19 m2 Rp - Rp - #DIV/0!
3 List Shadow line 991.58 m1 Rp - Rp - #DIV/0!
4 Plafon Akustik 12 mm Rangka plafon metal furing 781.11 m2 Rp - Rp - #DIV/0!
5 Cat plafond gypsum 2191.65 Rp - Rp - #DIV/0!

B PEKERJAAN RAILING
RAILING DIFABEL
1 Handrail H01 14.36 m1 J 0 Rp - Rp - #DIV/0!
2 Handrail H02 16.46 m1 J 0 Rp - Rp - #DIV/0!
3 Handrail H03 5.99 m1 J 0 Rp - Rp - #DIV/0!
RAB (RENCANA ANGGARAN BIAYA) page 9 of 49
KODE
No. ITEM PEKERJAAN VOL SAT HARGA SATUAN SUB JUMLAH BOBOT TOTAL
ANALISA
4 Handrail H04 3.89 m1 J 0 Rp - Rp - #DIV/0!
RAILING VOID
1 Railing kaca tempered 12 mm, rangka hollow 50x100 mm 26.99 m1 Rp - Rp - #DIV/0!

C PEKERJAAN RAMP
1 PEKERJAAN GALIAN DAN URUGAN
- Galian pondasi batu kali sedalam 1 m 18.61 m3 B 1 Rp - Rp - #DIV/0!
- Urugan pasir bawah pondasi batu kali tebal 100 mm 3.96 m3 B 2 Rp - Rp - #DIV/0!
- Urugan pasir bawah lantai 100 mm 0.26 m3 B 2 Rp - Rp - #DIV/0!
- Urugan tanah kembali bekas galian + pemadatan 6.20 m3 B 3 Rp - Rp - #DIV/0!
- Peninggian peil lantai dengan tanah urug baru 31.52 m3 B 4 Rp - Rp - #DIV/0!

2 PEKERJAAN BETON
- Rabat beton bawah lantai , tebal 100 mm (camp. 1 pc : 3 ps : 5 kr) 3.96 m3 D i 1 Rp - Rp - #DIV/0!
- Sloof praktis (SP02), uk. 120 x 200 mm 101.29 m1 D ii 1 Rp - Rp - #DIV/0!
- Kolom praktis (KP02), uk. 120 x 120 mm 32.13 m1 D ii 2 Rp - Rp - #DIV/0!
- Balok praktis (BP02), uk. 120 x 200 mm 101.29 m1 D ii 3 Rp - Rp - #DIV/0!

RAB (RENCANA ANGGARAN BIAYA) page 10 of 49


KODE
No. ITEM PEKERJAAN VOL SAT HARGA SATUAN SUB JUMLAH BOBOT TOTAL
ANALISA
3 PEKERJAAN PASANGAN DAN PLESTERAN
- Pasangan pondasi batu kali 1 pc : 8 ps 20.67 m3 C 1 Rp - Rp - #DIV/0!
- Plesteran pondasi batu kali (1 pc : 6 ps) 31.22 m2 C 3 Rp - Rp - #DIV/0!
- Acian pondasi batu kali 62.44 m2 C 4 Rp - Rp - #DIV/0!
- Pasangan dinding 1/2 bata (1 pc : 6 ps) 38.93 m2 C 2 Rp - Rp - #DIV/0!
- Plesteran dinding 1/2 bata merah (1 pc : 6 ps) 155.72 m2 C 3 Rp - Rp - #DIV/0!
- Acian dinding bata merah 155.72 m2 C 4 Rp - Rp - #DIV/0!

4 PEKERJAAN FINISHING LANTAI DAN DINDING


- Homogeneous tile, uk. 600 x 600 mm (unpolished) 26.27 m2 H 1 Rp - Rp - #DIV/0!

5 PEKERJAAN PENGECATAN
- Pengecatan dinding eksterior 218.16 m2 I 1 Rp - Rp - #DIV/0!

BIAYA PEKERJAAN ARSITEKTUR Rp -

V PEKERJAAN ELEKTRIKAL
A PEKERJAAN PANEL
1 PANEL MDP GEDUNG 1.00 unit K i 1 Rp - Rp - #DIV/0!
Box panel 800 x 600 x 250 mm type wall mounted
Tebal 1.2 mm , finishing Powder Coating
MCCB 50A / 3ph / 10kA 1 bh
MCCB 40A / 3ph / 10kA 1 bh
MCCB 30A / 3ph / 10kA 1 bh
MCCB 15A / 3ph / 10kA 2 bh
Lampu Indikator 3 bh
Fuse Lamp 2A 3 bh
Digital Power Meter Basic 1 unit
Curent Transformator (CT) 500/5 A 1 ls
Bus Bar sistem Cu 5x(20x5mm) 1 ls
Sepatu kabel+ Sleeve+ Cable ties 1 ls
Grounding sistem BC 16mm2 1 ls
ditanam sampai air tanah
Wiring + Pemasangan 1 ls

2 PANEL SDP PENERANGAN DAN DAYA LANTAI 1 1.00 unit K i 2 Rp - Rp - #DIV/0!


Box panel 500 x 400 x 200 mm type wall mounted
Tebal 1.2 mm , finishing Powder Coating
MCCB 50A / 3ph / 10kA 1 bh
MCB 25A / 1ph / 10kA 2 bh
MCB 10A / 1ph / 6kA 10 bh
MCB 6A / 1ph / 6kA 25 bh
Lampu Indikator 3 bh
Fuse Lamp 2A 3 bh
Bus Bar sistem Cu 5x(20x5mm) 1 ls
Sepatu kabel+ Sleeve+ Cable tie 1 ls
Grounding sistem BC 10mm2 1 ls
Wiring + Pemasangan 1 ls

3 PANEL SDP PENERANGAN DAN DAYA LANTAI 2 1.00 unit K i 3 Rp - Rp - #DIV/0!


Box panel 500 x 400 x 200 mm type wall mounted
Tebal 1.2 mm , finishing Powder Coating
MCCB 30A / 3ph / 10kA 1 bh
MCB 10A / 1ph / 6kA 7 bh
MCB 6A / 1ph / 6kA 20 bh
Lampu Indikator 3 bh
Fuse Lamp 2A 3 bh
Bus Bar sistem Cu 5x(20x5mm) 1 ls
Sepatu kabel+ Sleeve+ Cable tie 1 ls
Grounding sistem BC 10mm2 1 ls
Wiring + Pemasangan 1 ls

B PEKERJAAN PENGKABELAN
Penarikan kabel dari :
1 Panel MDP Gedung Kabel NY 46.00 m1 K ii 1 Rp - Rp - #DIV/0!
menuju Power House
2 Panel SDP Penerangan dan Daya Lantai 01 Kabel NY 4.00 m1 K ii 2 Rp - Rp - #DIV/0!
Ke Panel MDP Gedung
3 Panel SDP Penerangan dan Daya Lantai 02 Kabel NY 28.00 m1 K ii 2 Rp - Rp - #DIV/0!
Ke Panel MDP Gedung

C PEKERJAAN INSTALASI TITIK LAMPU DAN KOTAK KONTAK

RAB (RENCANA ANGGARAN BIAYA) page 11 of 49


KODE
No. ITEM PEKERJAAN VOL SAT HARGA SATUAN SUB JUMLAH BOBOT TOTAL
ANALISA
LANTAI 01
1 Instalasi titik lampu, Kabel NYM 2x2.5 mm² 310.00 titik K iii 1 Rp - Rp - #DIV/0!
2 Instalasi kotak kontak, Kabel NYM 3x2.5 mm² 36.00 titik K iii 2 Rp - Rp - #DIV/0!
3 Instalasi exhaust fan, Kabel NYM 2x2.5 mm² 2.00 bh K iii 3 Rp - Rp - #DIV/0!
4 Downlight Slim LED 12 W 4000K 106.00 bh K iii 4 Rp - Rp - #DIV/0!
5 Lampu Baret 12 W 4000K 2.00 bh K iii 5 Rp - Rp - #DIV/0!
6 Led Panel 300 x 1200 mm 34 W 4000K 22.00 bh K iii 6 Rp - Rp - #DIV/0!
7 LED strip 4.8 W/m (6000 mm) 60.00 unit K iii 8 Rp - Rp - #DIV/0!
8 LED strip 4.8 W/m (8000 mm) 60.00 unit K iii 9 Rp - Rp - #DIV/0!
9 LED strip 4.8 W/m (10000 mm) 60.00 unit K iii 10 Rp - Rp - #DIV/0!
10 Exhaust Fan Sirocco 10" 180 CMH 19 W 2.00 bh K iii 17 Rp - Rp - #DIV/0!
11 Saklar Tunggal 2.00 bh K iii 19 Rp - Rp - #DIV/0!
12 Saklar Ganda 18.00 bh K iii 18 Rp - Rp - #DIV/0!
13 Saklar Tukar 2.00 bh K iii 19 Rp - Rp - #DIV/0!
14 Kotak kontak 200 W 36.00 bh K iii 17 Rp - Rp - #DIV/0!

LANTAI 01 (INSTALASI UP DOWN LIGHT)


1 Instalasi titik lampu, Kabel NYM 2x2.5 mm² 32.00 titik K iii 1 Rp - Rp - #DIV/0!
2 Up & Down Light LED 10 W 4000K 32.00 bh K iii 16 Rp - Rp - #DIV/0!
3 Saklar Ganda 3.00 bh K iii 18 Rp - Rp - #DIV/0!

