You are on page 1of 2
‘GENERAL MOTORS ENGINEERING STANDARDS ANTI-CORROSION COATING FOR FRAMES 9986165, 1 SCOPE. This specification covers the pretreatment pint materials and some processing equitements for a water- ‘borne black, electrodepostion primer used on frames. Access, vent and dain holes may have to be added to frame rails and cross members to asstre adequate paint film coverage is applied to the enclosed eavity. ‘The material shall be applied {minimum film thickness of 25 microns on exterior surfaces ‘and 13 mierons om all inierior surfaces. 2. REFERENCED STANDARDS. GMo0M—— GM9I02P 984001 GME389M_——_GM9S08P 9984123 GMa2KP— GM9535P 98297 GMBOTIP.—— GM9S40P 3. REQUIREMENTS. 3.1 RESTRICTED AND REPORTABLE CHEMICALS: (GMIO00M), “All materials supplied to this specication must, ‘comply withthe requirements listed in GMIOO0M, Restricted and Reportable Cheamicals 3.2 PROCESS REQUIREMENTS. The approved coating ‘hall be applied in secordance with the suppliers recommcn ations, Frames should be processed in vehicle position Surface condition of metal to be painted shall meet require- rents of 9984001 32.1 Chemical Surface Treatment, Clean and pretreat ith approved products as shown in the GM Corporate Materials File for an immersion phosphate coating and chrome sealer processes. Only phosphate materials approved to GM engi heering standard 9984123 zine phosphate may be used Processing parameters should confurm to those recommended hy the chemical suppliers. DI water rinses must be propetly maintained in order to meet the pecformance requirements of this specification, Altemate processes must receive engineering ‘department approval 3.22 Blectocoat Applicaton, Frames shall be immersed lecroceat bath for sulficient time atthe specified volkage to ‘obtain the required film build. The tank should be designed such thatthe parts exit fom the bath fre of residue and exees sive foam. It is recommended that the parts enter the ‘lcctrocoat tank with the exterior surface completely dry of ‘completely wet with deionized water to avoid appearance defects, 3.23 Rinsing 3.24 Cure. ‘The parts shall be baked for a minimum of 20 minutes. @ 190°C (375°F) metal temperature (all areas of the frame) 33 PROPERTIES. Sco Table | TABLE 1 Properties Values Block <0 # per gallon 0 Must be & smooth, uniform surface. No blisters, rmouts, rinsing residues or ‘other surface defeets sei could requir serious rep GENERAL MOTORS ENGINEERING STANDARDS Materials and Processes — Paint ANTI-CORROSION COATING FOR FRAMES, 9986165 3.4 PERFORMANCE REQUIREMENTS (SEE TABLE 2). Test panels forall the performance tests are 2 to 3 mm thick by 75 x 300 mm hot rolled steel, pickled and ot) frame and bot rolled steel hot dipped galvanized (TOG/70GU). All test panels are to be aged 72 h before tests are performed. Testing should be performed before and after heat soak (48 6 @ 208 C (400°F)) ‘TABLE 2 Properties Tet Values Tet Methods Gravelometer 3 GMOSORP, Throwpawer 300-350 mim min [GMOSISP Neutral Salt Spray 1000 GMA208 << 1% face rast No blisters Corrosion Creepback Tm ma creep EMOTO, ‘Crosshatch Tape Adhesion <1 lows [oMOOTIP (Cyelie Corresion GM9S40P, Method B, Duration © Exterior Surface 1.0 mil min 3.mm max ereep < 1% face rust Imerior Surface 06 rit 3 mm max creep < 1% face rust Fastener Cyele Test WRIT 4 SOURCE SHIPMENT RESPONSIBILITY. _ It will be the responsibilty of the supplicr to insure thatthe material is rot exposed to temperatures during shipment which would cause the material {0 fail t» mect any of the requirements of this specification 5 INITIAL SOURCE APPROVAL. bbe made by any supplier until repre samples have been approved by eng requirements ofthis specification, No shipment shall inital production ‘as meeting the 5.1 Completed copies of the Material Safety Data Sheet ‘axeting GM information requirements must be submitted with any new submissions or whenever a composition change has ecurred. 6 INSPECTION AND REJECTION. ‘material oF parts u tured this specification shall be & \o the intial samples approved by et ro changes in either formulation or manufacturing processes permitted without prior notification and approval by’ engineer Ing. Lack of notification by the supplier constituies grounds Al shipments of hase order manuf for rejection of any shipment. While samples may be taken from incoming shipments and checked for conformance (0 this specification, the supplicr shall accept the responsibility for incoming shipments mecting this specification without depen- dence upon purchaser's inspection. In addition, the supplier shall be responsible for submitting @ Certificate of Analysis ‘with each batch of material arriving ata plant. This document shall be prepared and provide data in accordance with the requirements detailed in’ GM4389M 7 APPROVED SOURCES. — Engincering qualification fan approved source is required for this specification, Only Ssourees listed in the GM Materials File under this specification number have been qualified by engincering as meeting the ‘quirements of this specification. Sources are available through the on-line MATSPC System thoriration Act favironmental 8 REFERENCES. Superfund Add Re- = Title 313 (SARA), administered by the Protection Agency (EPA). 9 GENERAL INFORMATION. ‘This stzndard was org nated by the the Anii-Corrosion Coatings and Waxes Specialist. “Team in June 1998,

You might also like