TRAINING COURSE SCHEDULE 2020

BKI ACADEMY - PT. BIRO KLASIFIKASI INDONESIA (Persero)


Rev 03
INVESTATION FEE MONTH
NO. TRAINING COURSE DURATION
BASIC PROFESSIONAL BUSINESS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DES
I MARITIME CATEGORY
A SAFETY SUB CATEGORY
1 Internal Auditor ISM Code 7.700.000 9.762.500 10.340.000 3 Hari 15-17 16-18 22-24 10-12 21-23 09-11
2 Designated Person Ashore ISM Code 8.800.000 10.862.500 11.440.000 3 Hari 12-14 15-17 24-26 12-14 26-28 14-16
3 Risk Assessment ISM Code 7.150.000 9.212.500 9.790.000 3 Hari 15-17 20-22 25-27
4 Marine Accident and Investigation 7.150.000 9.212.500 9.790.000 3 Hari 15-17 10-12 02-04
5 Jetty & Loading Master 8.800.000 10.862.500 11.440.000 3 Hari 15-17 10-12 02-04
6 IMDG Code*) 6.600.000 8.662.500 9.240.000 3 Hari

B SECURITY SUB CATEGORY


7 Internal Auditor ISPS Code 8.250.000 10.312.500 10.890.000 3 Hari 26-28 01-03 15-17 12-14 07-09
8 CSO ISPS Code 9.350.000 11.412.500 11.990.000 3 Hari 18-20 22-24 07-09 02-04
9 PFSO ISPS Code 9.350.000 11.412.500 11.990.000 3 Hari 15-17 15-17 24-26 26-28 21-23 16-18

C SURVEY SUB CATEGORY


10 Marine Surveyor (Basic) 10.450.000 13.887.500 14.850.000 5 Hari 16-20 22-26 14-18 07-11
11 Container Inspector 8.800.000 11.550.000 12.320.000 4 Hari 17-20 25-28 24-27
Marine Superintendent & PSC Inspection
12 13.200.000 16.637.500 17.600.000 5 Hari 13-18 24-28 09-13
(Marine Surveyor Level II)
Technical Superintendent (Marine Surveyor
13 13.200.000 16.637.500 17.600.000 5 Hari 30 Mar-03 Apr 06-10 23-27
Level II)

D CREWING SUB CATEGORY


14 Maritime Labour Convention 2006 7.150.000 9.212.500 9.790.000 3 Hari 24-26 16-18 15-18

E ENVIRONMENT SUB CATEGORY


15 Ballast Water Management 6.600.000 8.662.500 9.240.000 3 Hari 15-17 26-28 16-18
16 Marpol Oil Outflow 6.600.000 8.662.500 9.240.000 3 Hari 26-28 22-24 12-14

F SHIP DESIGN SUB CATEGORY


Ship-Intact Stability & Ship-Damage Stability
17 9.900.000 13.337.500 14.300.000 5 Hari 13-17 13-17 16-20
Calculation
18 Ship Handling & Maneuvering 6.600.000 8.662.500 9.240.000 3 Hari 24-26 16-18 09-11
19 Ship-Design Engineering Review Workshop 9.900.000 13.337.500 14.300.000 5 Hari 16-20 13-17 23-27
G IMO MODEL COURSE SUB CATEGORY
20 6.09 Training Of Trainer (TOT) 8.800.000 16.060.000 18.480.000 8 Hari 09-18 06-15 07-16
3.24 Security Awareness Training For Port
21 Facility Personal with Designated Security 2 Hari
Duties *)
3.25 Security Awareness Training for all Port
22 1 Hari
Facility Personnel *)

