You are on page 1of 10

Revision:00

Inspection Frequency : Monthly

Hand Tool Inspection Check list


Department Name:_______________ Insp Date:___________
Inspected By:_________________ Due Date:___________

Machanical Tools/Workshop Tools.


Adjustable
Insp. Checks Spanner Set Pipe Range Star L-Key Set Silicon Gun Star Set Hammer Hand Leveller Chisel Hack-saw
Spanner Set

Make sure there is/are no damage or cracks in equipment


No Sharp edges on operating side/handles
Joint parts are not loose

Electrical Tools
Screw Driver
Insp. Checks Pliers Cutter Pliers Nose Pliers Set Multimeter Current Meter

Make sure there is/are no damage in equipment.


Make sure no damage or crack on insulation and insulation is
clean.
Tools are rated for 1000v
No damage sign of grinding tip or edges

Note:
If above checks are OK then mark
If above check are NOK then mark

Conclusion :_____________________________________________________________________________________________________________________________________________________________

Inspected by :________________________ HSE :___________________


Inspection Frequency : Monthly Revision:00

Baby Grinder Machine Check list

Department Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No Insp. Check Ok/Nok Comment

1 No physical damage or crack on body, wire or push botton

2 Tool properly insulated and secured & no cut on wire.

3 No hole in receptacle.
4 Cable properly connected with receptacle & receptacle seal present.

5 No signs of overheating or looseness on receptacle and its pins

6 Movable parts are properly fixed.


7 Safeguard is in placed.
8 Push botton is in working condition.
9 Make sure disc edges aren't worn out / broken
10

Conclusion :_______________________________________________________________________

_______________________ _______________________
Inspected By HSE
Inspection Frequency: Monthly Revision:00

Hilti Machine Check list

Company Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No DESCRIPTION Ok Nok

1 Make sure there's no physical damage or crack on body, wire or push botton.

2 Make sure that tool is properly insulated and secured & no cut on wire.

3 Make sure there's no hole in receptacle connection.


4 Make sure cable is properly connect in receptacle & receptacle seal is present.

5 Make sure there are no signs of overheating or looseness on receptacle and its pins

6 All movable parts should be properly fitted.


7 Push botton is in working condition.

8 No signs of hammering on head & tightening key is available.


9
10

Conclusion :________________________________________________________________________________________

_______________________ _______________________
Inspected by HS&E
Inspection Frequency: Monthly Revision:00

Power Cutter Check list

Department Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No DESCRIPTION Ok Nok

1 Make sure there's no physical damage or crack on body, wire or push botton

2 Make sure that tool is properly insulated and secured & no cut on wire

3 Make sure no hole in receptacle connection


4 Make sure cable is properly connect in receptacle & receptacle seal present.

5 Make sure there are no signs of overheating or looseness on receptacle and its pins

6 All movable parts should be properly fitted.


7 Are the safeguards in place on that tool.
8 Handle is in working condition.
9 Make sure pipe vice is in working condition
10

Conclusion :_______________________________________________________________________________________________

_______________________ _______________________
Inspected by HSE
Inspection Frequency: Monthly Revision:00
Inspection Frequency: Monthly Revision:00

Welding Plant Check list

Department Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No DESCRIPTION Ok Nok

1 Make sure there's no physical damage on the body.

2 Make sure that tool & cable is properly insulated and secured with no cut on cables.

3 Make sure no there's no hole in receptacle connection

4 Make sure cable is properly connected in receptacle & receptacle seal is present.

5 Make sure there are no signs of overheating or looseness on receptacle and its pins
Before use of the equipment make sure there's no loosness in cable terminal contact
6 (espcially welding holder and earthing)
Equipment must be in good working condition (with parts such as tyres, handle
7 ,switches, LED, regulator in working condition)
8 Make sure all holders have sleeves present and are in good condition.
9 Make sure earthing clamp is present
10

Conclusion: __________________________________________________________________________________________

_______________________ _______________________
Inspected by HSE
Revision :00
Inspection Frequency: Monthly

Pasetal Machine Check list

Department Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No DESCRIPTION Ok Nok

1 Make sure there's no physical damage or crack on body, wire or push botton.

2 Make sure that tool is properly insulated and secured.

3 Make sure there's no hole in receptacle connection


4 Make sure cable is properly connected in receptacle & receptacle seal is present.

5 Make sure there are no signs of overheating or looseness on receptacle and its pins

6 All attached moveable parts should be proper fitted.


7 Are all the fixed safeguards in place on the tool.
8 Emergency switch is working.
9 Adjustment lever is securely attached and base plate is not broken
10 Make sure lowering handle rotates to lower chuck assembly 
11 Bonding of motor and equipment are attached with ground

Conclusion: _______________________________________________________________________

_______________________ _______________________
Inspected by HSE
Inspection Frequency: Monthly Revision :00

Drill Machine Check list

Department Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No DESCRIPTION Ok Nok

1 Make sure the no physical damage or crack on body, wire or push botton.

2 Make sure that cable is properly insulated and secured.

3 Make sure there's no hole in receptacle connection


4 Make sure cable is properly connected in receptacle & receptacle seal is present.
Make sure there are no signs of overheating or looseness on receptacle and its
5 pins

6 All moveable parts should be proper fitted.


7 Push botton is in working condition

8 Make sure ground cable is available and attached with the tool.

9 No signs of hammering on head & tightening key is available.


10

Conclusion: _______________________________________________________________________

_______________________ _______________________
Inspected by HSE
Inspection Frequency: Monthly Revision :00

Extension Board Check list

Department Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No DESCRIPTION Ok Nok

1 Make sure there's no physical damage on body

The power distribution box has been connected with earthing device
2 (ELCB breaker)

3 Make sure that tools are properly insulated and secured.


4 On/off switches is in proper condition

Check ELCB live test with pressing test button( if breaker trip then its
5 OK if its doesnt trip then it is faulty.

Make sure there are no signs of overheating or looseness on


6 receptacle and its pins

7 Make sure all socket outlets on the switchboard secured /protected.

8 Make sure all cable connections are proper fixed with cable lugs.

9 Make sure every receptacle has its own breaker.

10

Conclusion:______________________________________________________________________________-

_______________________ _______________________
Inspected by HSE
Inspection Frequency: Monthly Revision: 00

Extension Lead Check list

Department Name:________________ Insp Date:_______________


Inspected By:________________ Due Date:_______________

S.No DESCRIPTION Ok Nok

1 Make sure the no physical damage on cable insulation

2 Make sure no hole in receptacle connection.

3 Receptacle pins are not overheated or loose.


4 Make sure cable is properly connected in receptacle.

Make sure temporary cable is not installated for more than


5 30-days
Make sure date of installation is attahced with temporary
6 cable.

7
8
9
10

Conclusion:_________________________________________________________________________

_______________________ _______________________
Inspected by HSE