You are on page 1of 87
i Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE REGIONAL DIRECTOR REGIONAL OFFICE NO. XI ‘GOV. CHAVEZ ST, DAVAO CITY G.Y. 2020 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR CONSTRUCTION OF CONCRETE ROAD - JCT. R MAGSAYSAY AVE. - L.MA. GUERRERO ST. - SECTION LOCATION t STATION LIMITS (SECTION 1): (SECTION 2): (SECTION 3): (SECTION 4): NET LENGTH (SECTION 1): 5 (SECTION C (SECTION (SECTION NET LENGTH OF PROJECT WIDTH OF ROAD : THICKNESS OF PAVEMENT : ROAD SECTION ID GUZMAN ST. - VINZON ST. - T. PALMA GIL ST. - JCT. DACUDAO - JCT. J.P. CABAGUIO AVE., DAVAO CITY SOBRECAREY ST. - CARMEN ST. - VILLAMOR ST. - VINZON ST. DAVAO CITY STA. 1510+369,000 - STA. 1511+563.766 STA. 15114390.000 - STA. 1511+676.754 STA. 1511+020.000 - STA. 1511+883.443, STA, 15114416.018 - STA. 1512+042.427 1.13458 KM / 2.26916 LANE KM. (RECONSTRUCTION) 0.28675 KM / 0.57350 LANE KM. (WIDENING) 0.86321 KM / 1.72642 LANE KM. (RECONSTRUCTION) 0.60184 KM / 1.20368 LANE KM. (RECONSTRUCTION) 2.88638 KM 10.00 mts. (2 LANES) 280 mm PCCP (LOCAL ROAD) ah baron rund p R 0 A D w A Y GENERAL NOTES {tonne Loe aes So na fcr ot bro) crm sven (om nm he Det Be ML M5 ee arr am wo ne pes oc BSE EES Sree seceamnas naa os 1 fo rector ND Bo BE MO OAT PAE ABBREVIATIONS ssymuent ‘AHEAD STATON ‘A wns xox STATION SSEONEIRG OF ORCULAR CURVE ‘seonen ‘BELOW WEAN SEA LEVEL, BENC-MaRe 80TH SOEs Borrow Roce By BUREAU OF LDS SURVEYORS DBUREAY OF LANDS LOCATION MORUMENT cenreTeR CONCRETE HOLLOW BLOCK aus owns ‘CONCRETE MONUMENT come ouac VETER DECREE OF CURVE DDEPARIVENT OF PUBUC WORKS AND FAGHWAYS: DuPHRAGN stance EATON ERO OF RCULAR CURVE ERO OF PAVEMENT ERINEER EDUATION EXPANSION EXTENSION eERR EXTERNAL EISTANCE / EASTING FPRSHEO PAVEMENT LEVEL Gena HEAD WALL) HH Toe Leva. WATER LEVEL mona INTERSECTION ANGLE INSDE DIAMETER INTERIOR LOMeTER RLOMETER PER HOUR LENORI OF CaRCULAR CLAVE LENGTH OF VERTICAL CURVE wees eres orn NOT APPLICABLE ‘ORGINAL GROUND LEVEL ‘UTSEE OUANETER Parent Peces Pus / ms PONT OF INTERSECTON PONT OF CURVATURE PONT OF VERTICAL CURVE PONT OF VERTICAL TANGENT PONT OF TANGENT ProvecT - PROJECT ROAD sous eFERENCE PONT ENFORCED CONCRETE PPE CULVERT RETANING WALL O10 sou ‘SUARE ‘SQUARE VETER smRAGHT TANGENT STANCE vera wom aac ema TOPOGRAPHIC FEATURES, INFRASTRUCTURE | [TOPOGRAPHIC FEATURES, INFRASTRUCTURE ‘wou _| ABBREWATION | _CESERETON woo | ABBREVATION | —eSORPTON ‘n99R=WATON | OESRPTON . a ee << = rae Trttt | |e name eur or ener — o = oe = a oo care meece || ED i ic [a vse sas or en a = I LL = a J e— = = = eens (-—— na we ner 0 mo rn B om ——_ “a || —=t = al a = ry “enone = = = e = == Sie me ects ay or 2 _ = ‘ea eee ron ‘mene — = @ 5 —— =A aa wear 2 leorracm rn or fa ee cw —e © seta arene re a eer onesie —o— ° ener “nae DRAWING SYMBOLS Tanne saat | Assrewavon | oesem non — @ - =e l og aoe e So =a 8 ~ oun 6 = [romero = = So Caza VICINITY, 10 MAP. ‘SCALE INDEX OF SHEETS Sexe vores sopsevaTions PROTECT LNT LOCATION LAN ‘SUMMARY O QUANTTIES FOR PROPOSED WORK, PAVEMENT DESTGN PARAMETERS ‘Typca. Rosovin CROSS SECTION ‘Cote an GUTTER oeTANs, OROP Guns DETALS, CONCRETE SIDEWALK ‘rm soln Oras FLA DEVAL ‘TPTCAL PAVEMENT HAGKONGS DETALS, TCA ETAL FOR ROAD SIGN POs, ADU WABAING SIS DISTANCE (| ‘TAILS FoR WARK 1D REGULATORY SNS ‘REMOVAL Of CARRLAGEVIAYSE-EDULE,REMDVAL OF CONCRETE SLABS ‘SOIEDULE, REMOVAL