OCCAPUTATIONAL HEALTH AND SAFETY


II CATEGORY
A KEMNAKER CERTIFICATION SUB CATEGORY
23 Ahli K3 Umum 9.350.000 17.270.000 19.910.000 12 Hari 02-17 06-21 09-24
24 Auditor SMK3 5.500.000 8.140.000 9.020.000 4 Hari 15-18 07-10
25 Ahli K3 Pesawat Angkat dan Angkut 25.300.000 25 Hari 06 Jan-07 Feb 31 Aug-25 Sep
26 Operator K3 Forklift Kelas I 6.600.000 9.240.000 10.120.000 4 Hari 16-18 22-24 18-20
27 Operator K3 Forklift Kelas II 5.500.000 7.480.000 8.140.000 3 Hari 16-18 22-24 18-20
28 Operator K3 Crane Kelas I 7.700.000 11.000.000 12.100.000 5 Hari 24-27 15-19 20-23
29 Operator K3 Crane Kelas II 6.600.000 9.240.000 10.120.000 4 Hari 24-27 15-19 20-23
30 Operator K3 Crane Kelas III 5.500.000 7.480.000 8.140.000 3 Hari 24-27 15-19 20-23
Operator K3 Gondola, Conveyor, Mesin
31 5.500.000 7.480.000 8.140.000 3 Hari 24-26 21-23
Pancang
32 Operator K3 Rigger 5.500.000 7.480.000 8.140.000 3 Hari 24-26 21-23
33 Ahli K3 Elevator & Eskalator 16.500.000 19.800.000 20.900.000 12 Hari 08-24 05-21
34 Teknisi K3 Elevator & Eskalator 8.800.000 12.760.000 14.080.000 6 Hari 20-25 24-29 23-28
35 Operator K3 Elevator & Eskalator 6.600.000 9.900.000 11.000.000 5 Hari 20-24 24-28 23-27
36 Ahli K3 Listrik 18.700.000 26.620.000 29.260.000 17 Hari 10 Feb-03 Mar 07 Sep-09 Oct
37 Teknisi K3 Listrik 8.800.000 12.760.000 14.080.000 6 Hari 30 Mar-04 Apr 21-26 07-12
38 Ahli K3 Pesawat Uap & Bejana Tekan 25.300.000 25 Hari 03 Feb-06 Mar 09 Nov-11 Des
39 Operator Pesawat Uap Kelas I 8.800.000 12.760.000 14.080.000 6 Hari 13-18 24-29 07-12
40 Operator Pesawat Uap Kelas II 6.600.000 9.240.000 10.120.000 4 Hari 13-16 24-27 07-10
41 Ahli K3 Pesawat Tenaga Produksi 25.300.000 25 Hari 15 Jun-17 Jul 16 Nov-18 Des
Operator Mesin Produksi, Perkakas, Tanur
42 6.600.000 9.900.000 11.000.000 5 Hari 16-20 13-17 23-27
Kelas I
Operator Mesin Produksi, Perkakas, Tanur
43 5.500.000 8.140.000 9.020.000 4 Hari 16-19 13-16 23-26
Kelas II
44 Operator Mesin Las, Juru Las Karbit 14.300.000 16.940.000 17.820.000 4 Hari 16-19 13-16 23-26
45 Juru Las Listrik dan Gas Kelas I 19.800.000 23.100.000 24.200.000 5 Hari 22-26 19-23
46 Juru Las Listrik dan Gas Kelas II 18.700.000 21.340.000 22.220.000 4 Hari 22-25 19-22
47 Juru Las Listrik dan Gas Kelas III 17.600.000 20.240.000 21.120.000 4 Hari 22-25 19-22
48 Kebakaran Kelas A (Ahli K3 Kebakaran) 8.800.000 12.760.000 14.080.000 6 Hari 16-21 22-27 21-26 07-12
49 Kebakaran Kelas B 8.800.000 12.760.000 14.080.000 6 Hari 16-21 22-27 21-26 07-12
50 Kebakaran Kelas C 9.900.000 13.860.000 15.180.000 6 Hari 16-21 22-27 21-26 07-12
51 Kebakaran Kelas D 5.500.000 7.480.000 8.140.000 3 Hari 16-18 22-24 21-23 07-09
Teknisi/Petugas Pemeriksa Penguji PAA, PTP,
52 13.200.000 19.140.000 21.120.000 9 Hari 30 Mar-09 Apr 06-16 16-26
PUPT
53 Ahli K3 Kimia 14.300.000 22.220.000 24.860.000 12 Hari 08-24 05-21
54 Petugas K3 Kimia 8.800.000 12.760.000 14.080.000 6 Hari 16-21 22-27 21-26 07-12
55 Ahli K3 Muda Lingkungan Kerja 6.600.000 9.240.000 10.120.000 4 Hari 16-19 13-16 23-26
56 Ahli K3 Madya Lingkungan Kerja 7.150.000 9.790.000 10.670.000 4 Hari 16-19 13-16 23-26
57 Ahli K3 Utama Lingkungan Kerja 7.700.000 10.340.000 11.220.000 4 Hari 16-19 13-16 23-26
Petugas K3 Madya Ruang Terbatas (Confined
58 5.500.000 7.480.000 8.140.000 3 Hari 15-17 10-12 02-04
Space)
Petugas K3 Utama Ruang Terbatas (Confined
59 7.700.000 11.000.000 12.100.000 5 Hari 13-17 10-14 30 Nov-04 Des
Petugas
Space) K3 Penyelamat Ruang Terbatas
60 (Confined Space) 5.500.000 7.480.000 8.140.000 3 Hari 15-17 10-12 02-04
61 Petugas K3 Deteksi Gas 4.400.000 5.720.000 6.160.000 2 Hari 16-17 22-23 21-22 07-08
62 Teknisi K3 Pestisida 5.500.000 7.480.000 8.140.000 3 Hari 13-15 25-27
63 Petugas K3 Asbes 5.500.000 7.480.000 8.140.000 3 Hari 22-24 19-21
64 HIPERKES untuk Paramedis 6.600.000 9.900.000 11.000.000 5 Hari 13-17 10-14 30 Nov-04 Des
65 HIPERKES untuk Dokter 7.700.000 11.660.000 12.980.000 6 Hari 13-18 10-15 30 Nov-05 Des
66 P3K di Tempat Kerja 4.950.000 6.930.000 7.590.000 3 Hari 15-17 25-27

