CAUTION
1) This manual applies only to CSC-101.
2) Please read the manual carefully and with the specification of the
installation, adjustment, testing, operation and maintenance.
3) To prevent damage to equipment, don‘t plug-hot-plug any unit of the
equipment, touching the chips and components in printed circuit board.
4) Please use the testing equipment and devices which comply with the
relevant standards for test and detection.
5) If any abnormity occurred in the equipment or unusual maintenance needed,
promptly contact with the agents or our service hotline.
6) The operation password is:8888.
WARNING
1)During operation of electrical equipment ,certain parts of this equipment are
under high voltage. Severe personal injury or significant equipment damage could
result from improper behavior.
2)Only qualified personnel should work on this equipment or in vicinity of the
equipment. These persons must be familiar with warning & service procedure
described in this manual, as well as with safety regulations.
3)Prerequisites to proper & safety operation of the equipment are proper
storage, setup, installation, operation & maintenance of the equipment.
4)In particularly cases, the general rules & safety regulations according to
relating standards(e.g. IEC, National standards or other International standards) for
work with high voltage equipment must be observed.
COPYRIGHT
All rights reserved.
Registered trademark
® are registered trademark of Beijing sifang automation co., ltd.
CONTENTS
1. Introduction ................................................................................................................. 1
1.1 Application .................................................................................................................. 1
1.2 Features ....................................................................................................................... 1
1.3 Functions ..................................................................................................................... 2
2. Design .......................................................................................................................... 6
2.1 Mechanical structure .................................................................................................. 6
2.2 Dimensions.................................................................................................................. 6
3. Technical data ............................................................................................................. 8
3.1 General data ................................................................................................................ 8
3.2 Function data............................................................................................................. 12
3.2.1 Pilot protection.......................................................................................................... 12
3.2.2 Distance relay ............................................................................................................ 12
3.2.3 Zero-sequence element............................................................................................ 13
3.2.4 Directional overcurrent relay ................................................................................... 13
3.2.5 Overvoltage relay ...................................................................................................... 13
3.2.6 Undervoltage relay.................................................................................................... 13
3.2.7 Auto-reclosure .......................................................................................................... 13
3.2.8 Time element ............................................................................................................. 13
4. Hardware functions .................................................................................................. 14
4.1 Hardware arrangements ........................................................................................... 14
4.2 Operations of complete units .................................................................................. 14
5. Protection functions ................................................................................................. 17
5.1 Whole structure of protection program ................................................................. 17
5.2 The protection basic elements ................................................................................ 17
5.3 Monitoring function .................................................................................................. 26
5.4 Other logic of protection .......................................................................................... 31
5.5 Pilot protection.......................................................................................................... 33
5.6 FIVE zones distance protection .............................................................................. 39
5.7 Zero-sequencs current protection .......................................................................... 44
5.8 Direction over current protection ........................................................................... 48
5.9 Over voltage protection ........................................................................................... 50
5.10 Under voltage protection ......................................................................................... 50
5.11 Breaker failure protection ........................................................................................ 51
5.12 Autoreclose ............................................................................................................... 53
5.13 Switch-on-to-fault protection (SOTF) ..................................................................... 58
6. Installation and commissioning .............................................................................. 61
6.1 Unpacking & repacking ............................................................................................ 61
6.2 Mounting .................................................................................................................... 61
6.3 Check before power on ............................................................................................ 61
7. Operation ................................................................................................................... 62
7.1 Safety precautions .................................................................................................... 62
7.2 Dialog with the equipment ....................................................................................... 62
7.3 Setting the functional parameters........................................................................... 68
7.4 Annunciations ........................................................................................................... 82
7.5 Testing and commissioning .................................................................................... 86
7.6 Commissioning using primary tests ...................................................................... 95
7.7 Putting the equipment into operation..................................................................... 97
8. Maintenance .............................................................................................................. 99
8.1 Routine checks ......................................................................................................... 99
8.2 Replacing the back-up battery ................................................................................ 99
8.3 Fault tracing............................................................................................................... 99
8.4 Repairs ....................................................................................................................... 99
8.5 The notices during operation .................................................................................. 99
8.6 Manipulation after replacing software or CPU..................................................... 100
8.7 Manipulation after replacing software or MASTER module ............................... 100
8.8 Manipulation after replacing input or output module ......................................... 100
8.9 Manipulation after replacing AC module .............................................................. 100
8.10 Several illuminations .............................................................................................. 100
9. Storage ..................................................................................................................... 102
10. Ordering ................................................................................................................... 103
10.1 Selection and ordering data................................................................................... 103
10.2 Ordering data........................................................................................................... 103
11. Appendix .................................................................................................................. 104
A Terminal diagram ............................................................................................................... 104
B Connection to system diagram ..................................................................................... 105
C Introduction of analog .................................................................................................... 106
D Communication Protocol Tables ................................................................................... 108
CSC-101 EHV Transmission Line Protection Equipment Manual
1. Introduction
1.1 Application
CSC-101 EHV line protection applies to 220kV and higher voltage transmission
lines. The product consists of primary protection namely pilot protection using
distance relay, 5 zones distance protection, 4 stages zero sequence current
protection, overcurrent protection, overvoltage protection, undervoltage protection,
Circuit breaker failure protection and auto-reclosure etc.
1.2 Features
The equipment have characteristics as follows:
• Double A/D sampling in analog circuit Acquisition, performing real time self-testing
for each other.
• New checking methods used for the relay detection can detect coil performance in
energized circuit of the relay, so detection and abnormal alarm for the relay have
-1-
CSC-101 EHV Transmission Line Protection Equipment Manual
been achieved.
• Fault wave recorder with great capacity, memory up to 4M bytes, can record full
process of any fault, and can save no less than 24 records. Optional data format or
wave format is provided when the records need to be printed, and also fault wave
recorder can be exported to serial port or Ethernet port by COMTRADE format.
• Event recorder can store operating reports, alarm reports, start reports and
general operation records, every kind of record isn‘t less than 2000 events, and is
memorized when power is off.
• The product can record protection operating process, logic flow and varied
calculation values that can be analyzed in whole process by analyzing software
CSPC developed by us. PC which installed this fault analyzing software, can
manipulate the protection system via series ports RS-232 on faceplate in front of
the equipment, and get various information such as recorded fault data and wave to
analyze.
• 2-channel high speed reliable electric Ethernet ports (optional optical fiber
Ethernet ports), 2-channel LonWorks ports, RS-485 port and series printing port are
provided; the user can select any of these according to the requirements. The
protocol supports IEC60870-5-103, IEC61850 or CSC-2000 of Sifang Company,
easy to interface with substation automatization system and protection
management information system.
• Liquid crystal display with backlight: Application to display various messages such
as current, voltage, power, frequency, strip state, setting zones etc. The menu is
easy to operate, and four shortcut keys are set to finish operation with one key for
local operator.
1.3 Functions
Pilot distance protection
Pilot distance protection is the primary protection for EHV line. It is applicable to
three kinds of channel pattern: blocking mode, permissive under reach mode and
permissive over reach mode. It consists of pilot directional distance element, pilot
directional zero- and negative-sequence element. Pilot directional distance element
is composed of directional phase to earth distance element and phase-phase
-2-
CSC-101 EHV Transmission Line Protection Equipment Manual
distance element.
Distance protection
Both phase to phase distance protection and phase to earth distance protection
are provided in CSC-101. This fast short-circuit protection protects the transmission
line and is a backup protection for the power system. This protection has four
settable zones; in addition, every zone can be switched over via binary settings.
In order to avoiding the maloperation of the distance protection, it is blocked when
VT is loss. The distance characteristic is polygonal.
● Power swing blocking
In 150ms after the sudden-change current startup element operates, or when
power swing startup element or Zero-sequencs current startup element operates,
the executing program will directly go into the logic part of power swing blocking.
For asymmetric faults detection element, Zero- and negative-sequence current can
distinguish fault from swing. The criterion is described as below.
|I0|>m1|I1| or I2>m2|I1|
For three-phase fault detection element, the method distinguishing fault from power
swing:
T _ factor
T T_INV
Id
( )N 1
3I 0 _ INV
Id - fault current.
T_factor - Time factor of inverse time Zero-sequences current.
N - Index of inverse time Zero-sequences current.
3I0_INV - current setting of inverse time zero current.
T_ INV - delay time setting of inverse time zero current which can meet the
-3-
CSC-101 EHV Transmission Line Protection Equipment Manual
requirement that inverse time zero current co-operates with different protection.
Inverse curves can be obtained according to the following setting:
N=0.02 and T_factor=0.14 ─ Standard inverse (IEC Standard);
N=1 and T_factor=13.5 ─ Very inverse;
N=2 and T_factor=80 ─ Extremity inverse.
Direction overcurrent protection
This protection function is a backup protection for the transmission line and the
power system The overcurrent protection Function can be applied to via binary
settings. The overcurrent direction can be enabled to via binary settings.
Toc _ factor
Toc Toc_INV
Id
( ) 1
Noc
Ioc _ INV
Id - fault current.
Toc_factor - Time factor of inverse time over-current.
N oc- Index of inverse time over -current.
Ioc_INV - current setting of inverse time over current.
Toc_ INV - delay time setting of inverse time over current which can meet the
requirement that inverse time over current co-operates with different protection.
Inverse curves can be obtained according to the following setting:
N=0.02 and T_factor=0.14 ─ Standard inverse (IEC Standard);
N=1 and T_factor=13.5 ─ Very inverse;
N=2 and T_factor=80 ─ Extremity inverse.
-4-
CSC-101 EHV Transmission Line Protection Equipment Manual
-5-
CSC-101 EHV Transmission Line Protection Equipment Manual
2. Design
2.1 Mechanical structure
The enclosure for equipment is 19 inches in width and 4U in height
according to IEC 60297-3.
● The modules can be combined through the bus on the rear board. Both
the equipment and the other system can be combined through the rear interfaces.
2.2 Dimensions
Dimension drawings for CSC-101 are shown in Fig 2.
-6-
CSC-101 EHV Transmission Line Protection Equipment Manual
-7-
CSC-101 EHV Transmission Line Protection Equipment Manual
3. Technical data
3.1 General data
3.1.1 Analog input and output
Nominal Frequency 50 Hz
Current Inputs
Rated current IN 1 A or 5 A
Current Overload Capability per Current Input
-thermal (rms) 2IN-continuously;
10I N-10s;
40IN-1s;
Voltage Inputs
Rated Voltage uN 110/√3
Voltage Overload Capability in Voltage Path per Input
-thermal (rms) 1.2UN-continuously;
1.4UN-10s
3.1.2 Power supply
Voltage Supply
Rated auxiliary voltage 110V DC 220V DC
UDC
Permissible voltage 88V~121V 176V~242V
ranges
Binary outputs
Variant Trip contacts Quantity Alarm contacts Quantity
CSC-101 32 NO contacts 32NO contacts
Operator Interface
local Connection type RS-232 Ethernet RS-485
-8-
CSC-101 EHV Transmission Line Protection Equipment Manual
-9-
CSC-101 EHV Transmission Line Protection Equipment Manual
2 Rated parameters
2.1 Rated value of voltage 110V or 220V
2.2 Rated value of current 1A or 5A
2.3 Rated value of frequency 50Hz
3 Burden
3.1 rated burden • AC current DL/T 478-2001
circuit:≤ 1VA
• AC voltage circuit:
≤0.5A Specific
•DC power supply rating
circuit::≤50W defined by
4 Thermal property Manufacturer
4.1 Thermal of short and • AC current DL/T 478-2001 in IEC
long time circuit: 60255-6
2IN-continuously; :1988
10I N-10s;
40IN-1s;
• AC voltage
circuit:
1.2UN -
continuously;
1.4UN-10s
5 Electrical insulation
5.1 Insulation resistance 100MΩ IEC 60255-5 :
2000
(GB/T 14598.3
-2006,IDT)
5.2 Insulation resistance in 1.5MΩ DL/T 478-2001 No defined in
dry heat IEC60255-5
-10-
CSC-101 EHV Transmission Line Protection Equipment Manual
(GB/T
11287-2000
,IDT)
6.2 Shock 1 class IEC60255-21-2
6.3 Bump 1 class (GB/T
14537-1993
,IDT)
7 EMC
7.1 Burst disturbance 3 class: IEC 60255-22-1 Add
• common mode (GB/T 100kHz ,
2.5kV, 14598.13- harsh more
• differential mode 1998,IDT) IEC60255-2
1.0kV IEC 61000-4-12 2-1
7.2 ESD disturbance 4 class : contact IEC 60255-22-2 Harsh more
-8kV (GB/T 14598.14 3 class of
-1998,IDT) IEC
IEC 61000-4-2 60255-22-2
7.3 Radiated 3 class:10V/m IEC 62505-22-3
electromagnetic (GB/T 14598.9
disturbance -2002,IDT)
IEC 61000-4-3
7.4 Fast burst disturbance 4 class: IEC60255-22-4 Harsh more
•communication (GB/T14598.10 3 class of
port --2kV; -1996,IDT) IEC
• others IEC 61000-4-4 60255-22-4
ports--4kV
7.5 Surge disturbance 4 class : IEC 60255-22-5, Harsh more
•communication IEC 61000-4-5 3
port Class of IEC
--2kV; 60255-22 -5
• others ports --4kV
7.6 Conducted disturbance 3 class:10V IEC 60255-22-6
of RF IEC 61000-4-6
7.7 Power frequency 5 class :100A/m IEC 61000-4-8 No defined in
magnetic field IEC60255-2
disturbance 2
7.8 Pulse frequency 5 class:1000A/m IEC 61000-4-9 No defined in
magnetic field IEC60255-2
disturbance 2
-11-
CSC-101 EHV Transmission Line Protection Equipment Manual
-12-
CSC-101 EHV Transmission Line Protection Equipment Manual
c) Operating time of zone 1 of distance relay:≤30ms when fault occurs within 0.7
times setting value
d) Measuring tolerance of fault locator (not including errors caused by factors
outside product): ≤+3% when fault current is greater than 0.01 In at metal fault,
error will become bigger when fault occurs with greater path fault resistance.
