You are on page 1of 3

Sl. No.

Description Make Qty Rate Price


1 Electric Motor 10 HP Capacity Seimens 2
2 Dowty Gear Pump 3P3380 --- 170 LPM Dowty 2
3 Bell Housing Coupling Amey 2
4 40 NB Valves Konin
Velocity through ports and their selection

Port Tube OD Thickness Tube ID A (cm^2) Q (LPM) Velocity(cm/s) Velocity (m/s)


G1/4 6 1 4 0.125664 346 45889.6752582 458.896752582
G3/8 10 1.5 7 0.384845 346 14984.3837578 149.843837578
G1/2 16 2.5 11 0.950332 346 6068.05623248 60.6805623248
G3/4 20 3 14 1.53938 346 3746.09593944 37.4609593944
G1 25 3.5 18 2.54469 346 2266.15680287 22.6615680287
G1 1/4 30 4 22 3.801327 346 1517.01405812 15.1701405812
G1 1/2 38 5 28 6.157522 346 936.52398486 9.3652398486
40 NB 48 5 38 11.34115 346 508.472856046 5.08472856046
50 NB 60 6 48 18.09557 346 318.678300404 3.18678300404
65 NB 75 6 63 31.17245 346 184.992392071 1.84992392071

Piston Speed Calculation


Specifications Units
Bore Dia mm 150
Rod Dia mm 90
Bore Area mm^2 17671.46
Annulus area mm^2 11309.73
Flow LPM 10
Forward Speed mm/s 9.431404
Return Speed mm/s 14.73657
G 1/4 13.16
G 3/8 16.66
G 1/2 20.44
G 3/4 26.44
G1 33.24
G 1 1 /4 41.91
G 1 1/2 47.8
Note
Velocity Through Pressure Line = 4-8 m/s
Velocity Through Suction Line = 1-1.5 m/s
Velocity Through Drain Line = 1.5-4 m/s

Velocity of Piston = 15-300 mm/s

You might also like