You are on page 1of 6

VCEEngine

http://www.vceengine.com
Use our Vce Test Engine to experience Simulated Practice Test for Sure Pass
Instant Download - Best Exam Practice Material - 100% Money Back Guarantee!
IT Certification Guaranteed, The Easy Way!

Exam : C_TPLM40_65

Title : SAP Certified Application


Associate - Quality
Management with SAP ERP
6.0 EHP5

Vendor : SAP

Version : DEMO

1
Get Latest & Valid c_tplm40_65 Exam's Question and Answers from Vceengine.com. 1
https://www.vceengine.com/C_TPLM40_65-vce-test-engine.html
Instant Download - Best Exam Practice Material - 100% Money Back Guarantee!
IT Certification Guaranteed, The Easy Way!

NO.1 If the usage decision has been made for an inspection lot, an additional inspection lot cannot
be created for a production version.
A. Correct
B. Incorrect
Answer: B

NO.2 Only internal problems can be processed using quality notifications


A. Correct
B. Incorrect
Answer: B

NO.3 Results' recording is possible over the Internet.


A. Correct
B. Incorrect
Answer: A

NO.4 Which statements are correct Returns and Complaints Processing? (More than one answers
are true)
A. The complaint can be represented in a quality notification.
B. If goods are returned, an inspection can be performed at their receipt
C. Different follow-up functions can take place, depending on the result of the inspection.
D. All of the functions of the quality notification are available.
Answer: ABC

NO.5 An inspection characteristic describes the inspection criteri


a.
A. Incorrect
B. Correct
Answer: B

NO.6 Which are related to "Function group QMLR"? Which statements are correct? (More than one
answers are true)
A. Create/edit a return delivery
B. Assign purchasing document
C. Create a new quality notification including the items
D. Performing stock postings
E. Assign vendor
Answer: ADE

NO.7 If there are inspection specifications from both the variant configuration and the task list or
material specification that are relevant for the characteristic, the specifications from the variant
configuration take precedence over those from the material specification.
A. Correct

2
Get Latest & Valid c_tplm40_65 Exam's Question and Answers from Vceengine.com. 2
https://www.vceengine.com/C_TPLM40_65-vce-test-engine.html
Instant Download - Best Exam Practice Material - 100% Money Back Guarantee!
IT Certification Guaranteed, The Easy Way!

B. Incorrect
Answer: A

NO.8 You can use quality notifications in all areas of the logistics supply chain.
A. Correct
B. Incorrect
Answer: B

NO.9 Sampling plan dependent on: which statements are correct?


A. Inspection
B. Variable
C. Lot size intervals
D. Severties/AQL value
Answer: A,C,D

NO.10 Which statements are correct? (More than one answers are true)
A. You cannot record costs and track capacity load utilization in the order.
B. You can use a relevant follow-up action to change the equipment status.
C. You can record results for each item of test equipment (by unit to be inspected).
D. You can also run control charts for equipment or functional locations.
Answer: BCD

NO.11 You can use the Quality Notifications to support the RMA (Return Material Authorization)
process in your company
A. Correct
B. Incorrect
Answer: B

NO.12 Which Quality notifications origin Q1 belongs to


A. none
B. Complaint against a vendor
C. Customer complaint
D. Internal problem notification
Answer: C

NO.13 The life cycle of a control chart are, (More than one answers are true)
A. Creating a control chart for the first inspection lot
B. Creating additional inspection lots, inspection points and inspection results
C. Creating inspection points and recording results
D. Calculating action limits
Answer: ACD

NO.14 Almost all audit management functions are accessible with the help of the HTML GUI and also

3
Get Latest & Valid c_tplm40_65 Exam's Question and Answers from Vceengine.com. 3
https://www.vceengine.com/C_TPLM40_65-vce-test-engine.html
Instant Download - Best Exam Practice Material - 100% Money Back Guarantee!
IT Certification Guaranteed, The Easy Way!

via the Internet or intranet.


A. Correct
B. Incorrect
Answer: B

NO.15 Which statement is correct?


A. Test equipment calibration takes place at multiple unit level (equipment)
B. Test equipment calibration takes place at single unit level (equipment)
Answer: B

NO.16 A notification item consists which of the following elements?


A. Assembly/BA of material item
B. Catalog entry for defect location
C. Number of defects Identified
D. Catalog entry for defect 4pe (defect class)
Answer: B,C,D

NO.17 The inspection types and their process parameters can be assigned to the material in the
material master using the inspection setup in the QM view.
A. Correct
B. Incorrect
Answer: B

NO.18 Which statements are correct? (More than one answers are true)
A. The MPN profile defines how you can work with MPN materials in the procurement process.
B. Stock posting as generally performed in the Quality unit of measure of the material.
C. An manufacturer part number profile (MPN profile) is assigned to an internal material in the
material master.
D. The function group QEVA_ALTOUANTITY_INPUT contains coding that makes it possible to enter
quantities in alternative wells of measure
Answer: A,C

NO.19 Statistical process control: Standardized statistical value for evaluation the quality of an
inspection lot.
The statistical value always has a specific reference criterion (such as a material or the
material/vendor combination.)
A. Incorrect
B. Correct
Answer: A

NO.20 If you change this basic data with the history, the changed data is immediately automatically
updated in the task list, material specification and certificate profile.
A. Incorrect
B. Correct

4
Get Latest & Valid c_tplm40_65 Exam's Question and Answers from Vceengine.com. 4
https://www.vceengine.com/C_TPLM40_65-vce-test-engine.html
Instant Download - Best Exam Practice Material - 100% Money Back Guarantee!
IT Certification Guaranteed, The Easy Way!

Answer: A

5
Get Latest & Valid c_tplm40_65 Exam's Question and Answers from Vceengine.com. 5
https://www.vceengine.com/C_TPLM40_65-vce-test-engine.html

You might also like