2.1 INTRODUCTION
Total Quality Management (TQM) bursts on the international scene in the early 1980s.
Individuals such as Juran and Deming achieved guru status by extolling its virtues.
Edward Deming introduced the process of statistical measures during the period 1939-45
to control quality. He showed that process operator could eliminate 15% of the causes of
variation and that the management was accountable for remaining 85% of the problems.
However, American managers did not appreciate this conclusion initially. Deming
philosophy was, however, taken seriously by the Japanese industrialists and they applied
his teachings enthusiastically. The outcome was turnaround of Japan’s industrial 23
Quality Systems fortunes. Since then western managements are attempting to follow the Japanese
example by adopting a consistent approach to quality. This new mantra that a consistent
and persistent investment in quality will eventually pay off is deeply imbibed in the
philosophy of TQM.
Objectives
After studying this unit, you should be able to
• understand the features of TQM,
• explain the axioms of TQM through Joiners triangle,
• know the tools for improving quality, and
• implement zero defect programme.
24
(ii) Developing an alert open-minded, questioning attitude on the part of all Concepts of Total
employees. Quality Management
26
Axiom 3: Involvement Axiom 2: Scientific Knowledge Concepts of Total
Quality Management
Figure 2.1: Joiner’s Triangle of TQM Axioms
With the help of these cornerstones, the realization of the TQM culture is possible. The
interdependence of these cornerstones makes it easy to characterize the TQM
environment fully, as well as to define it clearly.
Commitment
When TQM is being practiced within the organization, the aim of organization is to
be the best in its kind. For this it needs a change in attitudes and culture, something
that is impossible unless there is a real commitment to quality and innovation from
the senior management. The management must regard the workforce as an asset
and must be willing to invest in the future development of workforce. However the
commitment should not be restricted in the form of slogans and meetings only.
Slogans demanding quality from everyone are not likely to achieve anything but
frustration, anxiety and isolation. Some of the ways to motivate the workforce
include :
• proper working conditions,
• adequate education and training, good communication and cooperation,
• modern leadership rather than strict supervision,
• good incoming material and equipment, appropriate quality tool, and
• job satisfaction and incentives to workforce for good work.
Senior managers should be the ones to plan, initiate and coordinate the quality
improvement process and keep up the momentum when enthusiasm dies down.
Thus, a management commitment to continually improving the quality of products
and service is an obvious necessity.
Scientific Knowledge
The best way forward for improving processes is use of scientific approach, not
opinion or emotion. A proper scientific approach helps managers focus their
attention on individuals and take decisions based on facts unlike conventional
wisdom. Scientific procedures like statistical methods help exploit information
generated by processes and are used to anticipate, identify and correct mistakes.
The main advantages of scientific knowledge are as follows :
(i) It provides a common language, which can facilitate communication between
the different departments and between different individuals.
(ii) Scientific knowledge helps employees in owning the responsibility for quality
and certain quality problems as they arise.
The role of TQM quality department should be that of co-ordination, education and
support of scientific quality tools throughout the organization. Additional duties
should include continuous research and development of innovative methods or
further development of existing ones.
Involvement
This cornerstone is concerned with the social change of feeling that all are part of
one team in the organization. The capacity of problem solving increases many times
when there is a common effort. Due to synergy, the output of the group is much
more than the individual output of its members. Employees will contribute and
innovate if they know that genuine effort will always be successful in their
endeavours; this is because teamwork provides a strong capacity to absorb
occasional failures. The team spirit efforts should extend outside the company, to
include the subcontractors and suppliers. 27
Quality Systems
2.6 VALUABLE TOOLS FOR QUALITY
At present there are more than 40 quality tools. In this section, seven most commonly
used quality tools used in conjunction with TQM shall be discussed.
Cause and Effect Diagram
A cause and effect diagram (Figure 2.2) is used when the need is to identify,
explore, and display the possible causes of a specific problem or condition. They
are also called “Ishikawa” diagrams after its originator or “Fishbone” diagram
because of its shape. Major causes (A, B, C, D, E) are the primary causes.
Contributing factors or minor problems (A1, B1) within a major cause are listed as
the small “bones” attached to the large “bones”.
