1. Test Locations(Total 8 Locations)
2
2.1 Test Equipment
3
3) Connector
4
2. Test Methods
1. Pilling at 8 test points with a driving depth of 1.2m. Start test after 72 hours of the pilling.
2. Install the gauge and sensor before testing as shown in Figure 1.
( See Figure 2 as a test example for reference)
Figure 1 Figure 2
3. Use a wire rope to connect the gauge and the pullout tester, connect the pullout tester to
the connector, and then connect the connector to the excavator.
5
4. After the installation completed, lift the connecter to make the wire rope to a tight state ,
adjust the tension to 1.6KN for 5 minutes, record the displacement X and Y of the 几-
shaped pile within five minutes, and take the average value.
5. Adjust the tester until the tension reaches 3.2KN and keep that for 5 minutes, record the
displacement X and Y of the 几-shaped pile.
6. Increase the pull force of 1.6KN every 5 minutes as above test process, take 25 minutes to
finish 5 groups test.
(Remarks: According to the strength calculation, the maximum base reaction force is
5.23KN. Take 1.5 times as the safety factor, the maximum load of the test design is 8KN.
Test five groups of tensile forces, the test value is gradually increased to 1.6N, 3.2N, 4.8N,
6.4N, 8KN)
i. Under the action of a certain load, the top of the pile top is up to 5 times higher than
ii. According to the top of pile , the total amount of the top of the pile exceeds 50mm.
iii. When loading to the maximum pull-up load required by the design but not satisfying
6
the above two requirements, the loading can be continued to the second level, and
the loading can be terminated when the second level is still not satisfied.
7
3. Finishing of Test Results
The resulats of the single pile vertical pull-up static load test,in order to faciliate the
application and statistics,shall be organized into a tabular form,and draw the relevant test
anomalies that occur during pile formation and testing.The main results include the
following aspects:
2) The load-deformation(U~δ)curve of the single pile vertical uplift static load test;
5 minutes Move Up
Test strength
Corresponding Grand total(mm)
(KN) X(mm) Y(mm)
level(mm)
0
1.6
3.2
4.8
6.4
8.0
8
U-δ Curve
2
1.8
1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9
U-δ曲线
9
4. Results Analysis
Test Pile Type Maximum pull-up Cumulative displacement Depth(mm)
Locations load(kN) (mm)
Location 1 几-Shape Pile 1200
Location 2 几-Shape Pile 1200
Location 3 几-Shape Pile 1200
Location 4 几-Shape Pile 1200
Location 5 几-Shape Pile 1200
Location 6 几-Shape Pile 1200
Location 7 几-Shape Pile 1200
Location 8 几-Shape Pile 1200
10