LANTAI 02
1 Instalasi titik lampu, Kabel NYM 2x2.5 mm² 155.00 titik K iii 1 Rp - Rp - #DIV/0!
2 Instalasi kotak kontak, Kabel NYM 3x2.5 mm² 22.00 titik K iii 2 Rp - Rp - #DIV/0!
3 Downlight Slim LED 12 W 4000K 150.00 bh K iii 4 Rp - Rp - #DIV/0!
4 Lampu LED strip 4.8 W/m (60400 mm) 1.00 unit K iii 11 Rp - Rp - #DIV/0!
5 Lampu LED strip 4.8 W/m (72000 mm) 1.00 unit K iii 12 Rp - Rp - #DIV/0!
6 Lampu LED strip 4.8 W/m (83600 mm) 1.00 unit K iii 13 Rp - Rp - #DIV/0!
7 Lampu LED strip 4.8 W/m (95200 mm) 1.00 unit K iii 14 Rp - Rp - #DIV/0!
8 Lampu LED strip 4.8 W/m (102880 mm) 1.00 unit K iii 15 Rp - Rp - #DIV/0!
9 Saklar Tunggal 5.00 bh K iii 19 Rp - Rp - #DIV/0!
10 Saklar Ganda 6.00 bh K iii 18 Rp - Rp - #DIV/0!
11 Stop kontak 22.00 bh K iii 17 Rp - Rp - #DIV/0!

D PEKERJAAN SOUND SYSTEM


LANTAI 1
1 Steerable Column Array 24 x 2" Fullrange loudspeaker, 240W Giax 2.00 unit Rp - Rp - #DIV/0!
2 Steerable Column Array 12 x 2" Fullrange loudspeaker, 120W Axir 2.00 unit Rp - Rp - #DIV/0!
3 Wall mount Subwoofer 10" loudspeaker, 225W Baso10 2.00 unit Rp - Rp - #DIV/0!
4 Wall mount Active fullrange 3-way 5" loudspeaker, 40W LX523 2.00 unit Rp - Rp - #DIV/0!
5 Ceiling hanging mount Spherical fullrange 8" loudspeaker ASP20, 20W 2.00 unit Rp - Rp - #DIV/0!
6 Wall mount fullrange 2-way 6" loudspeaker Ateo6, 24W 16.00 unit Rp - Rp - #DIV/0!

LANTAI 2
1 Column Array 4 x 3" Fullrange loudspeaker, 20W CLS420 16.00 unit Rp - Rp - #DIV/0!

CONTROL ROOM
1 Digital Matrix Controller 9in 8out, Automatic Gain Control, Feedback 1.00 unit Rp - Rp - #DIV/0!
Reduction, Timer Playback, Priority & Evacuation Ready M2

2 Multichannel Power Amplifier with Loudspeaker processor 4 x 500W 2.00 unit Rp - Rp - #DIV/0!
3 Multichannel Power Amplifier with Loudspeaker processor 4 x 350W 2.00 unit Rp - Rp - #DIV/0!
4 Multichannel Power Amplifier with Loudspeaker processor 4 x 240W 1.00 unit Rp - Rp - #DIV/0!
@ 100V PMQ240

5 Paging Microphone APM104MK2 4 zone 1.00 unit Rp - Rp - #DIV/0!


6 All in one digital audio player CMP30- CD, MP#, Tuner 1.00 unit Rp - Rp - #DIV/0!
7 Soundbar Monitor speaker, 60W IMEO1 1.00 unit Rp - Rp - #DIV/0!
8 PC with System Manager Software, Windows OS, Keyboard, Mouse, T 1.00 unit Rp - Rp - #DIV/0!
9 Rack Cabinet 30U, Cable Management, Power Distribution Unit, Fan, 1.00 unit Rp - Rp - #DIV/0!

MICROPHONES
1 Wireless Microphone Receiver 4ch ACT314B 1.00 unit Rp - Rp - #DIV/0!
2 Wireless Microphone Transmitter Vocal Handheld ACT32H 2.00 unit Rp - Rp - #DIV/0!
3 Wireless Microphone Transmitter Vocal Lavalier ACT32T / MU53L 1.00 unit Rp - Rp - #DIV/0!
4 Wireless Microphone Transmitter Vocal Headset ACT32T / MU53H 1.00 unit Rp - Rp - #DIV/0!
5 Wireless Microphne Directional Antenna AT90W 2.00 unit Rp - Rp - #DIV/0!
6 Wired Microphone, Vocal, Dynamic, SuperCardioid MM39 2.00 unit Rp - Rp - #DIV/0!
7 Wired Microphone, Vocal, Dynamic, Gooseneck Podium PDM200 1.00 unit Rp - Rp - #DIV/0!

CABLE
1 Audio cable for interconnection, Balance, AWG 24 @ 100 mtr Isopod 1.00 unit Rp - Rp - #DIV/0!
2 Audio cable for Microphone / Line, Balance, AWG 24 @ 100 mtr Stage 1.00 unit Rp - Rp - #DIV/0!
3 Audio cable for multichannel line 8ch, AWG 26 @ 1 mtr Quantum QMC 10.00 unit Rp - Rp - #DIV/0!
RAB (RENCANA ANGGARAN BIAYA) page 12 of 49
KODE
No. ITEM PEKERJAAN VOL SAT HARGA SATUAN SUB JUMLAH BOBOT TOTAL
ANALISA
4 Audio Cable for Speaker, OFC, AWG 16 @ 100 mtr Meridian SP215 10.00 unit Rp - Rp - #DIV/0!
5 Audio Connector, XLR, TS, Speakon, Barrier Strip (all set) 1.00 unit Rp - Rp - #DIV/0!

INSTALLATION
1 Installation system Lantai 1 1.00 unit Rp - Rp - #DIV/0!
2 Installation system Lantai 2 1.00 unit Rp - Rp - #DIV/0!
3 Installation system Control Room 1.00 unit Rp - Rp - #DIV/0!
4 Testing Commisioning & Tuning 1.00 unit Rp - Rp - #DIV/0!

BIAYA PEKERJAAN ELEKTRIKAL Rp -


TOTAL BIAYA PEKERJAAN RENOVASI MASJID Rp -

TOTAL BIAYA FISIK PEMBANGUNAN #DIV/0! Rp -

Penawar
CV/PT

Direktur

RAB (RENCANA ANGGARAN BIAYA) page 13 of 49


No Rp -
DAFTAR ANALISA HARGA SATUAN Tanggal Rp -
PEKERJAAN
REHABILITASI MASJID AGUNG WATES Lokasi Rp -

Owner Rp -

A PEKERJAAN PERSIAPAN
1 1m¹ Uitzet & Bouwplank
Bahan :
0.0200 kg Paku Rp - Rp -
0.0070 m 3
Kayu papan kelas III (begesting) Rp - Rp -
0.0120 m3 Kayu kelas III Rp - Rp - Rp -
Upah :
0.1000 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp -
0.0100 OH Kepala tukang batu Rp - Rp -
0.1000 OH Tukang batu Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -
Jumlah total Rp -

2 1 m2 Pembuatan gudang semen dan alat-alat (sewa)


Bahan :
1.7000 btg Dolken Rp - Rp -
0.2100 m 3
Kayu balok Rp - Rp -
0.3000 kg Paku Rp - Rp -
10.5000 kg Semen portland Rp - Rp -
0.0300 m 3
Pasir beton Rp - Rp -
0.0500 m3 Split Rp - Rp -
1.5000 lbr Seng gelombang BJLS (90 x 180) Rp - Rp - Rp -
Upah :
1.0000 OH Pekerja Rp - Rp -
2.0000 OH Tukang Rp - Rp -
0.2000 OH Kepala Tukang Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -
sewa 50% Rp -

3 1 unit Membuat Papan rambu - rambu


Bahan :
0.0350 m3 Kayu Rp - Rp -
1.0000 m2 Print outdoor flexi Rp - Rp -
0.6000 kg Paku Rp - Rp -
16.8000 kg PC Rp - Rp - Rp -
Upah :
0.4000 OH Pekerja Rp - Rp -
0.2000 OH Tukang Rp - Rp -
0.0200 OH Kepala Tukang Rp - Rp -
0.0200 OH Mandor Rp - Rp - Rp -
Analisa Harga Satuan Pekerjaan Page 14 of 49
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

4 1 m' Pagar sementara dari seng gelombang tinggi 2 meter (sewa)


Bahan :
1.1000 btg Dolken Rp - Rp -
1.0500 lbr Seng gelombang Rp - Rp -
2.5000 kg PC Rp - Rp -
0.0050 m3 Pasir beton Rp - Rp -
0.0100 m 3
Kerikil beton Rp - Rp -
0.0001 m3 Kayu klas II 5/7 x 4m Rp - Rp -
0.0500 kg Paku biasa Rp - Rp - Rp -
Upah :
0.4000 OH Pekerja Rp - Rp -
0.2000 OH Tukang Rp - Rp -
0.0200 OH Kepala Tukang Rp - Rp -
0.0200 OH Mandor Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
Jumlah total (sewa) 50% Rp -

5 1 unit Membuat Papan Nama Proyek


Bahan :
0.0350 m3 Kayu Rp - Rp -
1.0000 m2 Print outdoor flexi Rp - Rp -
0.6000 kg Paku Rp - Rp -
16.8000 kg PC Rp - Rp -
0.0270 m3 Pasir beton Rp - Rp -
0.0405 m3 Kerikil beton Rp - Rp - Rp -
Upah :
0.4000 OH Pekerja Rp - Rp -
0.2000 OH Tukang Kayu Rp - Rp -
0.0200 OH Kepala Tukang Rp - Rp -
0.0200 OH Mandor Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

6 1 m² Direksi keet (sewa)


Bahan :
1.2500 btg Dolken kayu Ø 8-10 cm/ 4 m Rp - Rp -
0.1800 m 3
Kayu papan Rp - Rp -
0.8500 kg Paku Rp - Rp -
1.1000 kg Besi strip Rp - Rp -
35.0000 kg Semen portland Rp - Rp -
0.1500 m3 Pasir Pasang Rp - Rp -
0.1000 m 3
Pasir beton Rp - Rp -
0.1500 m3 Krikil beton Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 15 of 49


