You are on page 1of 5
METHOD STATEMENT OF PAINTING WORK | Reson 0 Prepared 10° ly Per : 2019 SDs HD. B&I/MS/ASTER/12 CADANGAN PEMBANGUNAN YANG = MENGANDUNGI A) | BLOK PANGSAPURI PERKHIDMATAN (960 UNIT) 36TINGKAT, B) 7TINGKAT TEMPATLETAK KERETA ©) LTINGKAT LOBI & MEZZANINIE D) 2TINGKAT KEMUDAHAN PENDUDUK & KEMUDAHAN UTILITL DI_ATAS LOTPT 15287, JALAN CHERAS HARTAMAS, MUKIM PETALING DAERAH KUALA LUMPUR WILAYAH PERSEKUTUAN UNTUK TETUAN:AMBER HOMES CHERAS SDN. BED. METHOD STATEMENT OF PA WORK Prepared by’ Reviewed by: Accepted by: Date: Noremy Shuhada Binti | KK Tan Hamdan Project Manager CL#0 Architect Sdn, Bhd. age fy o= Accepted aE T HT J Date: (07 Hf Accepted with Reject Page No. Revision 0 METHOD STATEMENT OF PAINTING WORKS | Prepared :10" July 2019 CONTENT 1.0 Objective 2.0 Scope of Work 3.0 References 4.0 Construction methods 5.0 Safety Page No. Revision: 0 > METHOD STATEMENT OF PAINTING WORKS | Prepared :10% July Sv aa 1.0 OBJECTIVE This method statement provides information concerning the plant, equipment and manpower and method of construction to ensure compliance with contract requirements, drawings, technical specification and quality control. 2.0 SCOPE OF WORK The scope of work comprises the materials and application of painting works for internal and external wall, column, soffit, beam, door leaf & ete. for the building, 3.0 REFERENCES ‘This method statement shall be read in conjunction with the following documents: + Contract Specification and Construction drawings. 4.0 CONSTRUCTION METHODS 4.1 Storage of Material a) The materials and the storage area are properly labelled to indicate the ‘material status at all times, b) Store materials in a cool, well-ventilated and dry place; away from direct sunlight. ©) Ensure adequate ventilation during painting works 4) Keep materials away from heat sources. ©) All materials are under the responsibility of the Material Controller and the supervisor on duty at each floor level. f) All material must be collected and retumed to designated storage area after working hours and properly secured and locked. Page No. Revision :0 LE METHOD STATEMENT OF PAINTING WORKS | Prepared :10" July PEMTINAAN INFRA EAD 2019 4) ng of Material All equipment and materials will be handled in such a manner as not to damage the item and hence its performance. Purchasing materials will be coordinated and planned in accordance with the delivery needs of the various phase of the overall project. OnSite ‘© Prior to site delivery, detailed and comprehensive arrangements will be made to ensure the most efficient hoisting and distribution of materials into the site areas, ‘The schedule is divided into phases to suit the overall programme. ‘This will allow materials and equipment to be marshalled just in time for the installation commencement of these phases, maximizing efficiency of delivering and minimizing storage equipment. Upon delivery, material and equipment will be unloaded by crane ot bottom truck with appropriate lifting capacity. 4.3 Application - Painting Works a) General Substrate Requirement The plastering to wall, soffit and column, door leaf etc. Must be of free from any debris by using smooth sponge or steel trowel finished b) Method of Application- Internal Finishes Prepare and apply undereoat paint. Prepare and apply 1 finish coat of paint after undercoat, Accordance to manufacturer's standard specification and instruction, The 2 finish coats shall be ap; Inspection and rectification done fi Delivery Inspection. after all work of Pre Delivery ish coat to be last item for Pre Page No, Revision :0 Ep METHOD STATEMENT OF PAINTING WORKS | Prepared :10* July ENNAAU IRA EAS 2019 ©) Method of Application- Extemal Finishes Prepare and apply one coat of sealer undercoat accordance to manufacturer's standard specification and instruction, ‘The application shall be applied using roller, brush or spray. Prepare and apply 1* finish coat of weather paint diluted with clear water accordance to manufacturer’s standard specification and instruction. The 2" finish coats shall be apply after Pre Delivery Inspection of external wall finishing inspection done. 5.0 SAFETY All work will be planned and undertaken in accordance with the Project Safety Regulation, All activities will be undertaken with safety in mind ensuring that Personal Protective Equipment are being used at all times.

You might also like