Minor Problem
Minor Problem B1 A1
Problem to
be Solved
Flowchart
A flowchart is a pictorial representation showing all the steps of a process. A
flowchart consists of a various symbols arranged in a sequential order that
represents the flow of information. Flowcharts are used to document a process. By
creating and studying flowcharts the management can often uncover sources of
trouble as well as solution to problems. The meanings of some symbols are
described below.
50
1. Blow holes 50%
40 2. Hard spots 30%
Total Rejected
30 3. Scabs 10%
4. Shifts 7%
20 5. Cold shuts 4%
10
0
1 2 3 4 5
Causes of Failure (Defects)
Run Chart
A run chart (Figure 2.4) is used to monitor a process to see whether or not the
long-range average is changing. This is the simplest tool to construct and use.
Control Chart
A control chart is simply a run chart with statistically determined upper and lower
control limit lines (UCL and LCL, respectively) drawn on either side of the process
average. Being in control simply means that the process is consistent. This is
observed in chart when no data points fall outside the control lines. The control
limits are calculated as follows.
Calculate arithmetic mean for the means of ‘n’ samples. If the mean of ith sample
is Xi, then the mean of means, called grand mean, is given by
(X 1 + X 2 + X 3 + . . . + X n )
X =
n
(X 1 − X) 2 + ( X 2 − X) 2 + . . . + ( X n − X) 2
Calculate the standard deviation, s =
n
Calculate the upper control limit, UCL = X + 3 s
29
Quality Systems
Correlation Chart
A correlation (Figure 2.6) chart measures the performance of one factor compared
to another and helps determine what relationship, if any, exists.
Histogram
A histogram is a bar graph that gives a pictorial representation of data. The
intervals are shown on the X-axis and the number of scores in each interval is
represented by the height of a rectangle located above the interval. The following
example illustrates how to construct a histogram. The data below are the spelling
test scores for 20 students on a 50 word-spelling test. The scores (number correct)
are: 48, 49, 50, 46, 47, 47, 35, 38, 40, 42, 45, 47, 48, 44, 43, 46, 45, 42, 43, 47.
The largest number is 50 and the smallest is 35. Then, the range, R = 50 − 35 = 15.
The 20 students are divided into 5 classes. Hence the interval width = R/5 =15/5
= 3. The first class has a lower limit of 35. Therefore, the first upper limit is 35+3
or 38. The second class will have a lower limit of 38 and an upper limit of 41. Data
in tabular form is shown in Table 2.1. Corresponding histogram is shown in Figure
2.7.
Table 2.1 : Frequency Table
Class Lower Limit Upper Limit Frequency
1 35 38 1
2 38 41 2
30
Concepts of Total
3 41 44 4
Quality Management
4 44 47 5
5 47 50 8
34
2.8.1 14 Points to Quality Management Concepts of Total
Quality Management
The principles by which TQM can be incorporated into an organization is given by
Deming’s 14 points for Transformation of Management. These include
Create Constancy of Purpose
Create constancy of purpose towards improvement of product and service with the
aim to become competitive, to stay in business, and to provide jobs. The
management must take immediate action on any deviation from the drive towards
achieving constancy.
Adopt a New Philosophy
A change is necessary in the old management methods, which are no longer
effective for today’s business environment. If current management practices are
not in tandem with the type of business then the cost is bound to be loss of
competitive position.
Cease Dependence on Mass Inspection to Achieve Quality
Build quality into the product in the first place. If possible, everything has to be
done right at first time so that there is no need for rectification later. There is a
need to replace the practices of mass inspection and defect detection with
practices of defect prevention and continuous improvement
End the Practice of Awarding Business on the Basis of Price Alone
The low price of incoming materials does not ensure performance. It is possible
that the future supplies are not consistent as regards quality level. Therefore, it is
always worthwhile to stick to a single supplier for any one item in a long-term
business association of loyalty and trust.
Constantly Improve the System of Production and Service
The company should always try to reduce variability in order to improve quality and
productivity constantly and decrease costs. The manager should keep an eye on the
system, maintenance and process improvement and training. He should anticipate
trouble and not become content.
Institute Training on the Job
Training and education are the cornerstones of consistency. Investment in proper
training of all new employees including managers will ensure that newcomers will
immediately start contributing to their full capacity.
Adopt and Institute Methods of Supervision and Leadership
The aim of supervision should be to help people and machines do a better job, that
employees take more interest in work and come forward in handling
responsibilities. Modern leadership means that people leading the company must
show the employees ways of improving productivity; the leaders should be a
motivating factor; they should teach and counsel rather than judge.