30.0000 bh Bata Rp - Rp -
0.2500 lbr Seng gelombang BJLS 0,2 Rp - Rp -
0.2000 bh Jendela nako Rp - Rp -
0.0800 m2 Kaca, 3 mm Clear Rp - Rp -
0.1500 bh kunci tanam Rp - Rp -
0.3000 bh engsel Rp - Rp -
0.0600 lbr Playwood 120x240 cm, tebal = 4 mm Rp - Rp - Rp -

Upah :
2.0000 OH Pekerja Rp - Rp -
2.0000 OH Tukang kayu Rp - Rp -
1.0000 OH Tukang batu Rp - Rp -
0.3000 OH Kepala tukang kayu Rp - Rp -
0.0500 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah harga: Rp -
sewa Rp -

B PEKERJAAN GALIAN DAN URUGAN


1 1m³ Galian tanah sampai 1 meter
Upah :
0.7500 OH Pekerja Rp - Rp -
0.0250 OH Mandor Rp - Rp - Rp -
Alat :
0.0330 jam Excavator (sewa) Rp - Rp -
1.0000 ls Alat bantu pompa Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

2 1m³ Urugan Pasir


Bahan :
1.2000 m3 Pasir Urug Rp - Rp - Rp -
Upah :
0.2500 OH Pekerja Rp - Rp -
0.0083 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

3 1m³ Urugan Tanah Kembali dengan bekas galian + pemadatan


Alat :
0.1067 jam Stamper (sewa) Rp - Rp - Rp -
Upah :
0.2500 OH Pekerja Rp - Rp -
0.0083 OH Mandor Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -

Analisa Harga Satuan Pekerjaan Page 16 of 49


Profit : 6% Rp -
Jumlah Harga : Rp -

4 1m³ Urugan tanah peninggian peil bangunan dengan mendatangkan tanah urug baru + pemadatan
Bahan :
1.1000 m³ Tanah urug Rp - Rp - Rp -
Alat :
0.1067 jam Mesin stamper (sewa) Rp - Rp - Rp -
Upah :
0.3300 OH Pekerja Rp - Rp -
0.0120 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Total : Rp -

C PEKERJAAN PASANGAN DAN PLESTERAN


1 1m³ Pasangan pondasi Batu Kali 1Pc : 8Ps
Bahan :
1.1000 m3 Batu Belah 15/20 Rp - Rp -
91.0000 kg Portland Cemen (PCC) Rp - Rp -
0.5840 m3 Pasir Pasang Rp - Rp - Rp -
Upah :
0.7500 OH Tukang Batu Rp - Rp -
0.0750 OH Kepala Tukang Batu Rp - Rp -
1.5000 OH Pekerja Rp - Rp -
0.0750 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

2 1m2 Pas. Dinding 1/2 bata merah 1Pc : 6Ps


Bahan :
70.0000 bj Bata Merah Rp - Rp -
8.3200 kg Portland Cemen (PC) Rp - Rp -
0.0490 m 3
Pasir Pasang Rp - Rp - Rp -
Upah :
0.1000 OH Tukang Batu Rp - Rp -
0.0100 OH Kepala Tukang Batu Rp - Rp -
0.1000 OH Pekerja Rp - Rp -
0.0150 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -
harga per m3 Rp -

3 1m2 Plesteran Dinding 1Pc : 6Ps


Bahan :
4.4160 kg Portland Cemen (PC) Rp - Rp -
0.0270 m3 Pasir Pasang Rp - Rp - Rp -
Upah :

Analisa Harga Satuan Pekerjaan Page 17 of 49


0.1000 OH Tukang Batu Rp - Rp -
0.0150 OH Kepala Tukang Batu Rp - Rp -
0.2500 OH Pekerja Rp - Rp -
0.0150 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

4 1m2 Acian
Bahan :
3.2500 kg Portland Cemen (PC) Rp - Rp - Rp -
Upah :
0.1600 OH Tukang Batu Rp - Rp -
0.0500 OH Kepala Tukang Batu Rp - Rp -
0.0500 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

D PEKERJAAN BETON BERTULANG


i Beton
1 1 m3 Beton 1 pc : 3 ps : 5 kr
bahan :
247.0000 kg Semen portland (PCC) Rp - Rp -
0.6207 m3
Pasir beton Rp - Rp -
0.7400 m3 Kerikil beton Rp - Rp - Rp -
upah :
0.2500 OH Tukang batu Rp - Rp -
0.0250 OH Kepala tukang batu Rp - Rp -
1.6500 OH Pekerja Rp - Rp -
0.0800 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

ii Sloof, Kolom, dan Balok Praktis


1 1 m' Sloof praktis 100x200 mm, campuran beton 1pc : 3ps : 5kr
Bahan :
0.0015 m3 Kayu kelas III Rp - Rp -
0.0095 kg Paku Rp - Rp -
3.0500 kg Besi beton Rp - Rp -
0.0500 kg Kawat ikat beton Rp - Rp -
4.8500 kg Semen portland (PC) Rp - Rp -
0.0085 m 3
Pasir beton Rp - Rp -
0.0140 m3 Kerikil beton Rp - Rp - Rp -
Upah
0.0300 OH Tukang besi Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 18 of 49


0.0300 OH Tukang batu Rp - Rp -
0.0300 OH Tukang kayu Rp - Rp -
0.0100 OH Kepala tukang kayu Rp - Rp -
0.2970 OH Pekerja Rp - Rp -
0.0150 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah harga : Rp -

2 1m' Kolom praktis 120 x 120 mm campuran 1pc : 3ps : 5kr


Bahan :
0.0018 m 3
Kayu kelas III Rp - Rp -
0.0090 kg Paku biasa 2'-5" Rp - Rp -
2.9500 kg Besi beton Rp - Rp -
0.4050 kg Kawat beton Rp - Rp -
4.1861 kg Semen portland Rp - Rp -
0.0068 m 3
Pasir beton Rp - Rp -
0.0101 m3 Kerikil Rp - Rp - Rp -
Upah
0.0200 OH Tukang besi Rp - Rp -
0.0200 OH Tukang batu Rp - Rp -
0.0200 OH Tukang kayu Rp - Rp -
0.0060 OH Kepala tukang Rp - Rp -
0.1800 OH Pekerja Rp - Rp -
0.0090 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

3 1m' Balok ring praktis 120x200 mm 1pc : 3ps : 5kr


Bahan :
0.0018 m3 Kayu kelas III Rp - Rp -
0.0090 kg Paku biasa 2'-5" Rp - Rp -
3.2400 kg Besi beton Rp - Rp -
0.0450 kg Kawat beton Rp - Rp -
5.2326 kg Semen portland Rp - Rp -
0.0085 m3 Pasir beton Rp - Rp -
0.0126 m3 Kerikil Rp - Rp - Rp -
Upah
0.0330 OH Tukang besi Rp - Rp -
0.0330 OH Tukang batu Rp - Rp -
0.0330 OH Tukang kayu Rp - Rp -
0.0100 OH Kepala tukang Rp - Rp -
0.2970 OH Pekerja Rp - Rp -
0.0150 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

Analisa Harga Satuan Pekerjaan Page 19 of 49


E PEKERJAAN ATAP
1 1 m2 Pekerjaan cat baja
Bahan :
0.1000 kg Cat dasar 1 x (zincromate) Rp - Rp -
0.2600 kg Cat penutup 2 x (cat besi) Rp - Rp - Rp -
Upah :
0.0200 OH Tukang cat Rp - Rp -
0.0020 OH Kepala tukang cat Rp - Rp -
0.0200 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

2 Analisa 10 cm Mengerjakan las listrik


Bahan :
0.4000 kg Kawat las Rp - Rp -
0.3000 ltr Solar Rp - Rp -
0.0400 ltr Minyak pelumas Rp - Rp - Rp -
Upah :
0.0200 OH Tukang besi / las konstruksi Rp - Rp -
0.0200 OH Kepala tukang besi Rp - Rp -
0.0400 OH Pekerja Rp - Rp -
0.0020 OH Mandor Rp - Rp - Rp -
Alat :
0.1700 jam sewa alat Rp - Rp - Rp -
Jumlah : Rp -
Jumlah total Rp -
biaya per cm Rp -

3 Analisa 1 kg Mengerjakan baja (IWF)


Bahan :
1.1500 kg Baja IWF Rp - Rp -
1.0000 cm Las Rp - Rp -
0.0300 m 2
Zincromate + cat finishing Rp - Rp -
1.0000 ls Alat Bantu Rp - Rp - Rp -
Upah :
0.0060 OH Tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0003 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

4 Analisa 1 kg Mengerjakan baja plat


Bahan :
1.1500 kg Baja plat Rp - Rp -
1.0000 cm Las Rp - Rp -
0.0100 m 2
Zinkcromate + cat finishing Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 20 of 49


1.0000 ls Alat Bantu Rp - Rp - Rp -
Upah :
0.0060 OH Tukang besi Rp - Rp -
0.0600 OH Pekerja Rp - Rp -
0.0060 OH Kepala tukang besi Rp - Rp -
0.0003 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

5 1 m² of Alumunium foil woven double side


Bahan :
1.0500 m2 Aluminium foil Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 m2 Aplikator Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

6 1 Kg Sagrod 12 mm
Bahan :
0.0377 m2 Cat zincromate + cat besi Rp - Rp -
1.1000 kg Sagrod Ø10 mm Rp - Rp - Rp -
Upah :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

7 1 Kg Trekstang ∅ 16 mm
Bahan :
0.0502 m2 Cat zincromate + cat besi Rp - Rp -
1.1000 kg Trekstang Ø 16 mm Rp - Rp - Rp -
Upah :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