B BNSP CERTIFICATION SUB CATEGORY


67 Ahli K3 Muda 5.500.000 8.140.000 9.020.000 4 Hari 06-09 10-13 07-10
68 Ahli Higiene Industri Muda 7.700.000 11.660.000 12.980.000 6 Hari 22-27 19-24
69 Ahli Higiene Industri Madya 8.800.000 12.760.000 14.080.000 6 Hari 22-27 19-24
70 Paramedis K3 Muda 5.500.000 7.480.000 8.140.000 3 Hari 13-15 10-12 30 Nov-02 Des
71 Dokter Perusahaan 6.600.000 9.240.000 10.120.000 4 Hari 13-16 10-13 30 Nov-03 Des
72 Teknisi-1 K3 Bekerja di Ketinggian 7.700.000 10.340.000 11.220.000 4 Hari 16-19 22-25 18-21
73 Teknisi-2 K3 Bekerja di Ketinggian 6.600.000 8.580.000 9.240.000 3 Hari 16-18 22-24 18-20
Entran K3 Bekerja di Ruang Terbatas
74 5.500.000 7.480.000 8.140.000 3 Hari 15-17 10-12 02-04
(Confined Space)
Atendant K3 Bekerja di Ruang Terbatas
75 6.600.000 8.580.000 9.240.000 3 Hari 15-17 10-12 02-04
(Confined Space)
Supervisor K3 Bekerja di Ruang Terbatas
76 7.700.000 10.340.000 11.220.000 4 Hari 15-18 10-13 02-05
(Confined Space)
77 HAZOPS 5.500.000 8.140.000 9.020.000 4 Hari 06-09 20-23 19-22
78 Petugas K3 Laboratorium 4.950.000 6.930.000 7.590.000 3 Hari 20-22 26-28 23-25
79 Petugas P3K 4.950.000 6.930.000 7.590.000 3 Hari 26-28 24-26 28-30 07-09
80 Operator K3 Migas 6.600.000 9.240.000 10.120.000 4 Hari 24-27 15-19 20-23
81 Pengawas K3 Migas 7.425.000 10.725.000 11.825.000 5 Hari 16-20 22-26 21-25 14-18
82 Pengawas Utama K3 Migas 8.800.000 12.100.000 13.200.000 5 Hari 13-17 13-17 16-20
NEBOSH & IOSH CERTIFICATION SUB
C CATEGORY
83 NEBOSH Intenational General Certificate 27.500.000 34.760.000 37.180.000 10 Hari 17-28 07-18