3.2.3 Zero-sequence element
a) Setting range:0.1In ~20In.
b) Forward direction operating stage of zero-sequence power directional element:
18°≤ arg(3I0/3U0) ≤180°
3.2.4 Directional overcurrent relay
a) Setting range:0.1In ~20In.
b) Measuring tolerance:≤±3%。
c) Forward direction operating stage of overcurrent power directional element:
-90°≤ arg(U/I) ≤30°
3.2.7 Auto-reclosure
a) Angle error of synchronization check:≤±3º
b) Voltage error of synchronization check:0.7 Un±3%;
c) Measuring tolerance of low voltage detector:0.3 Un±3%。
3.2.8 Time element
a) Setting range:0s~10s,error grade: 0.01s
b) Measuring tolerance of Setting :≤±1.5% or 20ms
-13-
CSC-101 EHV Transmission Line Protection Equipment Manual
4. Hardware functions
4.1 Hardware arrangements
1 2 3 4 5 7 8 9 10 11
AC CPU CPU MASTER I O O O O POWER
relay
relay
manage
input1
output1
output2
output3
output4
Alternating
Current
45 20 20 40 20 40 20 20 20 35
110/ 3 V.
-14-
CSC-101 EHV Transmission Line Protection Equipment Manual
-15-
CSC-101 EHV Transmission Line Protection Equipment Manual
The power supply of 24V energizing input module can be input directly,
another group input need to be connected, 220V or 110V power can be used.
The power supply module with DC inverters module wiring terminal at rear
panel is X11 as shown in Attached Fig.6. Its input power is DC 220V or 110V
(indication when ordered), and its outputs are five groups power supplies.
(1)+24V two groups provided: Power for inputs and outputs module
(2)±12V: Power for A/D
(3)+ 5V: Power for all CPU
-16-
CSC-101 EHV Transmission Line Protection Equipment Manual
5. Protection functions
5.1 Whole structure of protection program
Software of CPU protection includes main program, sampling interruption service
routine and fault dealt routine.
Main program is running under normal operation to perform hardware self-testing,
setting solidified and transmission reports upward etc. Sampling interruption service
program is active in a sampling interval time to implement data sampled, wave record
and fault detected by sudden-change current etc. Whenever the fault detector
elements operate, fault dealt program is executed to run all protection logic and judge
CT circuit open or not etc. If any abnormal element is detected, a relevant alarm
signal and report will be given.
For the general alarm signals (Alarm II), only the signal is sent out to clue the
operator to examine and repair. For the serious alarm signal threatening the
protection security and reliability (Alarm I), once the signal is sent out, the protection
output circuit is blocked.
When fault occurs in power system, fault dealt program does not return to the main
program until it has finished all relevant protection functions to reach to meet the
conditions of the whole reset.
5.2 The protection basic elements
Startup element mainly implements to detect fault, start the protection relay and
energize positive power supply for the output relay. Once startup element operates, it
does not reset until the all of action conditions entirely return.
Startup element includes current sudden-change startup, zero-sequence current
startup, over current startup, the loss of static stability startup, low-voltage startup
element in weak-source and autoreclose startup element. The fault dealt program is
picked up and the positive power supply for the output relay is energized when any
startup element operate.
5.2.1.1 Sudden-change current of phase-phase element — ΔIφφ
Sudden-change current phase-phase element is the main startup element that
can sensitively detect most of faults. Its criterion is as follows:
△ i> I_abrupt
or △ 3i0> I_abrupt
where △ i= || iK- iK-T|-| i K-T - iK-2T ||, means AB,BC or CA, K is the
current sampling timing,T=24 samples per cycle,(K-T)is the sampling
timing before one cycle from timing K,(K-2T)the sampling timing before
two cycles from timing K,
Δ3i0 is sudden-change zero-sequence current value,
I_abrupt is the setting value of sudden-change current.
The sudden-change current element operates when any phase-to-phase
sudden-change current △ i or zero-sequence sudden-change current △ 3i0
continuously exceed the setting I_abrupt.
-17-
CSC-101 EHV Transmission Line Protection Equipment Manual
Using integrated phase selector detect various fault types, phase selector can pick
out fault phase for select-phase tripping.
-18-
CSC-101 EHV Transmission Line Protection Equipment Manual
ABN BCN
0 0
+90 -90
CN,ABN BN,CAN
0 0
+150 CAN -150
-19-
CSC-101 EHV Transmission Line Protection Equipment Manual
-20-
CSC-101 EHV Transmission Line Protection Equipment Manual
Fig.5-2 Fig.5-3
Fig.5 Operating characteristics of polygonal distance protection
The values in the small rectangle operation area are shown in Tab.5-2.
Tab.5-2
Setting X Minimum { XDZ/2, 0.5(In=5A)or 2.5(In=1A)}
Setting R Minimum {Maximum{ minimum (among 8 times
the abover X and RDZ/4), 2 times the abover
X },RDZ}
Where XDZ is the reactance setting of relevant elements, RDZ is the resistance
setting of relevant elements.
-21-
CSC-101 EHV Transmission Line Protection Equipment Manual
directional elements whose operation areas are shown in Fig.5-4. The threshold of
forward directional element can be set while that of reverse directional element can
not, whose sensitivity is automatically higher than forward element, and threshold is
0.625 times that of the forward element.
. .
Area of forward directional element is 18°≤arg(3 I 0/3 U 0)≤180°
. .
Area of reverse directional element is -162°≤arg(3 I 0/3 U 0)≤0°
Фlm
forward
81° 81°
18°
3U0
reverse
-22-
CSC-101 EHV Transmission Line Protection Equipment Manual
Фlm
forward
81° 81°
18°
3U2
reverse
-23-
CSC-101 EHV Transmission Line Protection Equipment Manual
period and the machine angle . Curve 1 and curve 2 in Fig.5-6-(a) are the
trajectories of measuring resistance changing with time, where Rf is load
resistance component and Tz is swing period. Whether the trajectory of
measuring impedance is a line or a circular arc on R-X plane during power swing,
is decided by electromotive force of both terminals equivalent system, as shown
in Fig.5-6-(b).
Rm(t)
1 2 jX
Rf
t Zm
0
R
0
Tz
(a) (b)
Rf
Rk
O t
t1 t2 t3
Fig.5-7 The trajectory of pre- and post-fault measuring resistance changing with
time
b) When fault occurs on the protected line, resistance component of measuring
impedance maybe changes due to electric arc elongated, but analysis and
calculation show that changing rate of arc resistance is far less than that of
resistance corresponding to the possibly biggest swing period noted up to the
present. After short circuit, measuring resistance is resistance RK of short circuit,
whose value hardly changes or almost keeps invariability, as shown in Fig.5-7.
The rule of measuring impedance is also similar.
Contrasting Fig.5-6 with Fig.5-7, it can be seen that power system is determined
to be in the swing state if measuring resistance is always changing and exceeds a
threshold value in a period of time. Therefore, the least change of resistance is looked
-24-
CSC-101 EHV Transmission Line Protection Equipment Manual
over during power swing. It can be known from analyzing Fig.5-6 that the instance of
the least change of measuring resistance occurs in the following conditions.
(1)near =180°
(2)the digest swing period TZMAX.
And then, enlarge this part track of resistance change to be shown in Fig.11.
Rm
=180°
Rmin
t
/2
-25-
CSC-101 EHV Transmission Line Protection Equipment Manual
-26-
CSC-101 EHV Transmission Line Protection Equipment Manual
Relay startup
Binary of
“VT Fail”
NO DI“CB
OPEN”
≥1
OR1
≥1
VT_bus OR2
& &
Relay test AND3 AND5
Ia(b,c) >
0.04In
&
AND4
Ua(b,c) < 8V
To prevent the relay from wrong trip, interruptions in the secondary circuits of
current transformers is detected and reported by the device. When the zero-sequence
current is always larger than the setting value of I04 for 12s, ―CT Fail‖ will be reported
and each zone of zero-sequence current protection will be blocked.
-27-
CSC-101 EHV Transmission Line Protection Equipment Manual
By comparing value and phasor of calculational 3I0 ( I A IB IC ) with that of 3I0
external connected, whether the polarity of external 3I0 is connected in reverse or not
can be differentiated, if it is in reverse, ―3I0 Reverse‖ will be reported.
If the third harmonic voltage exceeds 4V, ―Harmonic Alarm‖ will be reported with
10s delay time, but the protection is not blocked.
If there is input signal of auxiliary contact of CB, and corresponding phase has
current, which is confirmed with 2s delay time, ―CB OpenA(B or C) Err ‖ is reported.
The system supervises load flow on real time. If all three phase current are always
greater than the setting of ―I_OverLoad‖ for the setting of ―T_OverLoad‖, ―Overload‖ is
reported.
The system supervises load flow on real time. If negative current is greater than the
setting of ―3I2_BROKEN COND‖ for ―T_BROKEN COND‖, ―BROKEN CONDUCTOR‖
is reported. The following is BROKEN CONDUCTOR Logic figure.
-28-
CSC-101 EHV Transmission Line Protection Equipment Manual
DI “CB
OPEN A-
PHASE”
DI “CB
=1
OPEN B- OR1
PHASE”
DI “CB
OPEN B-
PHASE”
3I2>3I2_BR &
AND1
OKEN COND
Broken
BROKEN &
AND2 T_ BROKEN COND Conductor
COND_Alarm
Alarm
The polar disaccord protection checks the state of the breaker. If the state of the
breaker is inconsistent, polar disaccord protection will permanent trip. The following
figure shows the logic of polar disaccord protection.
POL DIS
ENABLE
CB OPEN A
CB OPEN C
CB OPEN A
CB OPEN B &
AND-1
CB OPEN C
-29-
CSC-101 EHV Transmission Line Protection Equipment Manual
a) In function of pilot protection such as < Blocking mode>, < POR mode > and < PUR
mode >, if any two kinds of these three modes are put into operation at the same time,
―Pilot FUNC Alarm‖ is alarmed.
b) In function of automatic recolsure of equipment, if any two kinds of modes are put
into operation at the same time among < AR_No check >, < AR_check low U > and <
AR_check Syn >, ―AR FUNC ALARM‖ is alarmed. In function of automatic recolsure
of equipment, if any two kinds of modes are put into operation at the same time
among < AR_1p mode >, < AR_3p mode >, <AR_exit mode> and < AR_1p_3p
mode >, ―AR FUNC ALARM‖ is alarmed.
c) Choose VT mode, If two kinds of modes are put into operation at the same time <
VT_line >and < VT_bus>, ―VT CHOICE Alarm‖ is alarmed. If for < VT_line >and <
VT_bus> is not put into operation, relay is put into operation for < VT_bus>.
d) In function of distance protection, Z4 put into operation , if two kinds of modes are
put into operation at the same time < Reverse_Z4 >and < Forward_Z4 >, ―Z4 Chioce
Alarm‖ is alarmed.
e) In function of distance protection, Z5 put into operation , if two kinds of modes are
put into operation at the same time < Reverse_Z5>and < Forward_Z5 >, ―Z5 Chioce
Alarm‖ is alarmed.
f) In function of distance protection, Z5 put into operation , at the same time if< Z1
EXTN_FUNC >are put into operation, ―Z1 Extn Err‖ is alarmed.
a) CPU module check. CPU module performs self-testing to its memories, analog
channels and program during power on, parts of the above are checked by itself in
real time during the system running. If any of them is confirmed to be incorrect,
alarm will be given, and the protection will be blocked.
b) The sampled data can be checked with each other in real time due to the
redundancy of double A/D channel for one analog quality. If the difference between
two channels exceeds the setting limit, one of the double channels is regarded as
fault one.
c) Each I/O plug-in module performs self-testing during power-up and real-time
self-tests. Self-testing checks input channel, output channel, memories and code
areas etc. Self-testing of input channel is performed by bit changing simulation.
Self-testing of output channel includes coil tests and outer circuit tests. The tests
are very thorough with wide range, if any failure is confirmed, alarm is given.
d) Real-time self-testing of communication ports. CPU module and MASTER
module perform real-time self-tests of communication among all kinds of function
modules. When interrupt communication is detected, alarm is given.
e) MASTER plug-in module performs self-testing at power-up and real-time
self-testing that check memories, program areas and relevant communication
with the outside. If any abnormal event is detected, alarm will be given. The
setting and strap messages stored in this module are checked with each other.
f) Real-time supervision for DC power supply.
g) CRC checks for the setting etc.
-30-
CSC-101 EHV Transmission Line Protection Equipment Manual
When all the following conditions have been meet for 5s, the whole relay resets
from fault dealt program.
a) Six kinds of impedance are outside the 5 zone of impedance.
b) Zero-sequencs current is less than the setting of Zero-sequencs current startup
value.
c) All three-phase currents are less than the setting ―I_PS‖ of loss of static
stability.
5.4 Other logic of protection
After tripping commands sent out, the current of tripping phase is in the supervision.
