Item Unit Qty Rate Amount Requirements
Item Unit Qty Rate Amount Requirements
Labour
Structure
Mobilisation Of Labour 50,000
Chiseling 150,000
Setting Out 100,000
Brick Work (Plinth Wall) 1,000,000
Steel Work 650,000
Carpentry work (Shuttering) 350,000
Concrete Work 850,000
Total Amount 3,150,000
FINISHES
Undercoat (20 Litre) Tins 7 70,000 490,000
Vinyl emulsion paint (20 Litre) Tins 3 280,000 840,000
Gloss oil paint (4Litre) Tins 4 60,000 240,000
Weatherguard emulsion paint (20 Litre) Tins 1 280,000 280,000
Mat (Ceiling Paint) Tins 1 280,000 280,000
White gloss paint Tins 3 60,000 180,000
Labour for Painting 1,500,000
TOTAL 3,810,000
ROOFING
Description of Works Unit Qty Rate Amount
Eco Tile Roofing Sheets no 42 68,000 2,856,000
Ridges no 15 20,000 300,000
Hoop Iron Pcs 3 35,000 105,000
6'' x 2'' Timber pcs 30 12,000 360,000
4'' x 2'' timber pcs 250 6,000 1,500,000
4'' x 3'' timber pcs 20 8,000 160,000
2'' x 3'' timber pcs 50 4,500 225,000
12'' x 1'' fascia board pcs 10 22,000 220,000
WOODEN DOORS
Door overall size 900 x 2400mm Pcs 2 450,000 900,000
Door overall size 750 x 2100mm Pcs 2 350000 700000
WINDOWS
Window pv W1overall size 1800 x 1500mPcs 2 650,000 1,300,000
Window W6 overall size 600 x 900mm Pcs 1 250,000 250,000
Labour for Fitting above LUMP SUM 100,000
TOTAL 4,250,000
DESCRIPTION UNIT QTY RATE AMOUNT
ELECTRICAL INSTALLATIONS
Load wire (16mm) Set 1 120,000 120,000
Main Switch 4 way main switch Pcs 1 120,000 120,000
Light Duty pipes Bundles 1 150,000 150,000
Insulating tape Pcs 2 3,000 6,000
Pendant lamp Holders Pcs 5 7,000 35,000
32" pipes Pcs 2 10,000 20,000
2.5mm (Single Cables) 3 Rolls 1 285,000 285,000
1.5mm Single cable wire Rolls 2 240,000 480,000
Labour 1,200,000
TOTAL 2,855,000