Time frame for execution of the construction project: 2nd August, 2011 – 15th October, 2011
The objectives planned to be achieved by this construction project are stated below:
To start with, this project, a workshop is to be organized first in collaboration with the local
municipal authorities and discuss all pros and cons of the construction issue in that particular
area.
A project manager is to be appointed who is to prepare the construction schedule, allocate
manpower, equipments and machines and also handle the budget.
Other workers need to be assigned for different jobs involved in the project.
Each step of construction needs proper analysis and corrections whenever required.
A final overview is to be prepared after completion of the project.