When tripping phase has not current, the protection system considers that CB has
been opened. If tripping phase always has current, the system output three-phase trip
signal with 150ms delay. That is to say, if tripping phase always has current during
150ms after single-phase trip signal output, which indicates CB not tripping, then,
three-phase trip signal is output. After this, if any phase current lasts 150ms,
three-phase final tripping command is issued. Later, if CB still in close state lasts 5s,
three-phase final tripping failure alarm will be sent out, and the whole relay will reset.
Trip command will be withdrawal as soon as fault is cleared. To ensure that CB trips
reliably, withdrawal command is impossible to be considered within 40ms after trip
command sent out.
When there is no current flowing for the setting of ―Relay reset‖ after the output of
trip command, the program routine jumps to the whole relay reset.
After tripping command output, the sending signal command (for permissive mode)
does not return until tripping command has been withdrawal for 120ms in order to
ensure the pilot protection of both terminals to operate reliably.
-31-
CSC-101 EHV Transmission Line Protection Equipment Manual
If one side of the line is feeder, when forward fault for the relay at feeder side occurs,
the fault characters are no longer same as that of two side source system. To perform
selective tripping function for a line with feeder, feeder tripping of pilot protection must
be put into operation.
If feeder function is enabled, CSC-101 can fit the following conditions.
When internal faults occur, the local relay sends out permissive signal (permissive
mode) in order that the relay at power source side trips quickly. The relay at
weak-source side can correctly perform selective trip.
Phase selector of the relay at weak-source end can meet the phase-selection
requirements for line faults, and the relay can correctly perform selective trip. Even if
faults occur on load terminal line, the relay can either send out tripping command
quickly and exactly or select fault phase correctly.
When sudden-change current startup element does not pick up, if feeder function is
enabled, relay starts up under the following conditions.
a) Voltage is lower than 30V.
b) Receiving signal.
After pickup, the feeder relay will send signal (for permissive mode) quickly and
extend the signal 120ms to ensure the relay at power source side to trip quickly.
-32-
CSC-101 EHV Transmission Line Protection Equipment Manual
At feeder side, if the relay have picked up and the following conditions are satisfied,
the relay of permissive mode sends permissive signal. If the setting of the relay at
feeder is enabled, the relay can trip after confirming permissive signal.
a) At least one phase voltage or phase-phase voltage is less than 30V.
b) Both the forward and reverse directional elements do not operate.
c) Pickup time is less than 200ms.
d) Not receiving blocking signal for 25ms or receiving permissive signal for 5ms.
Relay will give the event report of ―weak send signal‖ for permissive mode,
Directional elements of pilot protection stop signal with 40ms delay time and
confirms to trip when the directional elements change from reverse direction to
forward direction to prevent wrong tripping caused by zero- or negative- sequence
power reversing flow during external faults cleared.
5.5.1Blocking mode
The reverse directional element controlled sending signal for blocking mode.
Every side device is only to receive the command signal from the remote.
Fig.5-9 is the logic diagram for the protection with blocking mode.
a) Internal fault
<Startup element>operates, relay trip for meeting following condition.
1)、Instantaneous trip if Zone 1 Operation
2)、Zone 2 + No blocking Signal from Remote end for 25ms.
b) External Fault
Operation of Zone 4 sends blocking signal to remote end, although the remote
relay detects forward direction, it receives blocking signal, therefore, both end does
not trip breaker.
c) Power flow reversing for external fault
The method to resolve this problem for the relay is that the relay stop
sending blocking signal with 40ms delay time when the directional element
operates from the reverse to the forward. Both sides of Relay trip that relays
haven‘t receiving blocking signal after confirming with 25ms.
-33-
CSC-101 EHV Transmission Line Protection Equipment Manual
Relay
startup
&
AND-1
CARR &
Received Trip single
& AND-6
AND-3
Delay time
25ms
Single
fault
& Trip three
Multiphase
AND-7 phase
fault
Three phase & Permenent
fault AND-8 trip
CSC-101 pilot distance protection logic for overreach permissive mode is shown in
Fig.5-10-a. CSC-101 pilot zero sequence current protection logic is shown in
Fig.5-10-b.
When internal fault occurs, the startup elements and zone 2 can operate,
permissive signal is sent out to the remote to permit the remote trip. If it is external
fault that occurs on line, the forward directional element of one end of the line
operates and does not receive permissive signal while that of another end of the line
does not operate and receive permissive signal, therefore, both ends can‘t trip.
a) Internal fault
<Startup element>operates, relay trip for meeting following condition.
1)、Instantaneous trip if Zone 1 Operation
2)、Zone 2 + permission Signal from Remote end for 5ms.
Zone 2 operates that permissive signal is sent out to the remote.
b) External Fault
Because the directional element near fault detects reverse direction, it does not
-34-
CSC-101 EHV Transmission Line Protection Equipment Manual
send permissive signal to the remote. Although the remote relay can send signal, it
cannot receive the remote permissive signal, therefore, both of two sides do not trip.
c) Power flow reversing for external fault
The method to resolve this problem for the relay is that the relay sends signal with
40ms delay time when the directional element operates from the reverse to the
forward to avoid the period in which both sides are forward direction, and then both
sides trip after sending signal is confirmed with 15ms delay when internal fault occurs
again.
d) Protection schemes for feeder
The binary setting ―Feeder_FUNC‖ is enabled.
(1)For feeder end, sudden-change current startup element cannot operates, the
logic of the low voltage is startup:
If the relay at feeder end receives the remote permissive signal and <low
voltage element> operates, relay startup.
( 2 ) For feeder end, sudden-change current startup element operates, the
operating logic of the relay is as below.
Within 200ms after protection pickup, if <low voltage element> operates, both the
forward and reverse directional element at feeder end do not operate, and the
permissive signal has been received for 5ms, 《sending signal》 lasted for 120ms to
ensure the relay at power source end trips quickly. feeder end can also trip.
e) The protection is not picked up, receives the remote signal < CARR
RECIEVED > and there are < CB OPEN A(B,C)-PHASE >, 《send signal》 can be
done for 200ms to ensure the remote pilot protection operates reliably.
-35-
CSC-101 EHV Transmission Line Protection Equipment Manual
Relay
startup
&
AND-1
Zone 2
operation
&
Delay time AND-5
5ms &
& AND-2
CARR AND-3
Received & Trip single
AND-6
Single fault
& Trip three
Multiphase AND-7 phase
fault
Three & Permenent
phase fault AND-8 trip
& |0 120|
AND-9
Low voltage
CB OPEN A- ≥
PHASE OR-1
&
CB OPEN B- & AND- |0 200|
AND- 11
PHASE 10
CB OPEN C-
PHASE
Fig.5-10 -aCSC-101 pilot distance protection for overreach permission mode logic
When internal fault occurs, the startup elements and stage 1 of zero sequence
current can operate, permissive signal is sent out to the remote to permit the remote
trip. If it is external fault that occurs on line, the forward directional element of one end
of the line operates and does not receive permissive signal while that of another end
of the line does not operate and receive permissive signal, therefore, both ends can‘t
trip.
a) Internal fault
<Startup element>operates, relay trip for meeting following condition.
1)、send signal if stage 1 of zero current Operation
2)、Stage 1 of zero current Operation + permission Signal from Remote end for the
setting of ―T01‖.
b) External Fault
Because the directional element near fault detects reverse direction, it does not
send permissive signal to the remote. Although the remote relay can send signal, it
-36-
CSC-101 EHV Transmission Line Protection Equipment Manual
cannot receive the remote permissive signal, therefore, both of two sides do not trip.
Relay
startup
&
AND-1
Relay reset
& CARR (DEF)
Stage 1 AND-3 Send
operation
POR Enabled ≥1
OR-1 & |0 Permenent
PUR Enabled AND-4 T01| trip
CARR (DEF) &
AND-2
Received
Fig.5-10-b CSC-101 pilot zero sequence current protection logic
CSC-101 pilot protection logic for under reach permissive mode is shown in
Fig.5-11.
When internal fault occurs, the startup elements and zone 1 can operate,
permissive signal is sent out to the remote to permit the remote trip. If it is external
fault that occurs on line, the forward directional element of one end of the line
operates and does not receive permissive signal while that of another end of the line
does not operate and receive permissive signal, therefore, both ends can‘t trip.
a) Internal fault
<Startup element>operates, relay trip for meeting following condition.
1)、Instantaneous trip if Zone 1 Operation
2)、Zone 2 + permission Signal from Remote end for 5ms.
Zone 1 operates that permissive signal is sent out to the remote.
b) External Fault
Because the directional element near fault detects reverse direction, it does not
send permissive signal to the remote. Although the remote relay can send signal, it
cannot receive the remote permissive signal, therefore, both of two sides do not trip.
c) Power flow reversing for external fault
The method to resolve this problem for the relay is that the relay sends signal with
40ms delay time when the directional element operates from the reverse to the
forward to avoid the period in which both sides are forward direction, and then both
sides trip after sending signal is confirmed with 15ms delay when internal fault occurs
again.
d) Protection schemes for feeder
The binary setting ―Feeder_FUNC‖ is enabled.
(1)For feeder end, sudden-change current startup element cannot operates, the
logic of the low voltage is startup:
If the relay at feeder end receives the remote permissive signal and <low
-37-
CSC-101 EHV Transmission Line Protection Equipment Manual
Single fault
& Trip three
Multiphase AND-7 phase
fault
Three & Permenent
phase fault AND-8 trip
& |0 120|
AND-9
Low voltage
CB OPEN A- ≥
PHASE OR-1
&
CB OPEN B- & AND- |0 200|
AND- 11
PHASE 10
CB OPEN C-
PHASE
Fig.5-11 CSC-101 pilot protection for under reach permission mode logic
The pilot protection has input of ―B B/CBF OPTD‖ or CBF operation, it will give output
―Direct trip send‖ for 200ms. If it has input of ―Direct trip RECV‖, it will give output
-38-
CSC-101 EHV Transmission Line Protection Equipment Manual
BB/CBF OPTD
≥ Direct trip
OR-1 send
CBF OPTD
-39-
CSC-101 EHV Transmission Line Protection Equipment Manual
In the logic of after one phase trip, if the following conditions are satisfied, zone 1
of distance relay will trip:
(1)Sudden-change current element ΔI2 (it is change that phase-phase current of
operation two phases)based on operation phases starts.
(2)ΔI2 directional element detects forward fault.
(3)Any of impedance of operation phase-to-earth or operation phase-to-phase is
located within the protected range of zone 1 of distance relay.
The distance relay exits after loss of measure voltage, and at the same time, the
measure voltage of VT is monitored continually. Once the voltage comes to the
normal, the distance relay will be automatically put into operation again. After loss
of measure voltage, phase over current and zero-sequence current protection
can be used. Their setting can be set independently, but they use a common time
delay setting.
Ia(b,c)>Ioc_
T_VT fail
VT Fail
“OC_VT fail”
3I0>3I0_VT ≥
T_VT fail OR-1
Fail Permenent
&
AND-1 trip
VT fail
≥
OR-2
STUB PROT
ENABLE
Relay give Fault location after relay trip. Fault location is calculated according to
fault phase. If relay select three phase fault or select phase failure, relay will calculate
AB phase impedance.
For the double line, relay need consider mutual inductance, so relay fetches in the
zero sequence current of the other line. It is ―IN(mutual)‖ of AC module of
equipment.
For single phase fault, the following is formula that impedance calculates.
-40-
CSC-101 EHV Transmission Line Protection Equipment Manual
U A ( B ,C )
Z=
I A( B ,C ) ( K R jK X ) * 3I 0 jK m * IN
For single line : Km=0;
For double line : Km=X0m/3X1, it only consider reactance. X0m is reactance of
mutual inductance, 3X1 is reactance of this line.
Tab. 5-4
Item
binary setting
Trip mode trip control
―Z_PS blocking‖
Zone
Blocked / the setting
Zone 1 Select phase trip
unblocked of― Z1_FUNC‖
Blocked / the setting
Zone 2 Trip_no AR
unblocked of― Z2_FUNC‖
Blocked / the setting
Zone 3 Trip_no AR
unblocked of― Z3_FUNC‖
Blocked / the setting
Zone 4 Trip_no AR
unblocked of― Z4_FUNC‖
Blocked / the setting
Zone 5 Trip_no AR
unblocked of― Z5_FUNC‖
Blocked / the setting of―Z1
Zone 1 EXTN. Select phase trip
unblocked EXTN_FUNC‖
Over current after loss the setting
Trip_no AR
of measure voltage of― OC_VT fail‖
-41-
CSC-101 EHV Transmission Line Protection Equipment Manual
swing blocking is enabled. Relay don‘t startup reclose after Zone 2 trip with
delay time.
c) Fault occurs in the range of zone 3:
Whether zone 3 is blocked during power swing or not is controlled by the
setting ―Z3_PS blocking‖. If the setting ―Z3_PS blocking‖ is set to ―off‖, power
swing blocking is disabled. If the setting ―Z3_PS blocking‖ is set to ―on‖, power
swing blocking is enabled. Relay don‘t startup reclose after Zone 3 trip with
delay time.
d) Fault occurs in the range of zone 4:
Whether zone 4 is blocked during power swing or not is controlled by the
setting ―Z4_PS blocking‖. If the setting ―Z4_PS blocking‖ is set to ―off‖, power
swing blocking is disabled. If the setting ―Z4_PS blocking‖ is set to ―on‖, power
swing blocking is enabled. Relay don‘t startup reclose after Zone 4 trip with
delay time. Zone 4 can be select ―Reverse_Z4‖ or ―Forward_Z4‖,
―Reverse_Z4‖ mainly apply to blocking mode.
e) Fault occurs in the range of zone 5:
Whether zone 5 is blocked during power swing or not is controlled by the
setting ―Z5_PS blocking‖. If the setting ―Z5_PS blocking‖ is set to ―off‖, power
swing blocking is disabled. If the setting ―Z5_PS blocking‖ is set to ―on‖, power
swing blocking is enabled. Relay don‘t startup reclose after Zone 5 trip with
delay time. Zone 5 can be select ―Reverse_Z5‖ or ―Forward_Z5‖.
f) Fault occurs in the range of zone 1 extern:
zone 1 extern function is used that DI of ―carr fail(DIST)‖ is high and the
setting ―Z1 EXTN_FUNC‖ is set to ―on‖. Whether zone 1 EXTN is blocked
during power swing or not is controlled by the setting ―Z1_PS blocking‖. If the
setting ―Z1_PS blocking‖ is set to ―off‖, power swing blocking is disabled. If the
setting ―Z1_PS blocking‖ is set to ―on‖, power swing blocking is enabled.
distance relay are opened through detecting fault. Relay startup reclose after
Zone 1EXTN trip.