Drive Out Fear
In order that everyone works effectively and productively for the company, a
two-way communication should be encouraged. When fear is driven away, it leads
to successful joint working relationships, based on respect and cooperation. An
atmosphere of fear is always counter-productive and reduces competitiveness and
innovation.
Break Down Barriers between Departments and Individuals
35
Quality Systems People from all departments contribute to a common goal of company and
eventually success. This is possible when individual barriers breakdown and lead to
mutual trust and cooperation.
Eliminate Slogans
Slogans and poster campaign demanding for new levels of excellence do not yield
positive results because the worker cannot correct the causes of low quality and
unsatisfactory productivity. No substantial improvement can be made through
slogans unless management takes an initiative or employee training is done.
Eliminate Numerical Goals or Work Standards
The only way to increase quality and productivity is to replace work standards with
competent leadership. If target is reasonable and eventually achieved, the employee
involved will become complacent and put no more efforts. On the other hand if
target is unreasonable, either it will not be attained or it will be attained by
manipulating the figures and/or lowering standards. Thus, any methods relying on
numerical goals are detrimental to the future of the whole company.
End Annual Reviews or Merit Rating
Deming strongly recommends the abolition of the annual merit rating because it
destroys teamwork, increases variability in the performance of employee and
focuses on short term. Besides, it causes excessive internal competition and
isolation, reduces initiatives and risk-taking.
Institute a Rigorous Program of Education and Self-improvement
This refers to continuing re-education and self-improvement for everyone.
Retraining is as essential as providing training to new employees because it gives
the people a sense of security that their work carries a value. Re-education assures
that if the position, the employee is currently holding, ceases to hold a value, then he
would be able to change into a more valuable position within the company.
Define Top Management’s Permanent Commitment to ever Improving Quality
and Productivity
Management should immediately take action to accomplish the transformation by
implementing the preceding 13 points. Once a manager fully understands Deming’s
philosophy, he will become capable of coordinating actions for continuous
improvement.
2.8.2 The Seven Deadly Sins
Deming, in addition to putting forward his philosophy in the 14 points, also identified seven
deadly diseases that, if unattended, cause harm in the organization and prevent it from
becoming a “world-class” organization. The seven deadly sins are :
Lack of Constancy
A constancy of purpose provides the company charter for planning of products and
services that will have a market and keep the company in business and provide
jobs. The absence of constancy of purpose has a bad effect on the overall
environment of organization.
Short-term Profits
An emphasis on short-term profits is accompanied by short-term thinking. Profits
can be obtained by cutting down and training on investments originally intended for
employee benefits. The reasons of such action are: fear of unfriendly takeover and
push from investors for dividends.
36
Performance Appraisal Concepts of Total
Quality Management
The meaning of performance appraisal is evaluation of performance by merit
rating. If the merit is based on system parameters that are against the norms and
ethics of present and without comparison to standard reference, the effects could
be devastating. Rewards based on short-term performance destroy long-term
planning, builds fear, demolishes teamwork, nourishes rivalry and politics. Often, a
feeling of depression is inevitable making the employee unfit for work for weeks
after receipt of rating.
Job-hopping
Job-hopping refers to the constant change in management due to continuous
replacement or exchange of people in leadership positions. This leaves everyone
wondering about stability, having to deal with new style of leadership and changes
in direction.
Use of Visible Figures Only
When a company presents its progress report, it is often subjected to manipulation.
One can cut down on research, education, training and quality improvement efforts
in order to show profits. The use of only visible figures do not present the true
image of the company’s standing in the market. For example, what are the figures
for failing to satisfy the customer, improving quality and productivity etc.
Excessive Medical Costs
The presence of excessive medical costs, unsafe products, unsafe processes,
unsafe work place, and job stress puts a negative effect to the work attitude.
Excessive Costs of Liability
The liability of legal requirements to be met during work costs a lot of time to the
worker. This puts him under psychological pressure and he is often involved more
with dealing how to complete the legalities.
2.8.3 The PDCA Cycle
There is an ongoing cycle of activities that Deming suggests as a procedure to assist in
the establishment and long-term existence of a quality organization. The cycle, called the
Deming cycle (or Shewhart cycle), consists of four main stages, one following another in
a specific order that is repeated continuously. This is shown in Figure 2.9. The name
PDCA cycle is often used as an acronym for all four stages: plan, do, check, act.