III ENERGY CATEGORY


A OIL AND GAS SUB CATEGORY
84 Welding Inspector 19.250.000 28 Hari 09 Mar - 11 Apr 08 Jun - 09 Jul 01 Sep-02 Oct 16 Nov-17 Des
85 Inspektur Instalasi 26.400.000 8 Hari 15-24 05-14
86 Inspektur Katup Pengaman & Pemutus Segel 17.600.000 6 Hari 03-12 01-10
87 Inspektur Bejana Tekan 17.600.000 12 hari 10-25 07-22
88 Inspektur Tangki Penimbun 17.600.000 14 hari 06-23
89 Inspektur Pesawat Angkat Angkut 18.700.000 12 Hari 02-17 09-24
90 Inspektur Peralatan Putar/Rotating Equipment 16.500.000 10 hari 08-19 16-27
91 Inspektur Platform 18.700.000 10 Hari 08-19 16-27
92 Inspektur Kelistrikan 16.500.000 8 hari 06-15 07-17
93 Inspektur Pipa Penyalur 17.600.000 14 Hari 08-25 07-24 01-18
Inspektur Sistem Alat Ukur Serah Terima
94 17.600.000 24.200.000 26.400.000 10 Hari 06-17 05-16
(Metering)
95 Inspektur RIG 19.800.000 23.760.000 25.080.000 6 Hari 03-10 01-08
96 Inspektur K3 15.400.000 18.040.000 18.920.000 4 Hari 16-19 20-23 23-26
97 Inspektur Handak (Bahan Peledak) 17.600.000 24.200.000 26.400.000 10 Hari 22 Jun-03 Jul 23 Nov-04 Des

B MINING AND COAL SUB CATEGORY


Pengawas Operasional Pertama
98 9.900.000 12.540.000 13.420.000 4 Hari 06-09 20-23 23-30
Pertambangan (POP)
Pengawas Operasional Madya Pertambangan
99 12.100.000 16.060.000 17.380.000 5 Hari 13-17 21-28
(POM)
Pengawas Operasional Utama Pertambangan
100 14.300.000 18.260.000 19.580.000 6 Hari 09-16 22-29 07-14
(POU)
Petugas Pengambil Contoh Uji Batubara
101 8.250.000 9.570.000 10.010.000 2 Hari 27-28 29-30 22-23
(Sampler)
102 Petugas Penguji Contoh Uji Batubara (Analis) 9.350.000 10.670.000 11.110.000 2 Hari 30-31 23-24 26-27
103 Petugas Verifikasi Teknis Batubara (Surveyor) 9.350.000 10.670.000 11.110.000 2 Hari 16-17 13-14 14-15

C CORROSION SUB CATEGORY


104 Catodic Protection 11.000.000 14.300.000 15.400.000 5 Hari 13-17 21-28
105 Coating Inspector 11.000.000 14.300.000 15.400.000 5 Hari 13-17 21-28

IV MANAGEMENT SYSTEM CATEGORY


A ISO SERIES SUB CATEGORY
ISO 9001:2015 - Quality Management System
106 2.750.000 3.410.000 3.630.000 1 Hari 13 28 09
(Understanding and Implementing)
ISO 9001:2015 - Quality Management System
107 6.600.000 8.580.000 9.240.000 3 Hari 13-15 28-30 09-11
(Auditor)
ISO 9001:2015 - Quality Management System
108 9.900.000 13.200.000 14.300.000 5 Hari 13-17 28 Sep-02 Oct 07-11
(Lead Auditor)
ISO 14001:2015 - Environmental
109 2.750.000 3.410.000 3.630.000 1 Hari 22 16
Management System (Understanding and
ISO 9001:2015 - Quality Management System
110 6.600.000 8.580.000 9.240.000 3 Hari 24-26 18-20
(Auditor)
ISO 9001:2015 - Quality Management System
111 9.900.000 13.200.000 14.300.000 5 Hari 22-26 16-20
(Lead Auditor)
ISO 31000:2009 - Risk Management
112 2.750.000 4.730.000 3.630.000 1 Hari 20 14
(Understanding and Implementing)
ISO 9001:2015 - Quality Management System
113 6.600.000 7.260.000 9.240.000 3 Hari 20-22 14-16
(Auditor)
ISO 9001:2015 - Quality Management System
114 9.900.000 13.200.000 14.300.000 5 Hari 20-24 12-16
(Lead Auditor)
ISO 45001:2018 - OHS Management System
115 2.750.000 4.730.000 3.630.000 1 Hari 16 26 16
(Preparing for Migration from OHSAS 18001
ISO 45001:2018 - OHS Management System
116 6.600.000 8.580.000 9.240.000 3 Hari 16-18 26-28 16-18
(Auditor)

