BIM KNOWLEDGE

Contents APPLICATION OF 5D BIM

CUBICOST INTRODUCTION
BIM KNOWLEGDE
01
• What is BIM?
• BIM Project Life Cycle
• BIM Level of Development
• Barrier Ahead
• BIM Benefits
What is BIM?
“BIM is a digital representation of the building process to facilitate
exchange and interoperability of information in digital format”

“BIM digitalizing construction industry” – Mohd Harris Ismail (2017)

• Representation : before it’s even built


• Process : not just 3d model, but also the work flow
• Exchange : input from all the stakeholder (developer, consultant, main con, and sub con)
• Interoperability : where one file can interact to another software
• Digital : with computer and paperless
BIM Dimensions

https://centrelinestudio.com/bim-standards/
https://blog.drawbotics.com/2018/11/07/the-
bim-revolution-in-building-management/
BIM Project Life Cycle
The Barrier Ahead

1 POOR LEADERSHIP
Lack of support and involvement from top management.
Unclear of digital strategy and implementation plan
throughout the organisation 4 UNPLANNED EXPENSES
Other expenditure take precedence over digital investment.
2 ORGANISATIONAL SILOS Struggle to establish clear return on digital investment (ROI)
Communication and integration within the organisation is still
very low. Ineffective data-driven decision making
5 LACK OF EXPERTISE / KNOWLEDGE
Employees are not open to transform and upgrade their
3 LOSS AVERSION BIAS competency. Lack of internal technical know-how and
Most common bias for organisation to transform due to resources
inability to foresee prospect gain and long-term benefit.
Resistance to change
6 LACK OF AWARENESS
Inability to see available technology that can improve
productivity and efficiency. Management do not have full
visibility of digital transformation
BIM Benefits

Improve satisfaction via new


experience, empowerment,
value management
Risk management,
increase productivity and 4 Information sharing, data-
efficiency, maintain based decision making,
reputation
3 reporting, monitoring

CUSTOMER Data-rich models, improve


EXPECTATION
5 facility operations and
ENHANCE maintenance, efficient data
QUALITY AND
Accuracy in measurement,
2 SAFETY COLLABORATION AND interoperability

reduce cost, increase CONCERNS COMMUNICATION


profitability, long-term saving
6
PROJECT PROJECT
VISUALISATION HANDOVER
New service to client, increase
value, competency, return on
investment
1
Model-based approach in NEW BUSINESS
design, cost estimation, COST OPPORTUNITIES 7
implementation, coordination EFFECTIVE
ADVANTAGES
APPLICATION
02 5D BIM OF
Glodon Digital Building Panorama

Design Construction Maintenance

Digital Enterprise-level BIMFace


Platform
Project level Gsite

Engineering Cost Planning Safety Quality Drawing Mgt


Application
System MagiCAD Cloud Technical Method Cubicost Schedule Smart Helmet Qualify Control GEPS Smart Building

MagiCAD Site Layout TAS Zebra Check CAD Reader


Individual -Plan
Tools
BIMMake Site Logistic TRB AR/VR Mozi Differ

Formwork TME

Scaffold TBQ

E-tender
©Glodon Company Limited
Manual Construction
Takeoff
2D DRAWING CALCULATION SUMMARY SHEET QUANTITY
SHEET

• PDF • STRUCUTRAL • CONCRETE AND • STRUCTURAL


• CAD MODEL FORMWORK • ARCHITECTURAL
• ARCHITECTURAL RULES
• BLUEPRINT
MODEL (DEDUCTION)
• INCLUDE RULES • REINFORCEMENT
RULES

Digital Construction
Takeoff
2D DRAWING MODEL RULES QUANTITY

• PDF • STRUCUTRAL • CONCRETE AND • STRUCTURAL


• CAD MODEL FORMWORK • ARCHITECTURAL
• ARCHITECTURAL RULES
• BLUEPRINT
MODEL (DEDUCTION)
• REINFORCEMENT
RULES
Manual Construction Takeoff
Manual Construction Takeoff
Main Pain of Manual Calculation
INADEQUATE MANUAL INPUT
SOFTWARE AND
TOOLS MEASUREMENT

DEADLINES
LACK OF
TO MEET
TIME

NO
HUMAN COLLABORATION
EROR FOR
ALL STAGES
Cubicost 5D BIM Cost Solution

TRB for reinforcement bar TAS for architecture and TME for Mechanical &
works structure Electrical

©Glodon Company Limited


CUBICOST
03 INTRODUCTION
Glodon’s Cubicost
Intelligent modelling

More than Embedded with SMM


Auto deduction
Auto calculation
More
Intelligent Smart tender evaluation
and more…

New Features &


Enhancements

Revit / IFC model import


More More
Establish the interoperability Interconnected Visual
Interactive 3D model
Resource Library Reversely check model
Electronic tendering Customizable reports
and more… and more…
Cubicost: TAS & TRB

Indonesian • Quick, Efficient, and Intelligent Quantity


Measure for Architectural and Structural Works
Standard Method of Measurement
of Building works • Variety of Built-in and Customisable Quantity
Reports
• Support Revit and IFC Format
• Interactive 3D Model
• Built-in Standard Measurement Rules

Standard Method Design Standards


Measurement
Cubicost’s Easy Step
Layout Plan From Cad/DWG
List of
Element
(Ex. Column
list)

2D Drawing 3D Modeling Build Up


Based on 2D Drawing Reference
Deduction Factor
Client’s Success Story
20%
67% Save of their time
Increase in confidence
about calculations 2X
Increase productivity
54% CONSULTANT
1/2
CONTRACTOR
More time for higher value
tasks Reduce team size per
project
72% “Prior to Cubicost, we needed 10
people working on the project for one
“Since the software takes care of time Less time checking
week. Now, with Cubicost, we only
consuming works, it saved my time to measurement need half the people, and half the
do other more high value tasks.
time, that’s just how good it is. We
Instead of checking for measurements,
love the software and we are quite
I have the chance to negotiate prices
happy to see the results.”
with the sub-contractor with a more
competitive cost. In general, we are
able to complete tenders faster, and
submit more tenders.”
Client’s Success Story

30%
Increase productivity
CONTRACTOR
70%
Improve work efficiency

“3D modeling allows my team to spot errors and avoid mistakes. It is much easier to
visualize objects in 3D as opposed to replying off of measurements from Excel.”

“Once my team started using Glodon’s product, they didn’t want to go back to Excel!”

“A team that enjoys work-life balance is happier when they come in to work, which in turn
creates a positive social environment everyday.”
Glodon Partnership
Contractor
We are trusted by contractors of many sizes nationwide, including
Glodon Partnership
Developer
We are trusted by developers of many sizes nationwide, including
Glodon Partnership

Consultant
We are trusted by consultants of many sizes nationwide, including
Glodon Partnership

Government & University


We are trusted by the government and universities nationwide, including
Project References
Project References
Project References
THANK YOU
Silviana Tanudjaja
Senior Service Consultant
silviana.Tanudjaja@global.glodon.com
62818 0792 4984

©Glodon Company Limited

You might also like