8 1 m' Mengerjakan papan ruiter kayu bengkirai 2/20


Bahan :
0.0044 m3 Papan kayu bengkirai Rp - Rp -
1.0000 ls Anti rayap Rp - Rp -
0.0200 kg Paku Rp - Rp - Rp -
Upah :
0.1000 OH Tukang kayu Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 21 of 49


0.2000 OH Kepala tukang kayu Rp - Rp -
0.0200 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

9 1 bh Bubungan penutup
Bahan :
1.0000 bh Genteng bubung penutup Rp - Rp -
1.0000 Kg Semen portland (PC) Rp - Rp -
0.2031 m 2
Kawat ayam 1x1cm Rp - Rp -
0.2031 m2 Waterproofing coating Rp - Rp -
0.0100 m 3
Pasir Pasang Rp - Rp - Rp -
Upah :
0.1000 OH Tukang batu Rp - Rp -
0.0100 OH Kepala tukang batu Rp - Rp -
0.1000 OH Pekerja Rp - Rp -
0.0010 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
10 1 m2 Kawat ayakan 1 x 1 cm
Bahan :
1.0500 m2 Kawat ayakan 1 x 1 cm Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
0.0100 OH Tukang batu Rp - Rp -
0.0010 OH Kepala tukang kayu Rp - Rp -
0.0100 OH Pekerja Rp - Rp -
0.0010 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Jumlah total Rp -
11 1 m' Lisplank woodplank 8/200 mm + Finishing cat
Bahan :
2.0000 m1 Woodplank 8/200 Rp - Rp -
3.0000 bh Screw Rp - Rp -
0.2000 m2 Finishing cat Rp - Rp -
1.0500 m1 Usuk profil C75 Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
0.1000 OH Pekerja Rp - Rp -
0.2000 OH Tukang kayu Rp - Rp -
0.0200 OH Kepala tukang kayu Rp - Rp -
0.0050 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

Analisa Harga Satuan Pekerjaan Page 22 of 49


12 1 m2 Genteng metal lapis pasir
Bahan :
1.0500 m2 Genteng metal 0.35 mm Rp - Rp -
1.0000 m2 Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Upah pasang Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

13 1 m' Bubungan/Nok atas


Bahan :
2.2989 bh Nok bulat Rp - Rp -
1.0000 ls Aksesoris + material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Upah pemasangan Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total : Rp -

14 1m2 Usuk dan reng baja ringan (G550)


Bahan :
1.0000 m2 Usuk dan reng baja ringan (G550) Rp - Rp -
Rp -
Total : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah harga : Rp -

15 1 unit Mustaka masjid dari bahan tembaga ( terpasang )


Bahan :
1.0000 unit Mustaka masjid dari bahan tembaga (terpasang) Rp - Rp -
Rp -
Total : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah harga : Rp -

16 1 m' Flashing
Bahan :
1.0941 bh Flashing Rp - Rp -
1.0000 pkt Aksesoris + material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Upah pemasangan Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total : Rp -

17 1 bh Pemasangan Angkur baut sekualitas HAS-U 5.8 M8x110 mm + Injectable Mortar HIT-RE 500 V3
Bahan :

Analisa Harga Satuan Pekerjaan Page 23 of 49


1.0000 bh Angkur galvanis HAS-U 5.8 M8x110 mm Rp - Rp -
6.0000 ml Injectable mortar Hit RE 500 V3 Rp - Rp - Rp -
Upah :
1.0000 ls Upah pemasangan Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total : Rp -

18 1 bh Pemasangan Angkur baut sekualitas HAS-U 5.8 M16x125 mm + Injectable Mortar HIT-RE 500 V3
Bahan :
1.0000 bh Angkur galvanis HAS-U 5.8 M16x125 mm Rp - Rp -
16.0000 ml Injectable mortar Hit RE 500 V3 Rp - Rp - Rp -
Upah :
1.0000 ls Upah pemasangan Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total : Rp -

F PEKERJAAN PLAFON
1 1 m2 Pekerjaan plafon gypsum 9 mm,rangka metal furing
Bahan :
0.3900 btg Furing Chanel PN204 Rp - Rp -
0.2700 btg Top Cross Rail PN200 Rp - Rp -
0.070 btg Wall angle PN212 EX Rp - Rp -
1.6200 pcs Conector PN 210 Rp - Rp -
0.8100 pcs Susp. Clip PN 223 Rp - Rp -
0.1400 btg Susp. Rod PN 225 Rp - Rp -
0.8100 pcs Angle Clip PN 220/221 Rp - Rp -
0.0090 pcs Direct fix clip PN219 Rp - Rp -
0.3500 sht Papan gypsum, tebal = 9 mm Rp - Rp -
0.0200 bag kompon + kalsit Rp - Rp -
0.0200 roll UB tape 75 Lm/roll Rp - Rp -
0.0200 tube Sealent Rp - Rp -
10.0000 pcs Screw 25mm x 083 Rp - Rp -
0.7000 pcs Paku + mesiu Rp - Rp - Rp -
Upah :
1.0000 m2 Aplikator plafon Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

2 1 m² of Drop Ceiling Gypsum 9 mm, rangka metal furing


Bahan :
0.4680 btg Furing Chanel PN204 Rp - Rp -
0.3240 btg Top Cross Rail PN200 Rp - Rp -
0.0840 btg Wall angle PN212 EX Rp - Rp -
1.9440 pcs Conector PN 210 Rp - Rp -
0.9720 pcs Susp. Clip PN 223 Rp - Rp -
0.1680 btg Susp. Rod PN 225 Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 24 of 49


0.9720 pcs Angle Clip PN 220/221 Rp - Rp -
0.0108 pcs Direct fix clip PN219 Rp - Rp -
0.4200 sht Plafon gypsum tebal 9 mm Rp - Rp -
0.0200 bag kompon + kalsit Rp - Rp -
0.0200 roll UB tape 75 Lm/roll Rp - Rp -
0.0200 tube Sealent Rp - Rp -
10.0000 pcs Screw 25mm x 083 Rp - Rp -
0.7000 pcs Paku + mesiu Rp - Rp - Rp -
Upah :
1.0000 m2 Aplikator plafon Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

3 1 m' Pekerjaan list plafon shadow line


Bahan :
1.0500 m1 List plafond (terpasang) Rp - Rp - Rp -
Upah :
1.0000 ls Aplikator plafon Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

4 1 m2 Pekerjaan plafon Akustik t = 12 mm, rangka metal furing


Bahan :
0.7700 bh Furing Chanel PN204 Rp - Rp -
0.3600 bh Top Cross Rail PN200 Rp - Rp -
0.0700 bh Wall angle PN212 EX Rp - Rp -
2.1600 bh Conector PN 210 Rp - Rp -
1.5600 bh Susp. Clip PN 223 Rp - Rp -
0.2600 bh Susp. Rod PN 225 Rp - Rp -
1.5600 bh Angle Clip PN 220/221 Rp - Rp -
1.8000 bh Direct fix clip PN219 Rp - Rp -
0.3500 lbr Papan peredam suara akustik 120 x 240 cm, tebal Rp - Rp -
0.0200 zak Compound + Calcite Rp - Rp -
0.0200 roll UB tape 75 Lm/roll Rp - Rp -
0.0200 tube Jaya sealant Rp - Rp -
20.0000 pcs Drywall screw 25mm x 083 Rp - Rp -
0.7000 pcs Jaya bolt sekrup Rp - Rp - Rp -
Upah :
1.0000 m2 Aplikator Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total : Rp -

G PEKERJAAN FINISHING LANTAI DAN DINDING

1 1 m2 Memasang lantai homogeneous 600 x 600 mm (tekstur)

Analisa Harga Satuan Pekerjaan Page 25 of 49


bahan :
1.0500 m2 Homogeneous tile 600 x 600 mm unpolished Rp - Rp -
10.0000 kg Semen Rp - Rp -
1.5000 kg Semen warna Rp - Rp -
0.0450 m3 Pasir pasang Rp - Rp - Rp -
Upah :
0.3000 OH Tukang batu Rp - Rp -
0.0300 OH Kepala tukang batu Rp - Rp -
0.6000 OH Pekerja Rp - Rp -
0.0300 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

H PEKERJAAN PENGECATAN
1 1 m2 Pekerjaan cat dinding luar
Bahan :
0.1000 ltr Cat dasar Rp - Rp -
0.2000 ltr Cat penutup 2 x Rp - Rp - Rp -
Upah :
0.0630 OH Tukang cat Rp - Rp -
0.0063 OH Kepala tukang cat Rp - Rp -
0.0200 OH Pekerja Rp - Rp -
0.0025 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

2 1 m2 Pekerjaan cat water proofing coating


Bahan :
1.0000 m2 Water proofing (terpasang) Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

3 1 m2 Pekerjaan cat genteng


Bahan :
0.2000 kg Cat dasar Rp - Rp -
0.2000 kg Cat penutup 2 x Rp - Rp - Rp -
Upah :
0.0090 OH Tukang cat Rp - Rp -
0.0060 OH Kepala tukang cat Rp - Rp -
0.0700 OH Pekerja Rp - Rp -
0.0025 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -

Analisa Harga Satuan Pekerjaan Page 26 of 49


Jumlah total Rp -

4 1 m2 Pekerjaan cat plafond


Bahan :
0.1000 kg Cat dasar Rp - Rp -
0.2000 kg Cat penutup 2 x Rp - Rp - Rp -
Upah :
0.0630 OH Tukang cat Rp - Rp -
0.0063 OH Kepala tukang cat Rp - Rp -
0.0200 OH Pekerja Rp - Rp -
0.0025 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

