SE SA INFRASTRUCTURE eae
OAV wots
Ref:SAICPL/Bharatmala/Spur/Delhi-Vadodara/2021// 23.62 08-04-2021
To,
THE PROJECT DIRECTOR,
National Highways Authority of India,
Project Implementation Unit,
87, Ganga Vihar Colony,
Behind Rawat Palace Hotel,
Dausa ~ 303303, Rajasthan.
Subject: Consultancy Services to carry out Detailed Technical Assessment of the corridors to
identify issues impacting the efficiency of the corridors and its design solutions-Spur Joining
Delhi-Vadodara Expressway to Jaipur ~ “Request for providing GTS Bench Mark” Reg.
Dear Sir,
With reference to above stated subject, Detailed Topographical Survey (UAV/Drone)
team already instructed to be mobilized to site. In order to carrying out topographical survey
for ground information/Features including (X.Y,Z), GTS bench mark (established by survey
of India) is required for datum establishment.
Kindly provide the GTS Bench mark (Already Delhi-Vadodara Expressway in advanced
stage, so they had GTS).
In case not available you are requested to write a forwarding letter to Survey of India,
Dehradun to get the same. Once received GTS bench mark, survey shall be connected to GTS
bench mark. This is for your kind information and necessary action.
‘Thanking and assuring you our best services at all times.
Yours sincerely,
fe Ge
(K Suresh)
Project Co-ordinator
PAL Rt)