Five zones distance relay don‘t consider power swing blocking after
sudden-change current startup for the setting ―T_PS NOBLOCKING‖.
e) Permanent trip for three-phase fault:
Relay will permanent trip for three-phase fault.
f) Under the condition of loss of measure voltage, every zone of the distance
relay exits working. The over current protections of loss of measure voltage
are put into operation if the setting ―OC_VT fail‖ is enabled. Phase over
current and zero-sequence over current of loss of measure voltage will
permanent trip.
g) Switch-on-to- fault: If any impedance lies in the area of zone 1, zone 2, zone
3, relay permanent trip immediately.
-42-
CSC-101 EHV Transmission Line Protection Equipment Manual
“I_PS”start
up
Zero-
sequence ≥
current OR-1
startup &
Current AND-4
change |150 0|
startup
& ≥
Fault detect AND-1 OR-3
swing
unblocking
& ≥
Z1(2,3,4,5)_P AND-2 OR-2
S blocking &
AND-5
Forward
direction &
AND-3 & Trip single
AND-6
VT fail
Three &
AND-
phase fault 10
Zone 4 |T4 0|
Zone 5 |T5 0|
-43-
CSC-101 EHV Transmission Line Protection Equipment Manual
Figure 5.13 and Figure5.14 show operating times for the distance elements. The
diagrams show operating times at each test point. Operating times include output
contact closure time. For the distance element test, a fault was applied at a location
representing a percentage of the Zone 1 relay reach setting. Tests were performed for
source impedance ratios (SIR) of 0.1, 1.0, 10.0, and 30.0. No pre-fault load current or
fault resistance was included.
Four stages zero current and inverse time zero current protection are set during
three-phase operation. Directional element of four stages zero current protection
besides stage 1st can be selected. Stage 1 of zero current is controlled to be on or off
by the setting of ―3I01_FUNC‖,it only send permission signal, the others by the setting
-44-
CSC-101 EHV Transmission Line Protection Equipment Manual
The directional element of inverse time zero current protection can be on or off
via the setting of ―3I0_INV FUNC‖. Its characteristic is written as below:
T_factor
T T_INV
Id
( ) 1
N
3I0_INV
Where:Id ─ fault current.
T_factor ─ time coefficient of inverse time zero current.
N ─ Index setting of inverse time zero current.
3I0_INV ─ current setting of inverse time zero current.
T_INV ─ delay time setting of inverse time zero current which can meet the
requirement that inverse time zero current co-operates with different protection.
Inverse curves can be obtained according to the following setting:
N =0.02 and T_factor =0.14 ─ Standard inverse (IEC Standard);
N =1 and T_factor =13.5 ─ Very inverse;
N =2 and T_factor =80 ─ Extremity inverse.
-45-
CSC-101 EHV Transmission Line Protection Equipment Manual
Tab.5-5
Directional element
Item Tripping mode Output
controlled by
stage controlled by setting control
setting
stage 1 of zero the setting of
with direction Only send signal
current ―3I01_FUNC‖
stage 2 of zero the setting―3I02 the setting of
permanent trip
current DIR‖ is ―on‖ or ―off‖ ―3I02_FUNC‖
stage 3 of zero the setting―3I03 the setting of
permanent trip
current DIR‖ is ―on‖ or ―off‖ ―3I03_FUNC‖
stage 4 of zero the setting―3I04 the setting of
permanent trip
current DIR‖ is ―on‖ or ―off‖ ―3I04_FUNC‖
-46-
CSC-101 EHV Transmission Line Protection Equipment Manual
pole discordance
or evolving
operation:
no directional for
VT at line side.
the the setting of
Inverse time of
setting―3I0_INV permanent trip ―3I0_INV
zero current
DIR‖ is ―on‖ or ―off‖ FUNC‖
-47-
CSC-101 EHV Transmission Line Protection Equipment Manual
SOTF &
AND-8
≥ Permenent
|100 0|
≥ OR-4 trip
OR-4
|100 0|
|100 0|
Stage 2
|T02 0|
≥
OR-6
Stage 3
|T03 0|
&
Stage 4 AND-2
|T04 0|
3I0_Inverse ≥ |T0INV 0|
OR-6
“3I0_INV &
DIR” AND-2
I02(3,4)
_DIR disable
≥
I02(3,4)_DI OR-7
R enable
Forward
direction
& &
AND-1 AND-2
VT fail
-48-
CSC-101 EHV Transmission Line Protection Equipment Manual
directional element I U
A IA UBC
B IB UCA
C IC UAB
Forward-90°≤arg(U/I)≤30°。
forward
U
30°
The directional element of inverse time over current protection can be on or off
via the setting of ―OC _INV_ FUNC‖. Its characteristic is written as below:
Toc_factor
Toc Toc_INV
Id
( ) 1
N0c
Ioc_INV
Where:Id ─ fault current.
Toc_factor ─ time coefficient of inverse time over current.
Noc ─ Index setting of inverse time over current.
Ioc_INV ─ current setting of inverse time over current.
Toc_INV ─ delay time setting of inverse time over current which can meet the
requirement that inverse time over current co-operates with different protection.
Inverse curves can be obtained according to the following setting:
N =0.02 and T_factor =0.14 ─ Standard inverse (IEC Standard);
N =1 and T_factor =13.5 ─ Very inverse;
N =2 and T_factor =80 ─ Extremity inverse.
-49-
CSC-101 EHV Transmission Line Protection Equipment Manual
“OC_FUNC”
Iφ>Ioc_pe
&
AND-2
OC_DIR ≥ Toc_pe
OR-1
≥ permanent
Forward OR-1 trip
direction
≥
“OC_INV DIR” OR-2
Toc
“OV1_TRIP_FUNC”
Uφ>OV1_pe Tov1_pe
≥ Permenent
“OV2_TRIP_FUNC” OR-1 trip
Uφ>OV2_pe Tov2_pe
“OV1_ALARM_FUNC”
Uφ>OV1_pe Tov1_pe O/V1 Alarm
“OV2_ALARM_FUNC”
Uφ>OV2_pe Tov2_pe O/V2 Alarm
-50-
CSC-101 EHV Transmission Line Protection Equipment Manual
measured directly at the VT. The under voltage protection Function can be applied to
via binary settings.
Each phase voltage is compared with the setting value ―UV1_pe‖ after numerical
filtering. Voltages under the associated pickup value are detected and signalled.
After expiry of the associated time delays ―Tuv1_pe‖a trip command or a alarm
command is issued. The following figure (Fig.5-19) shows the logic diagram for first
stage under voltage. The stage can be operation via a binary setting
―UV1_TRIP_FUNC‖ or ―UV1_ALARM_FUNC‖ . Two stages under voltage is permanent
trip.
“UV1_TRIP_FUNC”
Uφ<UV1_pe
Iφ>0.1In
& Tuv1_pe
AND-2
VT fail &
AND-1
≥ Permenent
Initiate AR
OR-1 trip
“UV2_TRIP_FUNC”
Uφ<UV2_pe & Tuv2_pe
AND-3
“UV1_ALARM_FUNC”
& Tov1_pe
U/V1 Alarm
Uφ<UV1_pe AND-4
&
“UV2_ALARM_FUNC” AND-5
Tov2_pe U/V2 Alarm
Uφ<UV2_pe
-51-
CSC-101 EHV Transmission Line Protection Equipment Manual
“ CBF _ FUNC”
IA>I_CBF
& T_ CBF
A phase trip AND1
≥1
OR2
Start CBF
B-PH
“ CBF _ FUNC”
IC>I_CBF
&
AND3 T_CBF
C phase trip ≥1
OR3
Start CBF
C-PH
three phase trip ≥1
OR4
Start CBF
3-PH
&
IA>I_CBF “ CBF _ FUNC” AND4 T_CBF
≥1
IB>I_CBF
OR5
IC>I_CBF
3I0>3I0_CBF
CBF startup
≥1 DIRECT
TRIP SEND
BB/CBF OR1
(OUTPUT)
OPERATED
&
AND3
POR
&
AND1
Z2 Enabled ≥1
OR1
PUR
&
AND2
Z1 Enabled
-52-
CSC-101 EHV Transmission Line Protection Equipment Manual
5.12 Autoreclose
When all three phases of the circuit breaker are open, three kinds of check mode
are provided as below.
a)Synchronism check:If the line voltages and bus bar voltages are larger than the
value of have voltage value, and meet the synchronous conditions, synchronizing
reclose can be performed.
b)Low voltage check:If the line voltages are checked to be less than17V, reclose
can be performed. If the line voltages and bus bar voltages are all larger than 40V
the check mode is automatically turned to synchronism check to reclose.
c)No check:Whatever the line voltage and bus bar voltage are, autoreclose is
performed.
Note : (1)The threshold of low voltage check is 17V of rated voltage and that of
voltage check is 40V of rated voltage, the angle of synchronism check can
be set.
(2)The voltage phases of synchronism check or low voltage check need
not be set, as the protection system can automatically identify, that is to say,
if autoreclose mode is selected to AR_3p mode or AR_1p(3p) mode,
autoreclose check mode is set to synchronism check or no-voltage check,
the voltage phases is identified according to the voltage from the bus and
line. When CB is closed, if the voltage phases whose voltage can be
satisfied with synchronism check can‘t be found, < SYN Voltage Err > is
alarmed, and A-phase voltage is regarded as the synchronism voltage.
The voltages provided for the relays are always from the bus VT, so the
-53-
CSC-101 EHV Transmission Line Protection Equipment Manual
To avoid repetitious autoreclose, a special timer with charging interval for the
setting ―T_Reclaim‖ is set to perform the function of charge and discharge. Only after
charge has been finished, autoreclose is enabled and LED for monitoring charge on
the faceplate is lightened while charge is not finished, autoreclose is disenabled and
the LED is off.
a) The charge time counter starts when the following conditions are satisfied.
(1) There is no input of ―CB OPEN A (B,C)-PHASE‖.
(2) AR_exit mode is not selected.
(3) The startup elements of autoreclose do not operate.
(4) No input of blocking autoreclose.
b) The charge time counter is reset when the following conditions are satisfied.
(1) AR_exit mode is selected.
(2) Under AR_1p mode, the protection trips three phases, or three-pole of CB is
opened.
(3) External signals of blocking reclose are received.
(4) Discharge is performed when the reclosure command is output.
(5) There is no input of ―CB OPEN A (B,C)-PHASE‖ or ―INITIATE 1(3)PH A/R‖ when
charge is not finished.
(6)During autoreclose startup, the opened phase has current.
Two kinds of pickup mode are set by relay internal trip, input of other relay trip or
the auxiliary contacts of CB.
a) Autoreclose startup caused by other relay trip
Two input terminals include < INITIATE 3PH A/R > and < INITIATE 1PH A/R >. The
relay must return immediately after a successful tripping and reclosure is started after
the contacts return from the close position.
When a single-phase fault occurs, the time counter for single-phase reclose will
stop immediately if the digital input of autoreclose pickup caused by three-pole trip
has received, and the counter for three-phase reclose will start after the contacts of
autoreclose pickup caused by three-pole trip return. Although there are two inputs of <
INITIATE 3PH A/R > and < INITIATE 1PH A/R > for autoreclose shot caused by relay
operation to distinguish single- or three-phase tripping, three inputs of ―CB OPEN A
(B,C)-PHASE‖ are also detected to prevent three-phase tripping from single-phase
reclose.
b) Internal tripping signals have pick up autoreclose, therefore, the two input
-54-
CSC-101 EHV Transmission Line Protection Equipment Manual
terminals for< INITIATE 3PH A/R > and < INITIATE 1PH A/R > which need not be
connected again from external contacts. Only distance zone 1 and pilot relay operate
to startup reclose. Other relays operate to block AR.
c) Autoreclose shot caused by the auxiliary contacts of CB
Autoreclose shot caused by the auxiliary contacts of CB is mainly considered for
CB occasional mal-open. Only three contacts of trip relays are employed to
distinguish single-phase tripping from three-phase tripping for autoreclose shot
caused by the discrepancy of switch position and CB state, so autoreclose discharge
has to be performed according to the input of blocking reclose for manual tripping.
The CB occasional mal-open of single-phase and that of three-phase can be set
respectively by the setting to decide whether to pick up reclose or not.
In addition, no accelerated contacts are given after successful reclose caused by
the auxiliary contacts of CB.