I PEKERJAAN RAILING
1 1 m' Hand Railing Ramp
Modul panjang 4.20 m
Bahan :
4.2000 m 1
Pipa BS Ø 2" tebal 1.6 mm + zincromate + cat besi Rp - Rp -
10.0000 bh Dynabolt Ø 10 mm Rp - Rp -
1.0000 ls Aksesories Rp - Rp -
1.0000 ls Las Rp - Rp -
1.0000 ls Material Bantu Rp - Rp - Rp -
Upah :
0.5000 OH Tukang las Rp - Rp -
0.0500 OH Kepala tukang las Rp - Rp -
1.0000 OH Pekerja Rp - Rp -
0.0100 OH Mandor Rp - Rp - Rp -
Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
Per m' Rp -

2 1 m' Railing Void


Modul panjang 5,4 m
Bahan :
22.5000 m1 Hollow stainless steel 50x100x1,2 mm Rp - Rp -
12.0000 bh Dynabolt Ø 10 mm Rp - Rp -
0.1080 m2 Plat stainless steel, tebal 6 mm Rp - Rp -
0.2160 m2 Plat stainless steel, tebal 1.2 mm Rp - Rp -
3.9150 m2 Kaca tempered laminated 10 mm Rp - Rp -
0.4320 tube Sealant Rp - Rp -
1.0000 ls Aksesories Rp - Rp -
1.0000 ls Las Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
3.0000 OH Tukang las Rp - Rp -
0.3000 OH Kepala tukang las Rp - Rp -
2.0000 OH Pekerja Rp - Rp -
0.1000 OH Mandor Rp - Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 27 of 49


Jumlah : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total : Rp -
Per m' Rp -

J PEKERJAAN ELEKTRIKAL
i Pekerjaan Panel
BANGUNAN MASJID
1 1 Unit Panel MDP Gedung
Bahan :
1.0000 unit Box panel 800 x 600 x 250 mm Rp - Rp -
type wall mounted
1.0000 bh MCCB 50A / 3ph / 10kA Rp - Rp -
1.0000 bh MCCB 40A / 3ph / 10kA Rp - Rp -
1.0000 bh MCCB 30A / 3ph / 10kA Rp - Rp -
2.0000 bh MCCB 15A / 3ph / 10kA Rp - Rp -
3.0000 bh Lampu Indikator Rp - Rp -
3.0000 bh Fuse Lamp 2A Rp - Rp -
1.0000 unit Digital Power Meter PM500 Rp - Rp -
1.0000 ls Curent Transformator (CT) 500/5 A Rp - Rp -
1.0000 ls Bus Bar sistem Cu 5x(20x5mm) Rp - Rp -
1.0000 ls Sepatu kabel+ Sleeve+ Cable tie Rp - Rp -
1.0000 ls Grounding sistem BC 16 mm2 Rp - Rp -
ditanam sampai air tanah
1.0000 ls Wiring + Pemasangan Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

2 1 Unit Panel SDP Penerangan Dan Daya Lantai 01


Bahan :
1.0000 unit Box panel 500 x 400 x 200 mm Rp - Rp -
type wall mounted
1.0000 bh MCCB 50A / 3ph / 10kA Rp - Rp -
2.0000 bh MCB 25A / 1ph / 10kA Rp - Rp -
10.0000 bh MCB 10A / 1ph / 6kA Rp - Rp -
25.0000 bh MCB 6A / 1ph / 6kA Rp - Rp -
3.0000 bh Lampu Indikator Rp - Rp -
3.0000 bh Fuse Lamp 2A Rp - Rp -
1.0000 ls Bus Bar sistem Cu 5x(20x5mm) Rp - Rp -
1.0000 ls Sepatu kabel+ Sleeve+ Cable tie Rp - Rp -
1.0000 ls Grounding sistem BC 10mm2 Rp - Rp -
ditanam sampai air tanah
1.0000 ls Wiring + Pemasangan Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -

Analisa Harga Satuan Pekerjaan Page 28 of 49


Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

3 1 Unit Panel SDP Penerangan Dan Daya Lantai 02


Bahan :
1.0000 unit Box panel 500 x 400 x 200 mm Rp - Rp -
type wall mounted
1.0000 bh MCCB 30A / 3ph / 10kA Rp - Rp -
7.0000 bh MCB 10A / 1ph / 6kA Rp - Rp -
20.0000 bh MCB 6A / 1ph / 6kA Rp - Rp -
3.0000 bh Lampu Indikator Rp - Rp -
3.0000 bh Fuse Lamp 2A Rp - Rp -
1.0000 ls Bus Bar sistem Cu 5x(20x5mm) Rp - Rp -
1.0000 ls Sepatu kabel+ Sleeve+ Cable tie Rp - Rp -
1.0000 ls Grounding sistem BC 10mm2 Rp - Rp -
ditanam sampai air tanah
1.0000 ls Wiring + Pemasangan Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

ii Pekerjaan Pengkabelan
1 1 m' Kabel NYY 4 x 16 mm2
Bahan :
1.0000 m' Kabel NYY 4 x 16 mm2 Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

2 1 m' Kabel NYY 4 x 10 mm2


Bahan :
1.0000 m' Kabel NYY 4 x 10 mm2 Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Jasa 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

3 1 m' Kabel NYY 4 x 6 mm2


Bahan :
1.0000 m' Kabel NYY 4 x 6 mm2 Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 29 of 49


Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

iii Instalsi penerangan


1 1 Titik instalasi Penerangan
Bahan :
15.0000 m1 Kabel NYM 2 x 2.5 mm Rp - Rp -
15.0000 m 1
Pipa Conduit PVC 20mm Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

2 1 Titik instalasi stop kontak


Bahan :
15.0000 m1 Kabel NYM 3 x 2.5 mm Rp - Rp -
15.0000 m1 Pipa Conduit PVC 20mm Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
3 1 Titik instalasi Exhaust fan
Bahan :
15.0000 m1 Kabel NYM 2 x 2.5 mm Rp - Rp -
15.0000 m1 Pipa Conduit PVC 20mm Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

4 1 unit Downlight Slim LED 12 W 4000K


Bahan :
1.0000 bh Downlight Slim LED 12 W 4000K Rp - Rp -
(include: armateur, lampu)
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -

Analisa Harga Satuan Pekerjaan Page 30 of 49


Profit : 6% Rp -
Jumlah total Rp -
5 1 unit Lampu Baret 12 W 4000K
Bahan :
1.0000 bh Lampu Baret 12 W 4000K Rp - Rp -
(include: armateur, lampu)
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
6 1 unit Led Panel 300 x 1200 mm 34 W 4000K
Bahan :
1.0000 bh Led Panel 300 x 1200 mm 34 W 4000K Rp - Rp -
(include: armateur, lampu)
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja Listrik Rp - Rp - Rp -
Jumlah harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

7 1 unit Exhaust Fan Sirocco 10" 180 CMH 19 W


Bahan :
1.0000 bh Exhaust Fan Sirocco 10" 180 CMH 19 W Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja Listrik Rp - Rp - Rp -
Jumlah harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
8 1 unit Lampu LED strip 4.8 W/m (6000 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (6000 mm) Rp - Rp -
1.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
9 1 unit Lampu LED strip 4.8 W/m (8000 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (8000 mm) Rp - Rp -
2.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 31 of 49


Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
10 1 unit Lampu LED strip 4.8 W/m (10000 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (10000 mm) Rp - Rp -
2.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
11 1 unit Lampu LED strip 4.8 W/m (60400 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (60400 mm) Rp - Rp -
5.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
12 1 unit Lampu LED strip 4.8 W/m (72000 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (72000 mm) Rp - Rp -
5.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
13 1 unit Lampu LED strip 4.8 W/m (83600 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (83600 mm) Rp - Rp -
6.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
14 1 unit Lampu LED strip 4.8 W/m (95200 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (95200 mm) Rp - Rp -
7.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 32 of 49


Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
15 1 unit Lampu LED strip 4.8 W/m (102880 mm)
Bahan :
1.0000 unit LED strip 4.8 W/m (102880 mm) Rp - Rp -
7.0000 bh Driver/ ballast Rp - Rp -
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
16 1 unit Lampu Up & Down Light LED 10 W 4000K
Bahan :
1.0000 bh Lampu Up & Down Light LED 10 W 4000K Rp - Rp -
(include: armateur, lampu)
1.0000 ls Material bantu Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
17 Stop kontak
Bahan :
1.0000 bh Stop kontak Rp - Rp -
1.0000 bh Inbowdoos seng Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
18 Saklar ganda
Bahan :
1.0000 bh Saklar seri Rp - Rp -
1.0000 bh Inbowdoos seng Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
19 Saklar tunggal
Bahan :
1.0000 bh Saklar tunggal Rp - Rp -
1.0000 bh Inbowdoos seng Rp - Rp - Rp -
Upah :

Analisa Harga Satuan Pekerjaan Page 33 of 49


1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -
19 Saklar tukar
Bahan :
1.0000 bh Saklar tunggal Rp - Rp -
1.0000 bh Inbowdoos seng Rp - Rp - Rp -
Upah :
1.0000 ls Pekerja listrik Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah total Rp -

K PEKERJAAN PEMBONGKARAN

1 1 m2 Bongkar penutup atap + membersihkan


Upah :
0.0500 OH Pekerja Rp - Rp -
0.0050 OH Mandor Rp - Rp -
1.0000 ls Alat bantu Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

2 1 m2 Bongkar rangka atap + membersihkan


Upah :
0.1000 OH Pekerja Rp - Rp -
0.0100 OH Mandor Rp - Rp -
1.0000 ls Alat bantu Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

3 1 m2 Bongkar plafond + membersihkan


Upah :
0.0250 OH Pekerja Rp - Rp -
0.0025 OH Mandor Rp - Rp -
1.0000 ls Alat bantu Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