V CONSTRUCTION CATEGORY
117 TIC Muda 12.100.000 16.060.000 17.380.000 6 Hari 22-29 07-14
118 TIC Madya 13.200.000 17.160.000 18.480.000 6 Hari 22-29 07-14
119 TIC Utama 14.300.000 18.260.000 19.580.000 6 Hari 22-29 07-14
120 Juru Ukur 12.100.000 16.060.000 17.380.000 6 Hari 22-29 07-14
121 Quantitiy Surveyor Level Muda 12.100.000 16.060.000 17.380.000 6 Hari 22-29 07-14
122 Quantitiy Surveyor Level Madya 13.200.000 17.160.000 18.480.000 6 Hari 22-29 07-14
123 Quantitiy Surveyor Level Utama 14.300.000 18.260.000 19.580.000 6 Hari 22-29 07-14

VI HUMAN RESOUCES CATEGORY


A KEMENAKER CERTIFICATION SUB CATEGORY
124 Kader Norma Ketenagakerjaan Level Muda 8.800.000 12.100.000 13.200.000 5 Hari 13-17 21-28
125 Kader Norma Ketenagakerjaan Level Madya 7.700.000 10.340.000 11.220.000 4 Hari 13-15 21-27
126 Kader Norma Ketenagakerjaan Level Utama 8.800.000 10.780.000 11.440.000 3 Hari 13-15 21-23

B BNSP CERTIFICATION SUB CATEGORY


127 Training of Trainer (TOT) 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
128 Training Need Analysis 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
129 Staff Administrasi Sumber Daya Manusia 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
130 Staff Kompensasi dan Benefit 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
131 Staff Manajemen Talenta 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
132 Staff Penggajian 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
133 Staff Perencanaan Sumber Daya Manusia 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
134 Staff Rekrutmen dan Seleksi 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
135 Staff Remunerasi 5.500.000 7.480.000 8.140.000 3 Hari 10-12 02-04
136 Supervisor Manajemen Kinerja dan Karir 6.600.000 9.240.000 10.120.000 4 Hari 10-13 02-05
137 Supervisor Pelatihan
Manajemen danTalenta
Pengembangan 6.600.000 9.240.000 10.120.000 4 Hari 10-13 02-05
138 Sumber Daya Manusia 6.600.000 9.240.000 10.120.000 4 Hari 10-13 02-05
139 Supervisor Pengadaan 6.600.000 9.240.000 10.120.000 4 Hari 10-13 02-05
140 Human Resouces Manager 8.800.000 12.100.000 13.200.000 5 Hari 10-14 02-06
141 Manajer Human Capital 8.800.000 12.100.000 13.200.000 5 Hari 10-14 02-06
142 Manajer Administrasi dan Personalia 8.800.000 12.100.000 13.200.000 5 Hari 10-14 02-06
Manajer Pengembangan Sumber Daya
143 8.800.000 12.100.000 13.200.000 5 Hari 10-14 02-06
Manusia

Note
*) Hanya Untuk In-House Training
1 Tempat Pelaksanaan Training Course di Graha BKI Lantai 9, Jl. Yos Sudarso No. 38 Tanjung Priok Jakarta
2 Sebelum pelaksanaan training course, tanggal dan harga pada jadwal training ini dapat berubah sewaktu-waktu tanpa pemberitahuan sebelumnya
3 Biaya sudah termasuk PPN 10%
4 Biaya sudah termasuk training module (PDF Format), training kit, lunch, 2 x cofee break dan certificate
5 Untuk paket basic adalah non residential, professional adalah twin share residential dan business adalah single occupancy residential di Hotel Bintang****
6 Untuk paket professional dan business biaya termasuk antar jemput hotel ke dan dari Graha BKI termasuk breakfast dan dinner
7 Training course akan dilaksanakan jika kuota minimum peserta terpenuhi
8 Informasi lebih lanjut dapat menghubungi BKI Academy PT. Biro Klasifikasi Indonesia (Persero) Telp. 021 4393 7409, email : info@bki.academy