PDCA cycle reflects the basis of a self-sustaining quality programme. It should drive any
process or activity in the company, howsoever small. The four elements are explained
below.
Plan
The process of improvement should start with careful planning of the route of
action. This could involve a great deal of understanding, documenting, evaluating
and assessing the tools to be used for an effective quality programme. Change 37
Quality Systems should be gradual and not for the sake of change. At this stage, decisions should be
taken on the objectives to aim for, the changes that are needed, the types of
performance measure to be used, and who should be responsible for what. Also, a
determination should be made of the availability of resources or data, the possible
implications of the actions and the contingency measures to be taken when
something goes wrong.
Do
Implementation of the plan should follow with the involvement of everybody. This
will include training in scientific methods, survey of the customer’s needs and
expectations, identification of core processes, collection of statistical information,
understanding of process control and variation, identification of projects with
improvement objectives, formation of project teams and communication of resulting
successes. At this stage, small-scale implementation of any planned change will
take place and resulting data will be collected.
Check
Checking how the plan is evolving is an important part of the cycle. This involves
measuring and observing the ‘effects’ of any change or test carried out at the do
stage, analysis of results, feedback and revie w. Using actual data, deviations from
original expectations should be evaluated and investigated.
Act
Corrective action can follow, based on the lessons learned so far. A study of the
current situation should be made, standardizing any improvements and properly
documenting any good new processes and innovative ideas. The review at the
checking stage can be used as a learning process, so that knowledge is built into a
new plan. Planning requires prediction; the result of any change at the action stage
can enhance the ability to predict in the future. The Deming cycle of Planning,
Implementation, Checking, Action, (New) Plan is thus ready to start again. This
should never stop.
SAQ 1
(a) What are the differences between Kaizen and Innovation?
(b) What is a PDCA cycle ?
Negative
Influences
Quality Improvement
Schemes Apply Yes
Quality Planning
The important aspects in planning for quality are
(i) Identifying the customer and needs.
(ii) Translating the customer’s needs into a language that every employee of
organization can understand, and develop a product.
(iii) Optimizing the product by developing and optimizing the process.
(iv) Once operating conditions have been established and proved as optimal,
transferring the process to operate. Cost considerations play important role in
planning.
Quality Control
Control is the process of detecting and correcting adverse changes. Changes occur
inadvertently due to effect of negative influence on the set level of quality. It is
crucial to take action when standards are not met in the from of audits, control
limits etc. Juran states that the majority (80%) of the current quality problems are
the fault of poor management rather than poor workmanship on the factory floor.
Only a process in control is predictable and amenable to further improvement.
Quality Improvement
39
Quality Systems Juran believes that improvement can be realized by organized procedures and
priority. To achieve a breakthrough, Juran suggests the following steps:
(i) Accept the responsibility for making improvement. Management must be
involved.
(ii) Understand the universal sequence of events for making the improvements.
(iii) Apply the universal sequence to actual company problems.
2.9.2 Achieving Quality through Breakthrough
Juran emphasizes that quality results can be attained by making a breakthrough. A
breakthrough indicates a “beneficial change” from status quo. Such a change is needed
for overcoming chronic quality problems. The organization often are busy in fire fighting
to overcome sporadic quality problems but would be immensely benefited if chronic
quality problems are removed. But quality does not happen by accident. It has to follow a
sequence of plan. Juran dictates the following steps by which this universal breakthrough
sequence is to be carried out in an organization.
Proof of the Need
Appropriate level of management should be convinced of the significance of the
quality issue which will require a new approach. The top management easily
understands a proposal in terms of money. For example, the problem of waste
should be converted into money lost in order to provide a proof to the management,
i.e. the management must acknowledge that a lot of waste is being generated under
the current practices of operation.
Project Identification
The only way of achieving a breakthrough is by converting chronic problems into
specific projects. The project provides a way of separating budgets and facilities
to conduct experiments. In order to correctly identify project, prioritizing is done by
pareto analysis (discussed in Section 2.6.3).
Organization for Improvement
This stage requires that clear responsibilities are established for three levels of
activities :
(i) Guiding improvement programmes that are done by a team of upper
managers.
(ii) Project-by-project improvement.
(iii) Analyzing each project.