4 1 m2 Bongkar railing + membersihkan


Upah :
0.3000 OH Pekerja Rp - Rp -
0.0300 OH Mandor Rp - Rp -

Analisa Harga Satuan Pekerjaan Page 34 of 49


1.0000 ls Alat bantu Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

5 1 m3 Pembongkaran trap tangga eksisting + membersihkan


Upah :
1.2000 OH Pekerja Rp - Rp -
0.1200 OH Mandor Rp - Rp -
Bahan :
2.5000 ltr Solar Rp - Rp -
Alat :
1.0000 hari Jack hammer Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

6 1 unit Pembongkaran mustaka masjid


Upah :
1.0000 OH Pekerja Rp - Rp -
0.1000 OH Mandor Rp - Rp -
1.0000 ls Alat bantu Rp - Rp - Rp -
Jumlah Harga : Rp -
Overhead : 4% Rp -
Profit : 6% Rp -
Jumlah Harga : Rp -

Analisa Harga Satuan Pekerjaan Page 35 of 49


REHABILITASI MASJID AGUNG WATES BQ DAFTAR HARGA
UPAH DAN BAHAN

SPESIFIKASI BAHAN /
NO URAIAN SATUAN HARGA SATUAN
MERK SEKUALITAS

UPAH TENAGA :
1 Tukang Batu Org/Hari
2 Tukang Kayu Org/Hari
3 Tukang Besi Org/Hari
4 Tukang Cat Org/Hari
5 Tukang las Org/Hari
6 Kepala Tukang Batu Org/Hari
7 Kepala Tukang Kayu Org/Hari
8 Kepala Tukang Besi Org/Hari
9 Kepala Tukang Cat Org/Hari
10 Kepala Tukang las Org/Hari
11 Pekerja Org/Hari
12 Mandor Org/Hari

HARGA BAHAN :
1 Pasir Cor / Pasir Beton m3
2 Pasir Pasang m3
3 Pasir Urug m3
4 Tanah urug m3
5 Split 2/3 (mesin) m3
6 Krikil beton m3
7 Batu kali Belah 15/20 m3
8 Bata Merah Bh
9 Semen Portland (PC) kg
10 Homogeneous tile 600 x 600 mm tekstur m2
11 Semen warna kg
12 Besi Beton kg
13 Kawat Bendrat kg
14 Baja IWF kg
15 Plat baja kg
16 Paku Besar/Sedang kg
17 Kayu papan kelas III (begesting) m3
18 Balok Kayu kelas II (begesting) m3
19 Papan bengkirai m3
20 Stamper (sewa) jam
21 Excavator (sewa) jam
22 Print outdoor flexi m2
23 Usuk Profil C75 m1
24 Screw S12 bh
25 Genteng bubung penutup bh
26 Woodplank 4050x200x8mm m1
27 Furing Chanel PN204 btg
28 Top Cross Rail PN200 btg
29 Wall angle PN212 EX btg
30 Conector PN 210 pcs
31 Susp. Clip PN 223 pcs
32 Susp. Rod PN 225 btg
33 Angle Clip PN 220/221 pcs
34 Direct fix clip PN219 pcs
35 Dynabolt Ø 10 bh
36 Gypsum board (1200 x 2400mm) t: 9 mm Lbr
37 Plafond Akustik 120 x 240 cm, t = 12 mm lbr
38 List plafond shadow line m1
39 Kayu dolken btg
40 Seng gelombang BJLS 32 lbr
41 Baut M12 (gording) bh
42 HILTI HAS-E (5,8) M8 + HIT RE-500 bh

Daftar Harga Upah dan Bahan page 36 of 49


SPESIFIKASI BAHAN /
NO URAIAN SATUAN HARGA SATUAN
MERK SEKUALITAS
43 Bolt Ø 16 mm (A325) (I/WF) bh
44 Angkur HILTI HAS-E (5,8) M16 +HIT-RE 500V3 bh
45 Grouting tebal = 30 mm bh
46 Cat dasar tembok luar ltr
47 Cat Tembok luar ltr
48 Cat dasar untuk genteng ltr
49 Cat genteng ltr
50 Cat dasar plafond kg
51 Cat plafond kg
52 Cat besi kg
53 Waterproofing coating (terpasang) m2
54 Kabel NYM 2 x 2.5 mm2 m1
55 Kabel NYM 3x2.5 mm2 m1
56 Kabel NYY 4 x 6 mm2 m1
57 Kabel NYY 4 x 10 mm2 m1
58 Kabel NYY 4 x 16 mm2 m1
59 Downlight Slim LED 12 W 4000K bh
60 Lampu Baret 12 W 4000K bh
61 Lampu Down Light Ø 5" Essential 11 W bh
62 Led Panel 300 x 1200 mm 34 W 4000K bh
63 Lampu baret 22 W bh
64 Exhaust Fan Sirocco 10" 180 CMH 19 W bh
65 LED strip 4.8 W/m (6000 mm) unit
66 LED strip 4.8 W/m (8000 mm) unit
67 LED strip 4.8 W/m (10000 mm) unit
68 LED strip 4.8 W/m (60400 mm) unit
69 LED strip 4.8 W/m (72000 mm) unit
70 LED strip 4.8 W/m (83600 mm) unit
71 LED strip 4.8 W/m (95200 mm) unit
72 LED strip 4.8 W/m (102880 mm) unit
73 Lampu Up & Down Light LED 10 W 4000K unit
74 Inbow doos seng bh
75 Pipa Conduit PVC dia. 20 mm m1
76 Saklar tunggal bh
77 Saklar ganda bh
78 Saklar tukar bh
79 Stop kontak bh
80 MCCB 15A, 3P, 10kA bh
81 MCCB 30A, 3P, 10kA bh
82 MCCB 40A, 3P, 10kA bh
83 MCCB 50A, 3P, 10kA bh
84 MCB 25A, 1P, 10 kA bh
116 MCB 6A, 1P, 6 kA bh
115 MCB 10A, 1P, 6 kA bh
84 Box panel 500 x 400 x 200 mm bh
85 Box panel 800 x 600 x 250 mm bh
86 Lampu Indikator bh
87 Fuse Lamp 2A bh
88 Digital Power Meter PM500 unit
89 Curent Transformator (CT) 500/5 A ls
90 Bus Bar sistem Cu 5x(20x5mm) ls
91 Sepatu kabel+ Sleeve+ Cable tie ls
92 Grounding sistem BC 16 mm2 ls
93 Grounding sistem BC 10 mm2 ls
94 Wiring + Pemasangan panel ls
95 Material bantu instalasi kabel ls

96 Steerable Column Array 24 x 2" Fullrange loudspeaker, 240W Giax unit


97 Steerable Column Array 12 x 2" Fullrange loudspeaker, 120W Axir unit
98 Wall mount Subwoofer 10" loudspeaker, 225W Baso10 unit
99 Wall mount Active fullrange 3-way 5" loudspeaker, 40W LX523 unit
100 Ceiling hanging mount Spherical fullrange 8" loudspeaker ASP20, 20W unit

Daftar Harga Upah dan Bahan page 37 of 49


SPESIFIKASI BAHAN /
NO URAIAN SATUAN HARGA SATUAN
MERK SEKUALITAS
101 Wall mount fullrange 2-way 6" loudspeaker Ateo6, 24W unit
102 Column Array 4 x 3" Fullrange loudspeaker, 20W CLS420 unit
103 Horn Speaker High Fidelity 2-way 12" 350W HS212T unit
104 Outlet for Audio Out x1 + SDI Video Out x1, Weatherized IP56 AVB-1 unit
Digital Matrix Controller 9in 8out, Automatic Gain Control,
105 Feedback Reduction, Timer Playback, Priority & Evacuation unit
Ready M2
106 Multichannel Power Amplifier with Loudspeaker processor 4 x 500W SMQ500 unit
107 Multichannel Power Amplifier with Loudspeaker processor 4 x 350W SMQ350 unit
Multichannel Power Amplifier with Loudspeaker processor 4
108 unit
x 240W @ 100V PMQ240
109 Paging Microphone APM104MK2 4 zone unit
110 All in one digital audio player CMP30- CD, MP#, Tuner unit
111 Soundbar Monitor speaker, 60W IMEO1 unit
112 PC with System Manager Software, Windows OS, Keyboard, Mouse, TV 32" unit
113 Rack Cabinet 30U, Cable Management, Power Distribution Unit, Fan, Connector unit
114 Wireless Microphone Receiver 4ch ACT314B unit
115 Wireless Microphone Transmitter Vocal Handheld ACT32H unit
116 Wireless Microphone Transmitter Vocal Lavalier ACT32T / MU53L unit
117 Wireless Microphone Transmitter Vocal Headset ACT32T / MU53H unit
118 Wireless Microphne Directional Antenna AT90W unit
119 Wired Microphone, Vocal, Dynamic, SuperCardioid MM39 unit
120 Wired Microphone, Vocal, Dynamic, Gooseneck Podium PDM200 unit
121 Audio cable for interconnection, Balance, AWG 24 @ 100 mtr Isopod SO-F22 unit
122 Audio cable for Microphone / Line, Balance, AWG 24 @ 100 mtr Stage 22 Highflex unit
123 Audio cable for multichannel line 8ch, AWG 26 @ 1 mtr Quantum QMC 08 unit
124 Audio Cable for Speaker, OFC, AWG 16 @ 100 mtr Meridian SP215 unit
125 Audio Connector, XLR, TS, Speakon, Barrier Strip (all set) unit
126 Installation system Lantai 1 unit
127 Installation system Lantai 2 unit
128 Installation system Control Room unit
129 Installation system Menara unit
130 Testing Commisioning & Tuning unit
131 Training & Maintenance unit