5.12.5 Reclose
When autoreclose is picked up, the following functions are performed before
reclose signal output.
a) Continue to detect the input of ―A/R BLOCK‖. If it is received, time counter of
charging will be cleared, and the program of autoreclose will be reset.
b) Under the condition of AR_3p mode or AR_1(3)p mode, when autoreclose is
picked up by single-phase trip or single-phase occasional mal-open, the digital
input of autoreclose startup caused by three-phase tripping or that of auxiliary
contacts of three-pole trip of CB are continuously detected. If the input is received,
autoreclose is performed according to AR_3p mode.
c) Voltage check is performed according to the setting of voltage and synchronism
check, if voltage condition is not satisfied, the counter of time delay of
autoreclose is cleared.
d) If reclose command is sent out, autoreclose module is reset in 4s.
When autoreclose is picked up, the discharging conditions are satisfied,
autoreclose module is reset immediately and reclose is disabled.
If it is caused by unsatisfied synchronism conditions or the others that reclose can
not be performed successfully, autoreclose model will be reset with a certain time
delay. Under single-phase autoreclose mode, this delay time is the setting delay
of single-phase autoreclose+12s. Under three-phase autoreclose mode, it is the
setting delay of three-phase autoreclose +12s‖.
The voltages provided for the CSC-101 protection system are always from the bus
VT, so the reference voltage is referred to the voltage at terminal Ux for no-voltage
check or synchronism check. If the line voltages and bus voltages are all larger
than the value of voltage setting, the check mode is automatically turned to
synchronism check.
Relay will block reclose when any conditions occur, at the same time, it gives
output of ―AR Lockout Alarm‖.
-55-
CSC-101 EHV Transmission Line Protection Equipment Manual
The CB closed state are detected according to trip and current, when two series of
autoreclose are set for one breaker and both of them are put into operation, it is
impossible for the second autoreclose to take place.
When relay had sent command of ―reclose‖, but the breaker don‘t reclose, the input
of ―CB OPEN A(B,C)-PHASE‖ is ―1‖. Relay think reclose fail, and give the event
report of ―AR fail‖.
-56-
CSC-101 EHV Transmission Line Protection Equipment Manual
not is determined by the setting, that is the setting ―AR_CB(1)‖. Under AR_1(3)p
mode, CB can be still reclosed for the single-phase occasional mal-tripping.
Under AR_3p mode or AR_1(3)p mode, if the three-phase occasional mal-tripping
occurs, whether starting the reclosure or not is determined by the setting, that is the
setting ―AR_CB(3)‖,the setting ―AR_CB(3)‖ is set to ―1‖ to enable autoreclose. The
setting ―AR_CB(3)‖ is set to ―off‖ to disenable autoreclose. Under AR_1p mode, CB
can‘t be reclosed for the three-phase occasional mal-tripping.
CB OPEN A-
PHASE
CB OPEN B- ≥
PHASE “AR_CB(1)”
OR-1 &
AND-2
CB OPEN C-
PHASE
&
AND-1
“INITIATE
1PH A/R ”from ≥ T1p_AR
OR-4
“1” to “0”
≥ &
Distance single OR-2 AND-3
≥
trip Reclose
OR-6
“INITIATE
“AR_CB(3)”
3PH A/R”from
“1” to “0”
≥
Distance three OR-3
≥
OR-5
trip
AR_1p mode
& T3p_AR
AND-4
AR_3p mode
≥
OR-7
AR_1(3)p mode
No check
“AR_check Syn”
Syn meet
≥
OR-8
Low voltage
“AR_check low U”
A/R BLOCK
-57-
CSC-101 EHV Transmission Line Protection Equipment Manual
Equipment parameter
A/R BLOCK
enabled
DI & Trigger
A/R BLOCK AND3 Record
From “1”to”0” &
AND1
Equipment parameter
A/R BLOCK DOWN
enabled ≥1
OR1
Equipment parameter
A/R BLOCK DOWN
unenabled &
AND2
DI
A/R BLOCK
From “0”to”1”
-58-
CSC-101 EHV Transmission Line Protection Equipment Manual
Reset‖ elapsing, the whole system resets. If the internal fault occurs during the time
of SOTF enable, the tripping command will be issued.
The condition of ―CLOSE SWITCH‖ can be active if the binary input of ―CLOSE
SWITCH‖ is on, the precondition for this condition is that the startup element do not
operate. If this binary input is active more than 10s, the alarm will be issued and
SOTF protection function based on this condition will be blocked.
When the CB is closed on faulty line manually or by auto-reclosing function, if
distance protection element zone1, zone2 and zone3 are enabled, the zone 1, zone 2,
or zone 3 distance protection element will operate instantaneously so long as the
measuring impedances enter into the one of three operating zone, and the phase
current is more than the setting of ―I_SOTF_Dist‖.
When the equipment has detected CB in open position before, and the fault phase
current is larger than 0.1In(single phase reclose mode of auto-reclosing function) or
any one phase current is larger than 0.1In(three phase reclose mode of
auto-reclosing function) or the input of auxiliary CB contact drop out, the equipment
will confirm that the line has been reenergized.
The SOTF function can be blocked by inrush current if the ratio of second
harmonic current component to fundamental current component is higher than the
setting when the binary setting for inrush blocking function is enabled, the inrush
current feature operates based on evaluation of the 2 nd harmonic content which is
present in measured current.
The inrush blocking function is effective for zone 2 and zone 3 distance protection
element, zero sequence current protection element, when is applied for SOTF, and for
SOTF overcurrent element too.
Furthermore, by recognition of the inrush current in one phase, it is possible to set
the protection in a way that not only the phase with the considerable inrush current,
but also the other phases are blocked for a certain time. This is achieved by
cross-blocking feature.
The inrush restraint function has a maximum inrush current setting. Once the
measuring current exceeds the setting, the SOTF protection will not be blocked any
longer.
-59-
CSC-101 EHV Transmission Line Protection Equipment Manual
DI “CB OPEN t 0
OR
B-PHASE”
AND
DI “CB OPEN
C-PHASE” OR
DI “CB OPEN t 0
AND
B-PHASE”
DI “CB OPEN
C-PHASE” OR 0 1s
No relay startup
Relay startup
SOTF TRIP
SOTF Inrush Block AND
(permanent)
Harmonic Blocking
AND
Distance operation
AND
Ia(or Ib , Ic) >
OR
“I_SOTF_Dist” 0 1s SOTF disable
automatically
SOTF OC
AND
Ia(or Ib , Ic) >
“I_SOTF”
100ms 0
Zero-
sequence
operation
AND
No fault
DI “Close Switch” =
1 / ON
AND 10s 0 DI_SOTF Err
-60-
CSC-101 EHV Transmission Line Protection Equipment Manual
-61-
CSC-101 EHV Transmission Line Protection Equipment Manual
7. Operation
7.1 Safety precautions
During the equipment tests and start-up, the general safety regulations applicable to
electrical systems must be complied with. Failure to comply with these regulations
might cause harm to the working staff and damage to property. All the inspections and
tests must only be carried out by specially trained personnel.
• Check the enclosure shell has been grounded reliably and maintain electric
continuity to earth.
• The general safety regulations applicable to equipments must be strictly
complied with.
• Insert or pull out models must be strictly prohibit during the equipment tests and
operation.
• During operation, nobody is allowed to press the keyboard on the panel
optionally.
• During operation, nobody is allowed to operate the following commands:
▪ Test DO;
▪ Modification and write settings;
▪ Set up numbers of running CPU;
▪ Change setting zone;
▪ Change address used communication net.
7.2 Dialog with the equipment
Setting operation and interrogation of digital protection systems can be carried out
via the integrated membrane keyboard and display panel located on the front plate.
All the necessary operating parameters can be entered and all the information can be
read out from here. For example display, main menu, debugging menu. Operation is,
-62-
CSC-101 EHV Transmission Line Protection Equipment Manual
Front panel adopts little arc streamline and beelines sculpt, and function keys for
MMI are reasonably distributed in faceplate. Panel layout is shown in Figure 7-1.
CSC-101
Run RESET
Trip A
Trip B
Trip C
Reclose
Recharge
Chan Err QUIT SET
Alarm
F1 F2 F3 F4 + -
SIO
Press this key for loop display. Current screen can be fixed to be displayed
(there is a key mark on the right corner of screen, viz. orientating current screen),
press again to cancel orientating function. Press this key during menu operation to
cancel current operation to return the upper menu. Press this key to return normal
display state to operate other key.
RESET : Used to reset LED of signal and output , return to loop display state.
Four shortcut keys and two function keys under LCD
《F1》: Press one time, prompt Print the latest event report?
YES NO
If select YES, prompt Format of printed record wave? Graph Data to select
-63-
CSC-101 EHV Transmission Line Protection Equipment Manual
-64-
CSC-101 EHV Transmission Line Protection Equipment Manual
-65-
CSC-101 EHV Transmission Line Protection Equipment Manual
-66-
CSC-101 EHV Transmission Line Protection Equipment Manual
Set Time Current Year month day hour minute sec Modify with the
Set Year month day hour minute sec key of UP DOWN
LEFT RIGHT
Contrast Test effect Modify contrast with key of UP and DOWN
SimuReSig Simu Alarm, Simu Trip, Simu connt, Simu Use √ or × to
Testing DI,TransRecData, Simu MST Alarm select
SwSetGrp Switch setting zone Input password at
ViewDrift Ia,Ib,Ic,3I0,Ua, In, Ub,Uc,Ux, IaR,IbR,IcR,3I0R first
AdjDrift Ia,Ib,Ic,3I0,Ua, In, Ub,Uc,Ux, IaR,IbR,IcR,3I0R
ViewScale Ia,Ib,Ic,3I0,Ua, In, Ub,Uc,Ux, IaR,IbR,IcR,3I0R
AdjScale Ia,Ib,Ic,3I0,Ua, In, Ub,Uc,Ux, IaR,IbR,IcR,3I0R
PrtSample Print sampled data of nominated CPU
Contrast LCD Contrast Regulation Modify with the
key of UP DOWN
Remarks:
(1) In the menu of Setup-SetPrint-RecPrt Setup-SetPrint AI,analog
quantities provided for selection are :
Ia , Ib , Ic ,3 I 0 , In , Ua , Ub , Uc , Ux ,IaR,IbR,IcR,3I0R, which means three phase
currents, Zero-sequencs current, three phase voltage, reference voltage and
redundancy currents respectively.
(2) In the menu of Setup-SetPrint-RecPrt Setup-SetPrint Do,digital inputs
provided for selection are: relay startup, trip A, trip B, trip C, trip_No AR, DI_relay
3P trip, CB_A open, CB_B open, CB_C open, reclose, send signal, receiving
signal, AR_P1 trip , AR_P3 trip, AR_Blk ect.
(3) If the input of ―Relay Test‖ is enabled during debugging,operating reports
are neither transported nor saved, just output to be printed or displayed on PC. If
record report need to be printed, PC has to be exited, otherwise only reports can
be printed, nor can wave.
(4)Enter into the menu of measuring quantities and analog quantities, then
perform the relay testing, it is convenient for debugging that this menu need not
return in order to view whether the input analog quantities are consistent with the
values of the relay display or not. Here, if the input of ―Relay Test‖ is enabled, the
displayed values are refurbished more quickly.
(5)Input line name on faceplate of the device, whose method is referenced to the
appendix.
Press QUIT+SET to enter into debugging menu for leaving factory. Input debugging
password, the menu is presented with 8 categories. Select one category to press SET,
more notation is given as shown in Tab.7.1-2.
Tab.7.1-2
Name Function Remarks
Setup CPU CPU1、CPU2…CPU8 Use UP or DOWN
-67-
CSC-101 EHV Transmission Line Protection Equipment Manual
The setting procedure can be ended at any the time by the key ―SET‖ or ―QUIT‖. If
you press the key ―SET‖, the display shows the question ―choose setting zone‖. The
range of setting zone is from 0 to 31. Confirm with the setting zone-key ―SET‖ those
new settings shall be come valid now. If you press the key ―QUIT‖ instead, all
alterations which have been changed since the last. Thus, erroneous alterations can
be made ineffective.
-68-
CSC-101 EHV Transmission Line Protection Equipment Manual
Tab.7-3
Abbr.
