Date: Sep.

07, 2019
REQUEST FOR QUOTATION (RFQ) RFQ Ref. No. MSTP-RFQ-SUB-007 Rev.0
Job No: SS-2474
Page: 1 of 2

STATEMENT OF REQUIREMENTS

1.0 Background
Samsung had built steam plant at Ma’aden Aluminium and plant is running for more than 3yrs now.
As a part of warranty; Samsung is planning to do some repair works at Absorber Unit 1/2/3 & 4 of boiler package.
This repair work shall be executed during planned shutdown work.

2.0 Brief Description of Work

2.1.1 To Supply and erect tower scaffolding for the following area:
a. Absorber #1 ~ 4m (L) x 4m (W) x 24m (H)
b. Absorber #2 ~ 4m (L) x 4m (W) x 24m (H)
c. Absorber #3 ~ 4m (L) x 4m (W) x 24m (H)
d. Absorber #4 ~ 4m (L) x 4m (W) x 24m (H)
e. Scaffold safety access
f. Scaffold barricade

2.1.2 Dismantle tower scaffolding after completion of repair by Samsung.

3.0 Location of Work


Ma’aden Steam Plant, Ma’aden Aluminium Complex Ras Al-Khair, KSA

4.0 Commencement & Completion


***TBD

5.0 Detailed Scope of Work


The following are the services are to be provided:
• GENERAL
5.1 Supply of highly competent personnel required for the work including prequalification activities.
5.2 Sub-contractor to Provide Food, Accommodation & Transportation.
5.3 Supply of personal protective equipment (PPE, tools, and consumables as per Ma’aden Safety Standards)
5.4 To provide good lighting and air ventilation for a confined space work.
5.5 To provide safe access/ temporary working platform (Internal & External Scaffold)
5.6 Housekeeping and disposal of scrap/waste materials to Owner’s designated area.
5.7 Preparation of Work Procedure and scaffold design.
5.8 Submit related documents of their personnel to Samsung for gate pass applications.
5.9 Submit Safety Plan (Working at Heights, Confined space, etc...)
5.10 Submit manpower plan
Date: Sep. 07, 2019
RFQ Ref. No. MSTP-RFQ-SUB-007 Rev.0
Job No: SS-2474
Page: 2 of 2

6.0 Terms & Conditions


Terms & Condition shall be mutually discussed and agreed prior to finalization of order

7.0 Scaffolding Requirement

Volume Volume
No Item Size Description Qty Unit Remarks
(1 Unit) (4 unit)

-Internal Scaffold
(Confined Space)
1 Tower Scaffolding 4m (L) x 4m (W) x 24m (H) 4 EA 384 m3 1,536 m3 -30days duration
-One unit at a time as
per shutdown schedule

Scaffold Safe -External Scaffold


2 As per site condition 4 EA 4EA 16EA
Access -30days duration

Tower Scaffolding -Internal Scaffold


3 As per site condition 1 EA 1EA 4EA
(Elbow Pipe) -30days duration

-Internal Scaffold
4 Scaffold Barricade As per site condition 1 EA 1EA 4EA
-30days duration

8.0 Direct Manpower Requirements

No Category Remarks

1 Scaffolding Supervisor With 3rd Party Certification

2 Scaffolding Foreman With 3rd Party Certification

3 Scaffolders With 3rd Party Certification

4 Scaffolding Inspector With 3rd Party Certification

9.0 Scaffolding Design Requirement

-Before commencement of any scaffolding activity inside Maaden Facility, Contractor has to submit Scaffolding
design for Maaden review and approval, Specifically for Absorber Unit (Internal Scaffolding) in Refinery Steam
Plant.