132 Air dan listrik kerja pkt


133 Gudang alat dan bahan (sewa) ls
134 Direksi keet (sewa) ls
135 Pengukuran dan Pemasangan bouwplank ls
136 Penyiapan RKK set
137 Induksi K3 (Safety Induction) org
138 Papan informasi K3 bh
139 Jaring pengamanan ls
140 Topi pelindung (Safety Helmet) bh
141 Pelindung mata (goggles, spectacles) psg
142 Tameng Muka (Face Shield) bh
143 Pelindung pernafasan dan mulut (Masker) bh
144 Sarung tangan (Safety Shoes) psg
145 Sepatu keselamatan (Safety Shoes) psg
146 Rompi keselamatan (Safety Vest) bh
147 Penunjang seluruh tubuh (Full Body Harness) bh
148 Asuransi ls
149 Ahli K3 Konstruksi OB
150 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat luka, Perban, dll) ls
151 Rambu-Rambu proyek bh
152 Jalur evakuasi bh
153 Alat Pemadam Api Ringan (APAR) bh
154 Bendera K3 bh
155 Pelatihan K3 : Pencegahan Covid-19 org
156 Penyediaan fasilitas kesehatan pencegahan Covid-19 (thermoscan, tabung oksigen, dll) ls
157 Peralatan pengasapan (fogging/ penyemprotan) ls
158 Pemeriksaan struktur bangunan pkt
159 Angkur galvanis HAS-U 5.8 M8x110 mm bh

Daftar Harga Upah dan Bahan page 38 of 49


SPESIFIKASI BAHAN /
NO URAIAN SATUAN HARGA SATUAN
MERK SEKUALITAS
160 Angkur galvanis HAS-U 5.8 M16x125 mm bh
161 HIT-RE 500 V3 ml
162 Besi strip kg
163 Jendela nako bh
164 Kaca, 3 mm Clear m2
165 Kunci tanam bh
166 Engsel bh
167 Playwood 120x240 cm, tebal = 4 mm lbr
168 Alat bantu pompa ls
169 Cat dasar zincromate kg
170 Cat penutup cat besi kg
171 Kawat las kg
172 Solar ltr
173 Minyak pelumas ltr
174 Sewa alat las jam
175 Aluminium foil double side woven m2
176 Kawat ayakan 1 x 1 cm m2
177 Genteng metal 0.35 mm m2
178 Nok bulat bh
179 Usuk dan reng baja ringan (G550) m2
180 Mustaka masjid dari bahan tembaga (terpasang) unit
181 Alat bantu bongkaran mustaka masjid existing ls
182 Flashing bh
183 kompon + kalsit bag
184 UB tape 75 Lm/roll roll
185 Sealent tube
186 Screw 25mm x 083 pcs
187 Paku + mesiu pcs
188 Aplikator plafon m2
189 Homogeneous tile 600 x 600 mm unpolished m2
190 Pipa stainless Ø 2" tebal 1.2 mm m'
191 Pipa BS Ø 2" tebal 1.6 mm + zincromate + cat besi m'
192 Hollow stainless steel 50x100x1,2 mm m'
193 Plat stainless steel, tebal 6 mm m2
194 Plat stainless steel, tebal 1.2 mm m2
195 Kaca tempered laminated 10 mm m2
196 Driver/ ballast bh
197 Jack hammer hari

Penawar
CV/PT

Direktur
NIP. 19650801 198602 1 002

Daftar Harga Upah dan Bahan page 39 of 49


No
SURVEI MATERIAL Tanggal
Lokasi
Owner

NO URAIAN SATUAN HARGA SATUAN

UPAH TENAGA :

1 Tukang Batu Org/Hari

2 Tukang Kayu Org/Hari

3 Tukang Besi Org/Hari

4 Tukang Cat Org/Hari

5 Tukang las Org/Hari

6 Kepala Tukang Batu Org/Hari

7 Kepala Tukang Kayu Org/Hari

8 Kepala Tukang Besi Org/Hari

9 Kepala Tukang Cat Org/Hari

10 Kepala Tukang las Org/Hari

11 Pekerja Org/Hari

12 Mandor Org/Hari

HARGA BAHAN :