NO. (LCD Meaning Unit Setting range
Display)
1. I_abrupt Abrupt current A 0.2~20(0.04~4)
Through current detect
2. I_PS A 2.5~100(0.5~20)
power swing
Zero-sequence reactance
3. Kx -0.33~8
compensation factor
-69-
CSC-101 EHV Transmission Line Protection Equipment Manual
Zero-sequence resistance
4. Kr -0.33~8
compensation factor
Zero-sequence reactance
5. Km compensation factor for -0.33~8
double line
Positive reactance of whole
6. X_line Ohm 0.01~80(0.05~400)
line
Positive resistance of whole
7. R_line Ohm 0.01~80(0.05~400)
line
8. Line length Line length km 0.1~999
9. U_PRIMARY Primary rated voltage kV 100~800
CT_PRIMAR 0.05~5
10. Primary rated current kA
Y
CT_SECON 1 or 5
11. Secondary rated current A
DARY
Zone 1 Resistance of earth 0.01~80(0.05~400)
12. R1_pe Ohm
distance
Zone 1 Reactance of earth 0.01~80(0.05~400)
13. X1_pe Ohm
distance relay
Zone1 Extern Resistance of 0.01~80(0.05~400)
14. R1EXT_pe Ohm
earth distance
Zone1 Extern Reactance of 0.01~80(0.05~400)
15. X1 EXT _pe Ohm
earth distance relay
Zone 2 Resistance of earth 0.01~80(0.05~400)
16. R2_pe Ohm
distance
Zone 2 Reactance of earth 0.01~80(0.05~400)
17. X2_pe Ohm
distance relay
Zone 3 Resistance of earth 0.01~80(0.05~400)
18. R3_pe Ohm
distance
Zone 3 Reactance of earth 0.01~80(0.05~400)
19. X3_pe Ohm
distance relay
Zone 4 Resistance of earth 0.01~80(0.05~400)
20. R4_pe Ohm
distance
Zone 4 Reactance of earth 0.01~80(0.05~400)
21. X4_pe Ohm
distance relay
Zone 5 Resistance of earth 0.01~80(0.05~400)
22. R5_pe Ohm
distance
Zone 5 Reactance of earth 0.01~80(0.05~400)
23. X5_pe Ohm
distance relay
Delay time of Z1 ground 0~10
24. T1_pe s
distance relay
Delay time of Z1 Extern 0~10
25. T1EXT_pe s
ground distance relay
Delay time of Z2 ground 0~10
26. T2_pe s
distance relay
Delay time of Z3 ground 0~10
27. T3_pe s
distance relay
Delay time of Z4 ground 0~10
28. T4_pe s
distance relay
Delay time of Z5 ground 0~10
29. T5_pe s
distance relay
Zone 1 Resistance of ph-ph 0.01~80(0.05~400)
30. R1_pp Ohm
distance
Reactance of 1st ph-ph 0.01~80(0.05~400)
31. X1_pp Ohm
distance relay
-70-
CSC-101 EHV Transmission Line Protection Equipment Manual
-71-
CSC-101 EHV Transmission Line Protection Equipment Manual
-72-
CSC-101 EHV Transmission Line Protection Equipment Manual
-73-
CSC-101 EHV Transmission Line Protection Equipment Manual
-74-
CSC-101 EHV Transmission Line Protection Equipment Manual
1) The setting values are all secondary values if there is no special note.
Impedance setting is set according to positive impedance of line. All
zero-sequence current is 3I0.
2) I_abrupt:0.2In is commonly recommended.
3) In general, the primary value of settings ―I_abrupt, I_PS‖ must be consistent
of both sides of one line. However, for some special instance, if the sensitivity
difference between protections of both sides is too large, the settings of both
sides may also be different.
4) ―I_PS‖:Set by avoiding the maximum load current.
5) reactance compensation factor : Calculated based on the actual line
parameters, setting value ought to be less than or close to calculation value.
KX = (X0-X1 ) / 3X1
6) resistance compensation factor : Calculated based on the actual line
parameters, setting value ought to be less than or close to calculation value.
KR = (R0-R1 ) / 3R1
7) mutual inductance factor:Calculated based on the actual line parameters,
setting value ought to be less than or close to calculation value.X0m is zero
sequence mutual inductance reactance with the double lines. 3X1 is positive
reactance that protection equipment locates the line.
Km= X0m/ 3X1
-75-
CSC-101 EHV Transmission Line Protection Equipment Manual
-76-
CSC-101 EHV Transmission Line Protection Equipment Manual
24) Over current setting for VT fail: Only used after VT fail, set by single phase
current to avoid load current and be satisfied with sensitivity for terminal fault.
25) Zero-sequence over current for VT fail: Only used after VT fail, set to be
satisfied with sensitivity for terminal fault.
26) Delay time for VT fail: Delay setting of over current and zero-sequence over
current for VT fail.
27) T_PS NOBLOCKING: Time Power Swing no blocking. Distance trip that it
don‘t need open condition after relay startup for ―T_PS NOBLOCKING‖.
28) Current of the first stage Zero-sequencs current relay:Set to avoid the
maximum Zero-sequencs current at ground fault of current line end.
29) Current and delay time setting of 2nd, 3rd and 4th stage Zero-sequencs current
relay: According to the matched requirements. 4th stage Zero-sequencs
current need not be disenabled during open-phase operation but its delay is
lessened 0.5s than the delay time setting of 4th stage Zero-sequencs current
relay (notice:this delay must be larger than the delay of single-phase
reclosure).
30) Settings of inverse time Zero-sequencs current relay: Standard inverse time
curve is recommended.
31) ―Dev_Angle AR‖:The permissive biggest phase difference between bus
voltage and line angle under synchronization check mode.
32) ―DU_AR‖:The permissive biggest phase difference between bus voltage and
line voltage under synchronization check mode.
33) Current threshold of Zero-sequencs current auxiliary pickup element need not
be set independently, which is created automatically considering sensitivity
coefficient according to the minimum of the settings of fourth stage of
Zero-sequencs current and pilot Zero-sequencs current.
34) ―I_CBF‖: Startup Current of Breaker FAIL, The setting is phase current.
35) 3I2_BROKEN COND: Negative Current of distinguish Broken conductor. The
setting is 3I2.
-77-
CSC-101 EHV Transmission Line Protection Equipment Manual
function while the remote should not be enabled that. That is only one of both
terminals is enabled this bit.
2) Blocking mode: If this bit is set to ―on‖, bits ―POR mode‖ and ―PUR mode‖
must be set to ―off‖. Under this mode, if zone4 of distance for reverse direction
act relay need to send blocking signal, close the contacts of send signal to
transmit blocking signal, if need to stop sending blocking signal, open the
contacts of sending signal to stop sending blocking signal.
3) POR mode: If this bit is set to ―on‖, bits ―Blocking mode‖ and ―PUR mode‖
must be set to ―off‖. Under this mode, if zone2 of distance act relay need send
permissive signal, close the contacts of sending signal to send permissive
signal, if need to stop sending permissive signal, open the contacts of sending
signal to stop sending permissive signal.
4) PUR mode: If this bit is set to ―on‖, bits ―Blocking mode‖ and ―POR mode‖
must be set to ―off‖. Under this mode, if zone2 of distance act relay need send
permissive signal, close the contacts of sending signal to send permissive
signal, if need to stop sending permissive signal, open the contacts of sending
signal to stop sending permissive signal.
5) Distance protection function enabled: zone 1, zone 2, zone 3 and zone4 can
separately enabled.
6) Reverse_Z4 and forward_Z4: zone4 of distance can be select act for reverse
direction or forward direction.
7) Power swing Blocking: zone 1, zone 2, zone 3 and zone4 can separately
select to blocking or unblocking during power swing. When the bit is set to
―on‖, distance relay must be enabled by power swing blocking elements after
sudden-change current startup element has been operating for 150ms or loss
of stability detector operates. If the bit is set to ―off‖, zone distance relay is
enabled from startup to whole system reset.
8) Zero protection function enabled: stage 1, stage 2, stage 3, stage 4 and
inverse time zero current can separately enabled.
9) Inverse time Zero-sequencs current direction enabled: If this bit is set to ―on‖,
inverse time Zero-sequencs current trip when fault occur at forward direction.
If this bit is set to ―off‖, inverse time Zero-sequencs current can trip whatever
fault occurs at forward direction or inverse direction.
10) Over current enabled after VT fail: If it is set to ―on‖, over current and
zero-sequence over current for VT fail will be enabled after VT fail. If this bit is
set to ―off‖, only Zero-sequencs current relays set without directional element
are reserved after VT fail, distance relay and the other Zero-sequencs current
relays set with directional element are all disenabled.
-78-
CSC-101 EHV Transmission Line Protection Equipment Manual
11) Bits of no check enabled, lower voltage check enabled and synchronization
check enabled: All of these three modes are autoreclosure check modes, if
anyone of them is set to ―on‖, the others must be set to ―off‖.
12) Single- or three-phase occasional mal-tripping to pick up autoreclosure: If it is
set to ―off‖, when single- or three-phase occasional mal-tripping occurs,
autoreclosure will not operate. If it is set to ―on‖, when single- or three-phase
occasional mal-tripping occurs, autoreclose is performed with settled mode
and delay time.
Abbr.
NO. Meaning Unit Setting range
(LCD Display)
1. Pre Fault Time of recorder before fault occur s 0.05~0.3
2. Post Fault Time of recorder after fault occur s 1~4.5
NO. Abbr.(LCD
Meaning
Display)
1. CB OPEN A Input of CB OPEN A trigger DR
2. CB OPEN A
Input of CB OPEN A from ‗1‘ to ‗0‘trigger DR
DOWN
3. CB OPEN B Input of CB OPEN B trigger DR
4. CB OPEN B
Input of CB OPEN B from ―1‖to ―0‖ trigger DR
DOWN
5. CB OPEN C Input of CB OPEN C trigger DR
6. CB OPEN C
Input of CB OPEN C from ―1‖to ―0‖ trigger DR
DOWN
7. A/R BLOCK Input of A/R BLOCK trigger DR
8. A/R BLOCK
Input of A/R BLOCK from ―1‖to ―0‖ trigger DR
DOWN
9. INIT 3PH AR Input of INIT 3PH AR trigger DR
10. INIT 3PH AR
Input of INIT 3PH AR from ―1‖to ―0‖ trigger DR
DOWN
11. INIT 1PH AR Input of INIT 1PH AR trigger DR
12. INIT IPH AR
Input of INIT 1PH AR from ―1‖to ―0‖ trigger DR
DOWN
13. BB/CBF OPTD Input of BB/CBF OPTD trigger DR
14. BB/CBF OPTD
Input of BB/CBF OPTD from ―1‖to ―0‖ trigger DR
DOWN
15. CAR
Input of CAR RECV_DIST trigger DR
RECV_DIST
16. CAR
RECV_DIST Input of CAR RECV_DIST from ―1‖to ―0‖ trigger DR
DOWN
17. CAR
Input of CAR RECV_DEF trigger DR
RECV_DEF
18. CAR
Input of CAR RECV_DEF from ―1‖to ―0‖ trigger DR
RECV_DEF
-79-
CSC-101 EHV Transmission Line Protection Equipment Manual
DOWN
19. DIRECT TRIP
Input of DIRECT TRIP RECV trigger DR
RECV
20. DIRECT TRIP
Input of DIRECT TRIP RECV from ―1‖to ―0‖ trigger DR
RECV DOWN
21. CAR FAIL_DIST Input of CAR FAIL_DIST trigger DR
22. CAR FAIL_DIST
Input of CAR FAIL_DIST from ―1‖to ―0‖ trigger DR
DOWN
23. CAR FAIL_DEF Input of CAR FAIL_DEF trigger DR
24. CAR FAIL_DEF
Input of CAR FAIL_DEF from ―1‖to ―0‖ trigger DR
DOWN
25. INIT CBF A_PH Input of INIT CBF A_PH trigger DR
26. INIT CBF A_PH
Input of INIT CBF A_PH from ―1‖to ―0‖ trigger DR
DOWN
27. INIT CBF B_PH Input of INIT CBF B_PH trigger DR
28. INIT CBF B_PH
Input of INIT CBF B_PH from ―1‖to ―0‖ trigger DR
DOWN
29. INIT CBF C_PH Input of INIT CBF C_PH trigger DR
30. INIT CBF C_PH
Input of INIT CBF C_PH from ―1‖to ―0‖ trigger DR
DOWN
31. INIT CBF 3_PH Input of INIT CBF 3_PH trigger DR
32. INIT CBF 3_PH
Input of INIT CBF 3_PH from ―1‖to ―0‖ trigger DR
DOWN
33. 1PH TRIP
Input of 1PH TRIP ENABLE trigger DR
ENABLE
34. 1PH TRIP
Input of 1PH TRIP ENABLE from ―1‖to ―0‖ trigger DR
DOWN
35. STUB PROT
Input of STUB PROT ENABLE trigger DR
ENABLE
36. STUB PROT
Input of STUB PROT ENABLE from ―1‖to ―0‖ trigger DR
DOWN
37. DI CONFIG1
Input of DI CONFIG1 trigger DR
ENABLE
38. DI CONFIG1
Input of DI CONFIG1 from ―1‖to ―0‖ trigger DR
DOWN
39. DI CONFIG2
Input of DI CONFIG2 trigger DR
ENABLE
40. DI CONFIG2
Input of DI CONFIG2 from ―1‖to ―0‖ trigger DR
DOWN
41. DI CONFIG3
Input of DI CONFIG3 trigger DR
ENABLE
42. DI CONFIG3
Input of DI CONFIG3 from ―1‖to ―0‖ trigger DR
DOWN
43. VT fail trigger
VT fail trigger DR
DR
7.3.3Communication parameters
The communication parameters of CSC-101 series system are all the same.
Each meaning of them and their setup methods are shown in Tab.7-5.
-80-
CSC-101 EHV Transmission Line Protection Equipment Manual
Tab.7-5
No Parameter Range Setup method Remark
.
01 Current setting 00~31 Use 《+》and 《-》 Current number of
zone keys on faceplate to setting zone
modify current setting
zone number
02 Device address 10~ABH Enter into menu system Address range : 10 ~
setup—communication ABH。
address—Lon network
and 485 address
03 Baud rate of 9600 Means that baud rate of (192000 and 38400
series port RS485 is 9600 can be set)
04 Bay Name Set actual line name by CSPC Character numbers of
program or ISN on panel line name can not be
larger than 30
05 Type of 101 B2H Enter into menu system function code of
setup—101 function CSC-101 is B2H
type to set
IEC60870-5-103
function code
06 Time Mode Network Enter into menu system Optional network
mode, setup—timing mode mode, pulse mode
pulse mode based on GPS
07 Protocol type Communic Enter into menu system CSC-2000 protocol can
ation setup—protocol option be selected for LON
protocol net or Ethernet. This
V1.20 option need not be
Communic disposed when
ation information of
protocol IEC60870-5-103
V1.10 protocol are output
from port 485.