The Diagnostic Journey
The diagnosis involves discovering the causes of defect by proper experimentation,
data collection, interpretation of results and finally testing any theories. Errors are
bound to occur either from operator side or management side or both. Juran
categorizes them as :
(i) Inadvertent errors if these are unintentional and unpredictable; beyond the
realm of operator awareness.
(ii) Those errors arising out of lack of knowledge are technical errors.
(iii) The last one is willful errors so called because operator makes intentionally
and persistently and is aware of making the errors but ignores.
Remedial Action
40
For problems arising due to operator controllable error, Juran suggests the Concepts of Total
remedies, some of which are as follows : Quality Management
(i) One should not give orders to other and both should take orders from the
situation.
(ii) Establish accountability. Find out who the worker is and who did the job.
(iii) Provide assistance to workers in identifying defects from operator’s side.
(iv) Reassign work by separating critical work from rest.
(v) Improve communications among workers and supervisors to promote the
mutual interests and understanding.
(vi) After the problem is diagnosed, a proper choice to solution should be
considered. The best method of doing this is to quantify for each alternative
the cost to organization.
(vii) Practice preventive maintenance.
(viii) Practice open communication and feedback between different departments.
Quick access to procedures, instructions, policies, keywords, specification
etc.
(ix) Establish clear responsibilities for quality-oriented decision.
(x) Practice sampling instead of 100% inspection.
(xi) Separate problems using Pareto principle.
Resistance to Change
There is a resistance to change. Juran recommends certain actions to overcome
the social and culture factors.
(i) Provide Participation : People who are affected by the change should be
allowed to participate both in planning and in execution of change. This
provides opportunity to evaluate merits as well as impact and threat to
current beneficial practices. Participant should be treated with dignity so that
favourable social climate is developed which makes change more
acceptable.
(ii) Provide Enough Time : In order to absorb and evaluate the merits and
demerits of change, adequate time must be allowed. Conducting a small
tryout of the yet-to-incorporate change reduces risks and provides the
needed proof to the advocates of change as well as those giving resistance.
Holding the Gains
The final step in a breakthrough sequence is to hold the gains achieved so far.
Operating forces must engage in control activities when out of control situations
occur. The methods of doing this are
• establishing new standards and making it known to operators of what is
expected from them from now on,
• training of operator so they know what exactly has been changed, and
• establishing a new system of control consisting of early warning signals,
techniques for analysis of data and rules for decision making and reporting.
When a breakthrough in new level of performance has been achieved and gains have
been held as the new standards, the sequence of event is ready to start again.
41
Quality Systems
2.10 CROSBY AND QUALITY TREATMENT
Philip B. Crosby was first to popularize quality for top management. He claimed that all
quality improvements pay for themselves, i.e. that quality is free. Crosby’s most important
contribution has been the development of a 14-point programme of quality improvement
and zero defect concept.
2.10.1 Zero Defect Concept
The zero defect concept has two meanings which are explained below.
Defect-Free Product
This concept has value as a long- range objective, since it implies the need for
never-ending improvement. The concept rejects the idea that we can relax our
efforts short of perfection. In contrast, if defect-free product is viewed as a
short- range objective, it becomes counterproductive by shutting off efforts to reach
attainable goals.
Zero Defects as a Slogan
In this meaning, the term is adopted as a kind of banner, which motivates the
company to improve quality. In its best usage, this is comparable to adopting an
appealing brand name to help sell a product. If the drive is well conceived (i.e., a
“good” product), then a good brand name is assured. If the drive is ill-conceived
(e.g., an attempt to solve the company’s quality problems by pressurizing the work
force), then it will fail no matter how clever is the slogan.
2.10.2 The Four Absolutes of Quality
Crosby provides the following four absolutes regarding quality.
Quality Means Conformance, Not Elegance
Quality is the conformance of a product or a service to requirements. The definition
of quality can never make any sense unless it is based on exactly what the
customer wants. As a consequence, the management has the following three tasks
to perform.
(i) Establish the requirements to be met and communicate them to all employees
of organization.
(ii) Provide appropriate tools and techniques, and the necessary training in them.
(iii) Provide continuous support and management.
The System of Quality is Prevention
Before carrying out the operation, it is beneficial to identify all opportunities for
error. At least a contingency plan can be drawn up so that if the problem really
occurs, the damage is controlled and restricted to minimum possible. Inspection is
inevitable. But a company that relies on mass inspection of the final output cannot
achieve progress.