1 Pasir Cor / Pasir Beton m3

2 Pasir Pasang m3

3 Pasir Urug m3

4 Tanah urug m3

5 Split 2/3 (mesin) m3

6 Krikil beton m3

7 Batu kali Belah 15/20 m3

8 Bata Merah Bh

9 Semen Portland (PC) kg

10 Homogeneous tile 600 x 600 mm tekstur m2

11 Semen warna kg

12 Besi Beton kg

Besi SNI dia 12mm batang

Besi SNI dia 10mm batang

Besi SNI dia 8mm batang

13 Kawat Bendrat kg

14 Baja IWF kg

15 Plat baja kg

Daftar Harga Upah dan Bahan page 40 of 49


NO URAIAN SATUAN HARGA SATUAN

16 Paku Besar/Sedang kg

17 Kayu papan kelas III (begesting) m3

18 Balok Kayu kelas II (begesting) m3

19 Papan bengkirai m3

20 Stamper (sewa) jam

21 Excavator (sewa) jam

22 Print outdoor flexi m2

23 Usuk Profil C75 m1

24 Screw S12 bh

25 Genteng bubung penutup bh

26 Woodplank 4050x200x8mm m1

27 Furing Chanel PN204 btg

28 Top Cross Rail PN200 btg

29 Wall angle PN212 EX btg

30 Conector PN 210 pcs

31 Susp. Clip PN 223 pcs

32 Susp. Rod PN 225 btg

33 Angle Clip PN 220/221 pcs

34 Direct fix clip PN219 pcs

35 Dynabolt Ø 10 bh

36 Gypsum board (1200 x 2400mm) t: 9 mm Lbr

37 Plafond Akustik 120 x 240 cm, t = 12 mm lbr

38 List plafond shadow line m1

39 Kayu dolken btg

40 Seng gelombang BJLS 32 lbr

41 Baut M12 (gording) bh

42 HILTI HAS-E (5,8) M8 + HIT RE-500 bh

43 Bolt Ø 16 mm (A325) (I/WF) bh

44 Angkur HILTI HAS-E (5,8) M16 +HIT-RE 500V3 bh

45 Grouting tebal = 30 mm bh

46 Cat dasar tembok luar ltr

47 Cat Tembok luar ltr

48 Cat dasar untuk genteng ltr

49 Cat genteng ltr

Daftar Harga Upah dan Bahan page 41 of 49


NO URAIAN SATUAN HARGA SATUAN

50 Cat dasar plafond kg

51 Cat plafond kg

52 Cat besi kg

53 Waterproofing coating untuk KM/ WC (terpasang) m2

54 Kabel NYM 2 x 2.5 mm2 m1

55 Kabel NYM 3x2.5 mm2 m1

56 Kabel NYY 4 x 6 mm2 m1

57 Kabel NYY 4 x 10 mm2 m1

58 Kabel NYY 4 x 16 mm2 m1

59 Downlight Slim LED 12 W 4000K bh

60 Lampu Baret 12 W 4000K bh

61 Lampu Down Light Ø 5" Essential 11 W bh

62 Led Panel 300 x 1200 mm 34 W 4000K bh

63 Lampu baret 22 W bh

64 Exhaust Fan Sirocco 10" 180 CMH 19 W bh

65 LED strip 4.8 W/m (6000 mm) unit

66 LED strip 4.8 W/m (8000 mm) unit

67 LED strip 4.8 W/m (10000 mm) unit

68 LED strip 4.8 W/m (60400 mm) unit

69 LED strip 4.8 W/m (72000 mm) unit

70 LED strip 4.8 W/m (83600 mm) unit

71 LED strip 4.8 W/m (95200 mm) unit

72 LED strip 4.8 W/m (102880 mm) unit

73 Lampu Up & Down Light LED 10 W 4000K unit

74 Inbow doos seng bh

75 Pipa Conduit PVC dia. 20 mm m1

76 Saklar tunggal bh

77 Saklar ganda bh

78 Saklar tukar bh

79 Stop kontak bh

80 MCCB 15A, 3P, 10kA bh

81 MCCB 30A, 3P, 10kA bh

82 MCCB 40A, 3P, 10kA bh

83 MCCB 50A, 3P, 10kA bh

Daftar Harga Upah dan Bahan page 42 of 49


NO URAIAN SATUAN HARGA SATUAN

84 MCB 25A, 1P, 10 kA bh

85 MCB 6A, 1P, 6 kA bh

86 MCB 10A, 1P, 6 kA bh

87 Box panel 500 x 400 x 200 mm bh

88 Box panel 800 x 600 x 250 mm bh

89 Lampu Indikator bh

90 Fuse Lamp 2A bh

91 Digital Power Meter PM500 unit

92 Curent Transformator (CT) 500/5 A ls

93 Bus Bar sistem Cu 5x(20x5mm) ls

94 Sepatu kabel+ Sleeve+ Cable tie ls

95 Grounding sistem BC 16 mm2 ls

96 Grounding sistem BC 10 mm2 ls

97 Wiring + Pemasangan panel ls

98 Material bantu instalasi kabel ls

99 Material bantu instalasi lampu ls

100 Steerable Column Array 24 x 2" Fullrange loudspeaker, 240W Giax unit

101 Steerable Column Array 12 x 2" Fullrange loudspeaker, 120W Axir unit

102 Wall mount Subwoofer 10" loudspeaker, 225W Baso10 unit

103 Wall mount Active fullrange 3-way 5" loudspeaker, 40W LX523 unit

104 Ceiling hanging mount Spherical fullrange 8" loudspeaker ASP20, 2 unit

105 Wall mount fullrange 2-way 6" loudspeaker Ateo6, 24W unit

106 Column Array 4 x 3" Fullrange loudspeaker, 20W CLS420 unit

107 Horn Speaker High Fidelity 2-way 12" 350W HS212T unit

108 Outlet for Audio Out x1 + SDI Video Out x1, Weatherized IP56 AVB-1 unit

Digital Matrix Controller 9in 8out, Automatic Gain Control, Feedback


109 unit
Reduction, Timer Playback, Priority & Evacuation Ready M2

110 Multichannel Power Amplifier with Loudspeaker processor 4 x 500 unit

111 Multichannel Power Amplifier with Loudspeaker processor 4 x 350 unit

Multichannel Power Amplifier with Loudspeaker processor 4 x 240W


112 unit
@ 100V PMQ240

113 Paging Microphone APM104MK2 4 zone unit

114 All in one digital audio player CMP30- CD, MP#, Tuner unit

115 Soundbar Monitor speaker, 60W IMEO1 unit

116 PC with System Manager Software, Windows OS, Keyboard, Mouse, unit

117 Rack Cabinet 30U, Cable Management, Power Distribution Unit, Fan, unit

Daftar Harga Upah dan Bahan page 43 of 49


NO URAIAN SATUAN HARGA SATUAN

118 Wireless Microphone Receiver 4ch ACT314B unit

119 Wireless Microphone Transmitter Vocal Handheld ACT32H unit

120 Wireless Microphone Transmitter Vocal Lavalier ACT32T / MU53L unit

121 Wireless Microphone Transmitter Vocal Headset ACT32T / MU53H unit

122 Wireless Microphne Directional Antenna AT90W unit

123 Wired Microphone, Vocal, Dynamic, SuperCardioid MM39 unit

124 Wired Microphone, Vocal, Dynamic, Gooseneck Podium PDM200 unit

125 Audio cable for interconnection, Balance, AWG 24 @ 100 mtr Isopod unit

126 Audio cable for Microphone / Line, Balance, AWG 24 @ 100 mtr Stage unit

127 Audio cable for multichannel line 8ch, AWG 26 @ 1 mtr Quantum QM unit

128 Audio Cable for Speaker, OFC, AWG 16 @ 100 mtr Meridian SP215 unit

129 Audio Connector, XLR, TS, Speakon, Barrier Strip (all set) unit

130 Installation system Lantai 1 unit

131 Installation system Lantai 2 unit

132 Installation system Control Room unit

133 Installation system Menara unit

134 Testing Commisioning & Tuning unit

135 Training & Maintenance unit

136 Batu Split 1/2 m3

137 Batu belah Putih m3

138 Sirtu m3

139 Kerikil beton pecah m3

140 Bata merah (5x10x20 ) bj

141 Batako bj

142 Portland Cement (PC) 40 Kg kg

143 Semen warna - grouting kg

144 Lem kayu (putih) Fox kg

145 Floor Hardener kg

146 Tegel keramik (20 x 25) ex,mulia m2

147 Tegel keramik (20 x 20) ex,mulia m2

148 Tegel keramik 40x40 m2

149 Tegel keramik 40x40 m2

150 Stepnosing bh

151 Batu Alam m2

Daftar Harga Upah dan Bahan page 44 of 49


NO URAIAN SATUAN HARGA SATUAN

152 Kayu kelas lll m3

153 Kayu bengkirai papan m3

154 Kayu bengkirai 5/7 m3

155 Kayu bengkirai 6/12 m3

156 Kayu bengkirai 8/12 m3

157 Kayu bengkirai 4/6 m3

158 Kayu bengkirai 2/3 m3

159 Kayu kruwing papan m3

160 Kayu kruwing 5/7 m3

161 Kayu kruwing 6/12 m3

162 Kayu kruwing 8/12 m3

163 Kayu kruwing 4/6 m3

164 Kayu kruwing 2/3 m3

165 Kayu glugu ukuran m3

166 Kayu Meranti Papan m3

167 kayu kelas ll m3

168 Kayu Bekesting m3

169 Kayu Penyangga Dolken btng

170 multiplek uk. 122x244x3 mm lbr

171 Multiplek uk. 122x244x9 mm lbr

172 Multiplek uk. 122x244x12 mm lbr

173 Multiplek uk. 122x244x18 mm lbr

174 Teak wood uk 90x240 lbr

175 Kloset jongkok putih INA bh

176 Kloset duduk INA bh

177 Urinoir toto bh

178 Bak cuci stainless steel bh

179 wastafel, ex= toto bh

180 kran wastafel bh

181 Floordrain bh

182 Roof Drain bh

183 Kran ؽ" bh

184 Kran Dapur bh

185 Pintu PVC bh

Daftar Harga Upah dan Bahan page 45 of 49


NO URAIAN SATUAN HARGA SATUAN

186 water torn 550 lt bh

187 Genteng keramik kanmuri bh

188 Nok genteng kanmuri bh

189 Atap metal berpasir bh

190 Bubungan atap berpasir bh

191 Seng Gelombang lbr

192 Seng Plat lebar 50 cm lbr

193 atap galvalum tebal 0,3 mm m'

194 Tepung Gypsum kg

195 Kalsiboard ( 120 x 240 x 0,35 ) cm lbr

196 Gypsum board tebal 9 mm lbr

197 List gypsum m'

198 baja profil C75 kg

199 Kaca bening 3 mm m2

200 Kaca bening 5 mm m2

201 Kaca Bening 8 mm m2

202 Kaca Tempred 6 mm m2

203 Kaca Tempred 8 mm m2

204 Kaca Tempred 10 mm m2

205 Kaca Tempred 12 mm m2

206 Kaca cermin bevel unit

207 Cat besi kg

208 Cat meni besi sinkromat kg

209 Cat Tembok sekualitas Catylac Biasa (ENVI) kg

210 Cat Tembok sekualitas Catylac Eksterior (WATER PROOFING) kg

211 Thinner ltr

212 Alkali Primer kg

213 water profing m2

214 Coating Propan kg

215 Besi beton polos kg

216 Besi beton ulir kg

217 Besi baja prof il kg

218 Besi strip kg

219 Baja WF kg

Daftar Harga Upah dan Bahan page 46 of 49


NO URAIAN SATUAN HARGA SATUAN

220 pipa besi gip 3 ' m'

221 angkur m19 bh

222 wiremesh m4 m2

223 pipa stainlees steel dia 3' ljr

224 pipa stainlees steel dia 2' ljr

225 pipa stainless steel dia 1" ljr

226 kusen aluminium 4 inch- Ex =alexindo m1

227 Profil Pintu alluminium m1

228 Profil Daun Jendela alluminium m1

229 Profil Kaca t =5 mmkaca polos m1

230 Skrup fixer bh

231 Sealant Bh

232 Floor hinges, ex = Dekson set

233 Over panel, ex=Solid set

234 Top patch fitting, ex= Dekson set

235 Bottom patch fitting, ex=Dekson set

236 Bottom patch lock + cylinder set

237 Pull handle, ex = Solid set

238 Door closer = Dekson set

239 Aluminium profil U m1

240 Kawat beton / bendrat kg

241 Stick Las bh

242 Kawat penggantung rangka hollow m1

243 hollow galvanis 40.40.2 mm m1

244 Hollow 20.20.1,1mm m1

245 Tipe grass blok tebal 10cm K1 75-200 m2

246 Buis beton dia 80 tebal 4.5 cm bh

247 Roster uk 15x15 bh

248 Bambu apus btg

249 Paku Biasa kg

250 Paku plepet 40 x 2,1 mm kg

251 Paku besar, sedang kg

252 Paku skrup kg

253 GRC kerawang m2

Daftar Harga Upah dan Bahan page 47 of 49


NO URAIAN SATUAN HARGA SATUAN

254 listplank GRC cetak m1

255 ornamen kuncup bunga melati bh

256 Pipa PVC Aw 0.5" (wavin/rucika) panjang 4 m ljr

257 Pipa PVC Aw 0.75" (wavin/rucika) panjang 4 m ljr

258 Pipa PVC Aw 1" (wavin/rucika) panjang 4 m ljr

259 Pipa PVC Aw 1.25" (wavin/rucika) panjang 4 m ljr

260 Pipa PVC Aw 1.5" (wavin/rucika) panjang 4 m ljr

261 Pipa PVC Aw 2" (wavin/rucika) panjang 4 m ljr

262 Pipa PVC Aw 3" (wavin/rucika) panjang 4 m ljr

263 Pipa PVC Aw 4" (wavin/rucika) panjang 4 m ljr

264 Pipa PVC D 1.5" (wavin/rucika) panjang 4 m ljr

265 Pipa PVC D 2" (wavin/rucika) panjang 4 m ljr

266 Pipa PVC D 3" (wavin/rucika) panjang 4 m ljr

267 Pipa PVC D 4" (wavin/rucika) panjang 4 m ljr

268 Pompa air sumur dangkal 250 watt unit

269 Engsel Pintu bh

270 Engsel Jendela bh

271 Grendel - Jendela bh

272 Kunci tanam besar- ex Solid bh

273 Kunci tanam besar- ex yale bh

274 Kunci tanam kecil- ex yale bh

275 Door closer -ex Virenzo bh

276 Door holder bh

277 Air Liter

278 Print outdoor flexi Pices

279 Minyak Bekesting Liter

280 Sewa Scafolding Unit

281 Sealtape bh

282 Glass block 20x20 cm bh

283 Alumunium composite panel (ACP) m2

284 hollow besi galvanis 4x4x1 mm btg

285 breaket siku/ stiffner btg

286 Sealent tube

287 media tanam tanah subur m3

Daftar Harga Upah dan Bahan page 48 of 49


NO URAIAN SATUAN HARGA SATUAN

288 m3
Ready mix beton K-400 holcim
289
Ready mix beton K-300 holcim
m3

290
Ready mix beton K-250 holcim
m3

291
Ready mix beton K-225 holcim
m3

292
Tanaman Vegetasi ''Cemara Lilin'' tinggi 2 m
btg

293
Tanaman Vegetasi ''Tabernaemontana Corymbosa''
btg

294
Water Fountain Precast Beton
bh

Daftar Harga Upah dan Bahan page 49 of 49