08 SOE reset Manual Enter into menu system Optional manual reset
reset, setup—SOE reset (receive reset
automatic command to reset
reset SOE) or automatic
reset (reset SOE in
10s)
09 Address of ***.***.***. Enter into menu system Set according to local
Ethernet 1 *** setup—communication condition, can not be
(net section address—Ethernet 1 the same as section 2
1.2.3.4) or 3 Ethernet 2
10 Address of ***.***.***.** Enter into menu system Set according to local
Ethernet 2 * setup—communication condition, can not be
(net section address—Ethernet 2 the same as section 2
1.2.3.4) or 3 Ethernet 1. If it is
connected to CSN
protocol switched case
to extend RS-485,
address of Ethernet 2
must be set as:
10.10.6.124
-81-
CSC-101 EHV Transmission Line Protection Equipment Manual
7.4 Annunciations
7.4.1Event reports
-82-
CSC-101 EHV Transmission Line Protection Equipment Manual
-83-
CSC-101 EHV Transmission Line Protection Equipment Manual
-84-
CSC-101 EHV Transmission Line Protection Equipment Manual
Tab. 7-8a
No. Report Detail Solutions
1 Communication Communication CPU working abnormlity or CAN
Fail failure network communication error. Check
CPU working status, or check CAN
network on backboard.
2 DevPara Discord Device parameter Solidify parameter once more, and
discordance power on again, this alarm should
disappear
3 SetGroup Discord Setting group Switch setting zone once more, and
discordance power on again, this alarm should
disappear
4 Setting Discord Setting Solidify setting once more, and power
(CSPC: Setting discordance on again, this alarm should disappear
Differential)
5 Connector Discord Connector On or off strap once more, and power
discordance on again, this alarm should disappear
LON1 Comm Fail LON1 If LON1 need not be configured ,
6 Communication cancel configuration of LON1 from
failure system option menu of debugging
menu for leaving factory, and power
on again. This alarm should
disappear. If LON1 needs to be
configured, it is necessary to replace
MD3120 chip
7 LON2 Comm Fail LON2 If LON2 need not be configured ,
Communication cancel configuration of LON2 from
failure system option menu of debugging
menu for leaving factory, and power
on again. This alarm should
disappear. If LON2 needs to be
configured, it is necessary to replace
MD3120 chip
8 Write Set Fail Write settingWrite setting again
failure
9 Write DevPara Fail Write device Write device parameter again
parameter failure
No responsion for It is possible that the address of two CPU modules are the
summoning CPU same, one of CPU modules is not inserted or is connected
configuration badly.
Alarm code ×× One of CPU modules is disenabled.
-85-
CSC-101 EHV Transmission Line Protection Equipment Manual
This test needs to be performed for CPU1 and CPU2 respectively. If one CPU is
disenabled, ―The selected CPU disenabled or inexistence‖ will be displayed during
menu operation.
Before the device leaves factory, zero drift and calibration have been regulated,
only examination needs in locale. To examine calibration, enter into measuring
quantities or analog quantities menu at first, then enter into analog quantities menu to
do it. If they don‘t meet requirements, regulate them according to the following
methods. Notice to increase the setting value of startup elements.
To regulate zero drift, disconnect the device with testing instrument or standard
source to ensure not any input in AC terminal of the device. Enter into main
menu—testing—AdjDrift, select all, and confirm it, then zero drift regulation can be
performed. If regulation succeeds, report ―AdjDrift OK‖. After this, select main
menu—testing—ViewDrift, current channel must be less than 0.1A (rated value of TA
-86-
CSC-101 EHV Transmission Line Protection Equipment Manual
5A) or 0.02A (rated value of TA 1A), voltage channel must be less than 0.1V.
Connect input terminals of voltage UA, UB, UC and UX together, and connect UN
and UX‘ together, employ testing instrument with grade 0.5 and the above whose
outputs UA and UN are connected to protection terminals X1-a10 and b10. Current
outputs of testing instrument are connected to protection terminals X1-a1 and b4, and
current terminals of the protection are in series by polarity terminal. Enter into main
menu—testing—AdjScale, press keys 《up down left right》 and 《SET》 to select all,
set the regulation value to In and 50V, output AC quantities from testing instrument to
the protection system, then confirm these to execute. If fail to operate, LCD displays
analog channel error and the number of error channel. Check whether connection,
standard value and version are right or not.
After finishing calibration and zero drift regulation, measure linear error using
testing instrument with grade 0.5 and the abover, and write down testing result.
Requirements: For secondary rated current 5A of TA, input currents 25A, 10A (the
lasting time of the abover two is unallowed to exceed 10s), 2A, 1A and 0.4A
respectively. For secondary rated current 1A of TA, input currents 5A, 2A, 0.5A, 0.2A
and 0.08A. Supply voltage 60V, 30V, 5V, 1V and 0.4V respectively. Observe LCD
display or enter into main menu—testing—ViewScale, ask that the difference
between LCD display value and external meter is less than 0.1V for 0.4V and 1V of
voltage channel, the others are less than 2.5, and current channel error is less than
0.02In for 0.08In and 0.2In, the others are less than 2.5%.
Switch on DC power supply, the setting steps are described as follows to initialize
CPU.
Press ―QUIT‖ and ―SET‖ at the same time, enter into debugging menu.
a) Enter into the menu of ―CPU setup‖, enable all CPU1 and CPU2,press the key of
SET to save. And energize the device once again.
b)Enter main menu- Set Time,use square keyboard to set clock to current time. Then
return to the normal display LCD screen, observe whether the running clock is normal
or not. Cut off DC power supply for 5 min, then switch on, check the time and date
displayed in LCD screen to conform that the clock is running and nicety during power
turnoff.
-87-
CSC-101 EHV Transmission Line Protection Equipment Manual
Tab. 7-9-a
Analog quality Type B Analog quality Type B Analog quality Type B
Ia √ Ua √ Ia R ×
Ib √ Ub √ Ib R ×
Ic √ Uc √ Ic R ×
3I 0 √ 3U0_COUNT √ 3 I0 R ×
IN √ Ux √
Tab. 7-9-b
Name description CSC101B
Relay Startup Relay startup √
-88-
CSC-101 EHV Transmission Line Protection Equipment Manual
-89-
CSC-101 EHV Transmission Line Protection Equipment Manual
Note:where ―√‖ means that the corresponding input is selected while ―×‖ is not
selected,blank means none.
Enter into main menu-setup-SetPrint-Print Mode,press SET to display the
following:
Print mode setup
Print record automatically √
Print control word √
Print format of record data wave
If ―Print record automatically‖ is set to ―√‖, record wave will be printed after fault. If it is
set to ―×‖, only fault reports will be printed while record wave will not, and record
wave need to be fetched. If Print control word is set to ―√‖, contents of control word
can be printed, if ―×‖, contents of control word cannot be printed. Print format of record
data can be set to format of ―wave‖ or ―data‖ with 《UP》 and 《DOWN》 keys.
The recommended setup is ―Print record automatically‖, ―Print control word‖ and ―Print
format of record data‖ set to wave. If the protection operating results have some
questions, suggest that set “Print format of record data” to “data” at first, then,
print a record wave again(or use shortcut key F1 to directly print the latest one
of record data), after that, device testing can be followed. This can avoid losing
data, and causing disadvantage for furthermore analysis.
J) Check version of software
Enter into main menu-OpStatus-EquipCod,write down the device type,
version of each software and code of CRC, check the version consistent with the valid
version.
k) Check print function
1) main menu-Print-ProtSet Enter into this menu, select setting zone to print
setting. The printer ought to print correctly.
2) main menu-Print-Report Enter into this menu, select report or operation
record to print, the printer ought to print correctly.
3) Enter into main menu-Print-Setup, select such as running state, system
parameters and sampled data print etc respectively to print.
4) Testing print function of shortcut key on front panel: Use shortcut key on the
faceplate to print, the printer ought to print normally.
-90-
CSC-101 EHV Transmission Line Protection Equipment Manual
The function of the binary inputs and outputs represented in the general diagrams
relate to the factory settings. The assignment of the inputs and outputs of the internal
functions can be rear ranged and thus adapted to the on-site conditions.
a)Enter into main menu-OpStatus-DI, check the current state of each digital
input.
Connect +110V or +220V for X4:c2~c26 terminals and Connect +24V for
X4:a2~a26 terminals shown in Tab.11 as bellow, the corresponding inputs displayed
on the faceplate are valid. If certain input is error, check the corresponding optical
isolator, resistance etc are false welded, welded in reverse, or damaged.
Tab. 11
Name of input description DC voltage Terminals
RESET Reset signal +24V X4:a8
Input of A phase circuit breaker DC + X4:c4
CB OPEN A-PHASE
open
Input of B phase circuit breaker DC + X4:c6
CB OPEN B-PHASE
open
Input of C phase circuit breaker DC + X4:c8
CB OPEN C-PHASE
open
B/LBB OPTD Input of other relay action DC + X4:c14
CAR RECV(DIST) Input of distance signal DC + X4:c10
CAR RECV(DEF) Input of zero_def signal DC + X4:c24
DIRECT TRIP RECV Input of direct trip DC + X4:c12
CARR FAIL DIST Input of distance carrier fail DC + X4:c20
CARR FAIL DEF Input of zero_def carrier fail DC + X4:c26
A/R BLOCK Blocking auto reclose DC + X4:c22
INITIATE 3PH A/R Initiate three phase reclose DC + X4:a18
INITIATE 1PH A/R Initiate single phase reclose DC + X4:a16
Input of initiate A phase circuit DC + X4:a12
START CBF A-PH
breaker failure
Input of initiate B phase circuit DC + X4:a14
START CBF B-PH
breaker failure
Input of initiate C phase circuit DC + X4:a16
START CBF C-PH
breaker failure
Input of initiate three phase DC + X4:a18
START CBF 3-PH
circuit breaker failure
-91-
CSC-101 EHV Transmission Line Protection Equipment Manual
Enter into main menu-Test Do to perform output test. When output test is made,
the contacts of the corresponding relay ought to operate with lighting signal while
other contacts do not operate. Press button RESET on the faceplate to reset the
drived output. Test results should be consistent with the following table.
The output test of CSC101 B is shown in Tab.13。
Tab. 13
SN Item Contacts for Panel Lights To be displayed Conclusion
connection to be in ON on MMI
status
1. ALARM I X10:c26-a26 Flash of Run Test DO OK
X10:c28-a28 light ALARM I
Flash of
Alarm lamp
2. ALARM ii X10:c30-a30 Flash of Run Test DO OK
X10:c32-a32 light ALARM II
Light-on of
Alarm lamp
3. A_Phase Trip X7:a2-a4 Flash of Run Test DO OK
X7:c2-c4 light A_Phase Trip
X8:a2-a4 X8:c2-c4 Light-on of
X9:a2-a4 Trip A lamp
X9:a10-a12
4. B_Phase Trip X7:a2-a6 Flash of Run Test DO OK
X7:c2-c6 light B_Phase Trip
X8:a2-a6 X8:c2-c6 Light-on of
X9:a2-a4 Trip B lamp
X9:a10-a12
5. C_Phase Trip X7:a2-a8 Flash of Run Test DO OK
X7:c2-c8 light C_Phase Trip
X8:a2-a8 Light-on of
X8:c2-c8 TripC lamp
X9:a2-a4
X9:a10-a12
6. 3_Phase Trip X7:a2-a4 Flash of Run Test DO OK
X7:c2-c4 X7:a2-a6 light 3_Phase Trip
X7:c2-c6 Light-on of
X7:a2-a8 Trip A, B and
-92-
CSC-101 EHV Transmission Line Protection Equipment Manual
-93-
CSC-101 EHV Transmission Line Protection Equipment Manual
-94-
CSC-101 EHV Transmission Line Protection Equipment Manual
system
Short b1~b4 of AC module X1, IA, IB, IC and IN outputs of testing instrument are
connected to terminals X1-a1, X1-a2, X1-a3 and X1-a4 of the device, input rated
current and three-phase symmetry voltage 50 via a10, a9, b9 and b10 of X1
respectively, short b7 with b10 and a7 with a10, each phase voltage leads each
phase current phase angle 60°respectively, check LCD loop display or enter into main
menu—OpStatus—Measure to view, phase difference of A-, B-, and C-phase voltage
must be 120°, and phase difference of A-, B-, and C-phase current must be 120°. One
phase current must lag the corresponding phase voltage 60°(angle error ≤ 3°).
Otherwise, check the device of AC module connection.
Input three-phase symmetry voltage 50V, and rated current only to phase A which lags phase A
voltage 60°, observe the display of amplitude and angle of 3I0 which must be the same as IA,
otherwise, check the device of AC module connection.
The test is performed according to the method simulating sudden faults. Before
simulating faults near bus, the rated voltage must be given at first, and fault current is I,
fault lasts 100-150ms.
Input settings according to the setting advice note or typical settings and write them
to certain zone at first. Then make tests according to Tab.14.