OF SDEVALK SEED FLARE SCHEDULE, TRANSITION RAMD/(ARE SCAEDLLE, ROAD SIGS SCHEDULE, ‘REFLECTORUEED iHEROOPLASTIc PAVEMENT RARKINGS SOHEDAE, DESTIN [CROSSING AND STOP sR SEOUL, CUR GUTTER AND SIDEVLK SCHEDULE ‘Fue wanacentent RoGUN SAUCE SILEOARDDETALS, ROAD STCNDETALS [DFORSATORY SIGN SARRUER BOARD DETALS,INFCROATORY BILLBOARD ETALS, LIGHT DETAILS, CONSTRUCTION SHFETY FENCE, TRAFFIC CONE, ‘Tewrorahy 80UA8 DETAL ‘Traprie MaMAcenENT LOOT ‘CONCRETE MUEIOUE FOR 120Une DIA. HOPE, CHS MAMOLE FOR 12000 DIA HORE SHERETE MaeT ON ConceTE MAGAOLE OETA, COMCRETEWE=T ON HB aoe ogra. [CHB MANHOLE WIT TET FOR 36" DIA RCI, MATER IME, OETA. OF STER. ‘Gecing, WASOUE COVER, MANHOLESTES ‘Gang, waseioUE Cove, MseOLe STEPS {CONCRETE MANHOLE WITH TALE FOR" DIA REP, WATERINLET, DETAIL OF Sten Gearing MaeIOU COVER, PuNOLESTEPS Hone gh ost POLYeNNLENE PPE} ohm, 12e0nm IA) POMSTING CONCRETE ABIOLE DETAILS CONTE WAL PL FOR 36°14, ope, COWRETE WAMOLE PEA POR "Ou REE, CONCRETE WAL PAN FO Sr ta mera STEEL GRATING OETA DEINL OF EDGE SPORT, CONNECTION eral aur oerae AOUSTING CH HEMHOLE FOR IA. RRCCETALS ‘SEIO0S OF Pe MSTALATION, CRANAGS SOMNARY OF QUKTITES Pua mre ‘Gross Secon PROJECT Uns son + omer) ~ reser rane ea ad sans er (maker MED BY ‘BEG. OF PROVECT (ce oF sree son) RULER = on —~\ er 2 Fa sacr0 2 (uot) — wom S810" 8 (eo St = RRENRERON sot 4 aa st) ~ REET wom = 2 eee | ee | ed |e | ad s|5| | lolslelalel ucID PAVEMENT (Pocr) 8} 5/5/5/8|6/6\ le| |e) #\8)8)8\8|8| fe fs fe le fe fe fe le le le ele fe ela i fa ae a fa fos fa Js [a fa fe fe fe eg lg ls —— EE ae Se i slslefafelelslelefslelelelelae sla ala aa a tfelolelelele tg po ome we 2046-8) DISPLAY AREA SPALL ON Taogly x 2ccU X 5 ssi hvac) —: ‘ron CONSTRUCTION OF (Name of Project and Location) once a ste {Ctetty of canted) kt cm ot ‘ovat at SENSE eo. nae ore ori Sho ire hfe of SF Bao (i oxy) DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LAYOUT 6 - Closure of Center Lane - Mullane Road, Low ‘Speed, Short Term ‘DRAWN NOT TO SCALE] AE nis CEH “aro Re wnt MEH 7 REPEAGA RS SES SP Ra@ al lelelelelelal LAYOUT 7 (Case 1) - Part Lane Closure -2 Lane, 2 Way Road, High Speed, Long Term DRAWN ROT TO SCALE, 6 FRR SG) 7 area wk (oN a) 1 TSPORY SLMS (© MEER Se A SUR DI PPR | F/E)SE|8) 8/8) 5/8/8)% Ti RSA ROG I UES SMSO 8 YE) novormeasainnats — ¢ ‘ age cree ¢ ; sep ave nus Fona one vor arena vans —) ¢ 2 ‘saree ¢ : Server DETAIL OF STEEL GRATING. DRAINAGE SCHEDUL DRAINAGE SCHEDULE DRAINAGE SCHEDULE DRAINAGE SCHEDULE PLAN AND PROFILE (SECTION 1 - SOBRECAREY ST.) . & i A A ' ee ee oni el otalavieasraso era ertsaoe ea wa AN en END OF SECTION 4 STA. 1514+563.766 soles) sig [aveRSE TNE PLAN AND PROFILE (SECTION 2 - CARMEN ST.) BEG. OF SECTION 2 ‘STA. 1511+390.000 a pe it Hl hy i Hi END OF SECTION 2 STA. 15149676.754 PLAN AND PROFILE (SECTION 3 - VILLAMOR ST.) Beco est Pas Se nwa HH FA rh bit pag Ti Had Att i i ss asas ces dts As ae ais HH ca i reer pestis moth ot § a 8 8 mits! tat s Qo ea END OF SECTION 3 STA. 1544+003.443 PLAN AND PROFILE (SECTION 4 - VINZON ST.) EG. OF SECTION 4 STA. 15114416.018 BEG. OF SECTION 4 STA 1516416018 tana p wasue [END OF SECTION 4 CROSS SECTIONS (SECTION 1 - SOBRECAREY ST.) CROSS SECTIONS (SECTION 2 - CARMEN ST.) SH Kat et EHH CROSS SECTIONS (SECTION 3 - VILLAMOR ST.) CROSS SECTIONS (SECTION 4 - VINZON ST.) 6S | | }

You might also like