The Measurement of Quality is the Price of Non-conformance
The price of non-conformance (PONC) indicates the costs involved with doing
wrong things – rejects, reworking, warranty costs etc. The sum costs of such
actions amounts to 20-40% of the total operating costs. This is the reason why
Crosby stressed that quality is more of a management function rather than a
technical operation. When management realizes the damage done, it is prompted to
apply professional quality functions, prevention efforts and quality education to
bring down the loss. This cost of effort is called the cost of conformance or COC.
42
Thus, a company whose products and services are rated as of high quality is paying Concepts of Total
a very low price of non-conformance. Quality Management
44
SAQ 2 Concepts of Total
Quality Management
What is the difference between price of conformance and price of non-
conformance?
45
Quality Systems
2.12 POKA-YOKE
The concept of Poka-Yoke was pioneered by Shingeo Shingo of Japan to produce zero
defect products. It is basically a mistake-proofing system. Originally called “fool proofing”
and later changed to “mistake proofing”, poka-yoke translates into English as to avoid
inadvertent errors. Such a system employs inspection actively to identify errors during
the process. The result is a business that wastes less energy, time and resources. A poka-
yoke employed in a production system works by detecting the errors and stopping the
production. Only after finding out the cause of error and eliminating error, the production
system is resumed. The use of poka-yoke in a production system is extremely valuable
because it prevents the occurrence of the same error repeatedly. Poka-yoke uses a
bunch of small devices to either detect or prevent defects. The device can be developed
by anyone from manager to line employee. A poka-yoke device is any mechanism that
either prevents a mistake from being made or makes the mistake obvious at a glance. The
ability to find mistakes at a glance is essential. Suppose a person picks up a pen at a bank
to sign a cheque. But when the top is depressed to extend the writing part the pen
malfunctions because the inside spring is absent. A simple poka-yoke to prevent such a
situation could have been built into the assembling process of pen. This is as follows :
(i) Present all the pieces of pens in one dish and springs in another dish.
(ii) The worker counts out springs from the dish, puts springs inside pen and
places them in a small tray.
(iii) After assembly is complete, if a spring remains in the dish, an error has
occurred. The operator knows a spring has been omitted and can correct the
omission immediately.
The cost of this inspection (looking at the dish) is minimal, yet it effectively functions as a
form of inspection. The cost of rework at this point is also minimal, although the preferred
outcome is still to find the dish empty at the end of assembly and to avoid rework even
when its cost is small. The effects of employing poka-yoke are observed in increased
productivity and decrease of error rate. Poka-yoke devices are an effective alternative to
demands for greater worker diligence. Hence, the morale and worker attitudes also
improve when a poka-yoke is employed. There are certain disadvantages associated with
installation of poka-yoke.
• It demands a certain level of quality built into system. For example, if a
production line is malfunctioning at several points, the in-built poka-yoke will
cause a large number of stoppages of the line. This is not desirable, as
productivity will be hampered.
• The devices do not work properly if the production rate is very fast. This is
because the devices need some time to respond to an error and if the
production line moves rapidly, it is possible to bypass the error. For example,
by the time, error in certain dimension of a component is noted and the
information is conveyed to production line, many quantities of the product
would have been produced.
Project
Management
Concurrent
Engineering
Figure 2.11 : Integration of Project Management and TQM with Concurrent Engineering
Managing a project in tandem rather than in a sequential manner is not easy and superior
project control is required to avoid increasing the level of risk later in the project. The
most serious risks are delays in bringing product to market and costs when reworking is
needed due to poor planning or poor project control. Improved planning, scheduling and
control are essential to modern project management, so it is obvious for top companies to
integrate concurrent engineering, project management systems and TQM.
2.14 SUMMARY
In this unit, an introduction to the various elements of TQM is provided. The views of
Deming are explained through Joiner’s triangle, 14 steps to Quality Management and
PDCA cycle. Juran’s road to improving quality is presented through Juran’s Trilogy
Model. The concept of Zero Defect and 14 points of Quality Improvement form the basis
of Crosby’s philosophy. In addition, a description of various quality tools were also
explained. The practices of Kaizen and Poka-Yoke were addressed to show how
productivity could be increased. Finally, the concepts of Concurrent Engineering were
introduced to show the benefits of integrating different management practices in the quest
to quality.
48