Tab.14
Relay Fault type Fault analog quantities Operation Remark
Simulate A, B, C to I=m*I0n Reliable Only enable
Zero-s ground m=0.95 non-operation stage 1 and
equen instantaneous m=1.05 Reliable operation the other
cs fault, the lasting m=1.2 For stage 1 stage
current time of simulated tdz≤30ms. Zero-sequen
directio fault must be For nd, 3rd, and 4th cs current
nal larger than the stage, error between relay. n=1, 2,
relay longest setting tdz and settings 3, 4 means
time among every ≤20ms or ±2% 2nd, 3rd, and
stage 4th stage
Zero-sequencs respectively.
current protection.
U=50V
-95-
CSC-101 EHV Transmission Line Protection Equipment Manual
Tab.14 (continued)
Relay Fault type Fault analog Operation Remark
quantities
Distan Simulate A, B, C to U=m*I* Xn_pe Note: enable
ce ground (1+KX) Reliable operation zone 1, 2 or 3
relay instantaneous m=0.95 Reliable of distance
fault, check zone m=1.05 non-operation relay
1, 2, and 3 of m=0.7 For zone 1 respectively, in
ground distance (RD=0) tdz≤30ms. For zone the equation,
relay, mentioned in 2 and 3, error n=1, 2, 3, KX
note (d) (I=In) between tdz and the is residual
settings ≤20ms compensation
Simulate AB, BC, U=m*I*Xn_pp coefficient of
CA (RX=0) Reliable operation reactance
phase-to-phase m=0.95 Reliable component.
instantaneous m=1.05 non-operation Xn_pe and RD
fault, check zone m=0.7 For zone 1 are the
1, 2, and 3 of tdz≤30ms. For zone reactance and
ph-to-ph distance 2 and 3, error resistance
relay, (I=In) between tdz and the settings of
settings ≤20ms ground
distance relay.
Xn_pp and RX
are the
reactance and
resistance
settings of
phase-to-phas
e distance
relay.
Note:a)the fault current I for testing must be larger than 0.2In while fault voltage is not less than
threshold value.
U
b) calculation formula for single-phase-to-ground distance relay : X_ pe
I KX 3I 0
-96-
CSC-101 EHV Transmission Line Protection Equipment Manual
, R _ pe
(=90°)
U (=0°).
I KR * 3I 0
c) calculation formula for phase-to-phase distance relay:X U (=90°)
,R U
I I
(=0°);
d) For testing ground distance relay, if the employed relay-testing instrument has
compensation coefficient KX and KR, input their values according to the actual settings.
If the relay-testing instrument just provides compensation coefficient KL=(Z0-Z1)/3Z1,
need the testing worker to input the real part and imaginary part of KL which are different
from KR and KX of the relay settings, all the compensation coefficient of the testing
instrument and the relay can be set to ―0‖, or that of the testing instrument is calculated
according to the actual parameters. The following method for testing is just to be referred:
If the relay settings KX≠KR, set the relay setting KX and KR to ―0‖, and set the testing
instrument KL to Re=0 and Im=0. If the relay settings KX=KR, set the testing instrument
KL to Re=KX and Im=0, or set the relay settings KX and KR to ―0‖, the testing instrument
KL to Re=0 and Im=0.
The resoled formula: KX=(X0 -X1 )/3X1,KR=(R0 -R1 )/3R1,Z0=R0 +jX0,Z1= R1 +jX1,
KL=(Z0 -Z1)/3Z1,KL=(Re,Im).
If the relay-testing instrument does not provide the compensation coefficient, set the
relay settings KX and KR all to ―0‖.
e) The error of operation value is each substancia l measure value-setting value 100% .
setting value
The following items are only provided to be referred. Users should formulate the
corresponding rules for maintenance and operation according to the actual
situation in locale.
a) Check the setting lists inerrably, and then turn on DC power supply. Now the
green light - LED <Run> on panel is lit, the green light - LED <Recharge> is lit,
other lights are extinguished. Under normal conditions, LCD display on loop
―year-month-day, hour: minute: second, magnitude and phasor angle of analog
quantities, channel state, current setting zone: 00. autoreclose mode,
synchronization check mode, charging finished. Press 《SET》 to display main
menu. Press one or several times 《QUIT》 ,exit current menu one times or step
by step to return normal state of display. Then re-check the clock by turning off
DC power and then on.
b) Connect currents (load current must be larger than 0.1In) and voltages to the
device, under normal state of loop display, press SET to enter into main menu,
then enter into every sub-menu to check whether the polarity and the phase
sequence of each analog input are correct or not. Verify the sampled data of the
protection in accordance with the actual ones.
c) Check the protection settings. Print each set of settings that are possibly
-97-
CSC-101 EHV Transmission Line Protection Equipment Manual
employed in the actual operating modes, in order to check them with informed
sheet of setting and backup debugging notes.
d) Note that carrier channel is perfect.
e) Check the digital inputs in accord with the practical state, and make note.
Especially notice that there is not display of ―small hand‖ on the upper right of
LCD under normal conditions (that means test relay).
-98-
CSC-101 EHV Transmission Line Protection Equipment Manual
8. Maintenance
8.1 Routine checks
• Measure resistance in turn between analog circuits and ground;
• Measure output voltage in every class;
• Check printer;
• Revise zero draft and scale;
• Verify alarm circuit;
• Verify binary input;
• Actual live tripping including circuit breaker;
• Check setting。
8.2 Replacing the back-up battery
• Battery is used to store data, record fault and inner clock in case the power is
off.
• Battery is checked up timing, it will send out alarm after it is invalid or decline.
• The back-up battery should be replaced at the latest after 10 years of
operation or after alarm signal was sent out.
• Recommended battery: Lithium battery CR1/2A, 3V/1Ah.
8.3 Fault tracing
The equipment may test all hardware components itself, including loop out of
the relay coil, Watch can find whether or not the equipment is in fault through
warning lights and warning characters which shows in liquid crystal display and
print reports to tell fault location and kind.
The method of eliminate fault is replacing fault board or eliminate external
fault.
8.4 Repairs
• Users should not change modules circuit or backboard circuit in repair.
• It‘s appropriate to change power board when power supply is fault.
• It‘s suggested that power board should purchased per 4 or 6 years because it
can‘t storage for a long time.
8.5 The notices during operation
a) During operation, nobody is allowed to touch the live parts of the device,
insert or pull out the plug-in unit, press the keyboard on the panel optionally, and
operate the following commands: output driving, modify setting, solidify setting,
setup system and change the device address in the communication network etc.
b) If all the relays of the device are to be quitted from operation, open the
tripping strap at first, and then turn off the DC power. If one of the relays is to be
quitted during operation, only the corresponding strap of the relay needs to be
quitted.
c) When fault occurs during operation, if the protection operates to trip, the
corresponding LED of tripping signal is lit and MMI displays the newest operating
report. If autoreclosing operates to reclose, the ―reclose‖ LED is lit. The operating
report, record report should be printed automatically and the detail notes must be
-99-
CSC-101 EHV Transmission Line Protection Equipment Manual
written down.
d) If the DC power supply disappears during operation, quit the tripping strap at
first.
e) If alarmⅠ occurs during operation, the corresponding relay should be stop
employing, record the alarm message and inform the operator in charge of the
protection. Here, prohibit pressing the reset button. If alarm Ⅱ occurs, record the
alarm message and inform the operator in charge of the protection to analyze and
handle it.
8.6 Manipulation after replacing software or CPU
the following steps should be conformed after replacing software or CPU:
a) Firstly, check address jumper to be right on CPU board, input and write
setting.
b) Check the software version of CPU and CRC.
c) If ―Setting Err‖ or ―Set Group Err‖, ought to write settings again and switch
setting zone.
d) Check zero drift and calibration one time, and test I/O again.
e) According to the local operating rules, other related tests ought to be made
by operator.
8.7 Manipulation after replacing software or MASTER module
a) Version of the former MASTER module and version of software
b) Communication parameters, protocol option etc.
c) Address of the device.
d) View whether normal display is right or not after the device is electrified;
practically operate report and record print.
8.8 Manipulation after replacing input or output module
If input or output module needs to be replaced, firstly check whether the jumper
about module address is right or not. The replaced module cannot be put into
operation until its input or output is checked normally.
8.9 Manipulation after replacing AC module
When AC module has been replaced, the validity of polarity must be checked.
8.10 Several illuminations
a) If the function of autoreclose is not disenabled, it is treated as ―AR_exit
Mode‖, and LED of charging is extinguished. If autoreclose mode is not set,
―autoreclose mode: No Check‖ is displayed on panel, that is, it is treated as No
Check to reclose.
b) There are testing ports on the top left corner of backboard, and 24V, 5V and
interface of CAN net are connected to be employed by auto-testing.
c) There are three methods to input settings:(1) Use keyboard on panel, (2)
employ software tool of CSPC, (3) by automatical system.
d) Method to select running setting zone:Use the shortcut key on the bottom
left panel ―+‖, ―-‖ to select or switch setting zone.
e) There are two methods to use printer:
(1) Connect printer directly to the print series ports of the device(use special
-100-
CSC-101 EHV Transmission Line Protection Equipment Manual
-101-
CSC-101 EHV Transmission Line Protection Equipment Manual
9. Storage
• Although protection equipments are generally of robust construction, they require
a careful treatment prior to installation on site, since they must be carefully packed
and unpacked, without applying any force to the equipment and using suitable tools.
Once supplied, the equipment must be thoroughly inspected to ensure that they
have not undergone shipping damages. If the equipment are not immediately
installed upon reception, they must be stored in places free from dust and moisture,
causticity in their original packing.
• Storage temperature: -10°C + 40°C.
• the equipment must only be stored and carried in the special antistatic bag.
-102-
CSC-101 EHV Transmission Line Protection Equipment Manual
10.Ordering
10.1 Selection and ordering data
-103-
CSC-101 EHV Transmission Line Protection Equipment Manual
11.Appendix
1 2 3 4 5 6 7 8 9 10
A A
10/100M BASE-T
B 6 CB OPEN B-PHASE RELAY TEST 232-GND B
100M BASE-FX
8 CB OPEN C-PHASE RESET 485-2B 5 3 IC'(CT OUT) IC(CT IN)
10 CAR RECV(DIST) 485-2A 6
7 4 IN'(CT OUT) IN(CT IN)
12 START CBF A-PH 485-1B
14 BB/CBF OPTD START CBF B-PH 485-1A 8 5 IN'(MUTUAL)IN(MUTUAL)
16 START CBF C-PH GPS 9
10 6
18 START CBF 3-PH GPSGND
C C
20 CARR FAIL(DIST)1PH TRIP ENABLE LON-2A 11 7 UX' UX
22 A/R BLOCK LON-2B 12
13
A
RX 8
24 CAR RECV(DEF) CLOSE SWITCH LONGND A A
26 CARR FAIL(DEF) LON-1A 14 TX 9 UC UB
B
28 DC- INPUT R24V- INPUT LON-1B 15 RX
B
B
TX 10 UN UA
30 DI1 NOT USED 16
D 11 D
32 DI2 DI SET G3
Note: If input power is employed 220V/110V, connect terminals X4- c2 with input positive power, X4- c28 with negative power.
签字
质量
H 设计 校核 标准化 图样标记 (g)
型号 CSC-101B 背板端子图 F0SF.391.300(ER) H
日期 北京四方继保自动化有限公司
标记 处数 文件号 签字 日期 日期 会签 审定 O 所属装配 BD2012005 比例 第 1 张 共 1 张
1 2 3 4 5 -104- 6 7 8 9 10
CSC-101 EHV Transmission Line Protection Equipment Manual
c
UA
*
b UB
*
a UC
*
c
*
b
*
a X1 AC
b a
IA ’ 1 IA
IB ’ 2 IB
*
IC ’ 3 IC
IN ’ 4 IN
5
6
UX ’ 7 UX
8
UC 9 UB
UN 10 UA
11
*
-105-
TA1 TV12 ZC
0 0
IA ia UA ua
a1
1* *3 1* *3
b1
c1
a2
b2
c2
a3
b3
IA' 2 4 2 4
c3
uc
a4
ub
b4
ua
c4
a5
b5
TA2 TV11 u0
c5
0 0 ia
IB ib UB ub a6
ib
1* *3 1* *3 b6
ic
c6
in
a7
b7
ux
C Introduction of analog
c7
Note: TV9 has been canceled.
a8
b8
IB' 2 4 2 4 c8
a9
b9
c9
a10
b 10
TA3 TV10 c10
IC 0 ic UC 0 uc
1* *3 1* *3
-106-
XC
IA' IA
b1 a1
IB' IB
b2 a2
CSC-101 EHV Transmission Line Protection Equipment
IC' 2 4 UN 2 4
IC' IC
b3 a3
IN' IN
b4 a4
b5 a5
TA4
TV9 TV6
IN' 0 in 0 b6 a6
U0 u0 UX 0 ux
1* *3
1* *3 1* *3 UX' UX
b7 a7
U0 ' U0
b8 a8
UC UB
b9 a9
UN UA
IN 2 4 b 10 a10
U0 ' 2 4 UX' 2 4
b 11 a11
Manual
CSC-101 EHV Transmission Line Protection Equipment Manual
TX
TX
RX
RX
FPGA
FPGA
双CAN
FLASH
SRAM
SCC
CPU
E PROM
2
WATCHDOG
16路AD
-107-
CSC-101 EHV Transmission Line Protection Equipment Manual
-108-
Address:Building 9,Fourth Avenue,Shangdi Information Industry Base,Haidian
District, Beijing
Zip:100085
Tel : +8610-62961515 +8610-62985012 ( Marketing Department )
+8610-62986668(Technical Support)
Fax:+8610-62981004 +8610-62978952(Marketing Department)
http://www.sf-auto.com E-mail: webinfo@sf-auto.com