Abstract-The reliability of Electro-Hydraulic-Controlled Some of the key elements in maintaining the fluid are:
(EHC) turbine generators can be increased by properly 1. Cleanliness by proper maintenance and use of the
maintaining the hydraulic system and fluid. With auxiliary filtering system.
increasing cost of production downtime and energy, the 2. Maintain moisture content below 0.10%.
demand for reliable turbine generator operation 3. Maintain the temperature of the fluid
becomes more prevalent year after year. The purpose between 110°F and 115°F.
of this paper is to describe the necessary requirements 4. Maintain resistivity of the fluid above 5,000
for maintaining the electro-hydraulic system through meg. ohms/cm.
proper care of the phosphate ester fluid. Also it will 5. Maintain acid neutralization number below 0.20, (mg
also address the expected results of operating a system KOH/g) which is affected by all of the above.
with contaminated fluid and the cleanup of a
contaminated system. II. CLEANLINESS
184
are changing and very probably indicates changed recommendations. With this process, any change in the
tolerances in the servo valve due to contaminated fluid. fluid quality can quickly be detected and the
appropriate steps taken to correct the problem.
VIII. CLEANING A CONTAMINATED SYSTEM Whereas with extended operation, the system will
become severelycontaminated and component damage
When a system has been operated contaminated for will occur.
long periods of time, follow the procedure listed below
to clean it up: X RECOMMENDATIONS
rn Remove the "fullers earth" filter and change the 1/2 Test the fluid every three (3) months.
micron backup element in the auxiliary filtering system.
(See Fig. 1.) Replace the "fullers earth filter with a Selexsorb GTR
element in the auxiliary filtering system. Change this
With unit operating, add 5% of 88050 Fyrquel element as needed or at least once a year.
flushing fluid and run for 12 hours, watching for
foaming. If foaming occurs, add a small amount of Change the 5 micron filter element in the auxiliary
silicone defoamer. (88050 purchased from AKZO filtering system every six (6) months.
Chemical, Inc., Gallipolis Ferry, WV, 25515).
Dry the silica packets in the breathing compartment
Add an additional 5% of 88050 flushing fluid and of the hydraulic reservoir in a controlled temperature
operate for another 12 hours watching for the foaming oven at 250" F for 16-24 hours every 6 months.
possibility.
Maintain temperature of the EHC fluid in the
With the machine down, shut the hydraulic system reservoir between 110" F and 115"F.
down and lock out the pumps. Drain all the EHC and
88050 fluid. Change the hydraulic supply pump in-line filter first-
stage element (outside 10 micron) and wash the second
Clean the tank and auxiliary filter reservoirs stage stainless steel inside unit once a year on a clean
thoroughly using lint-free rags dampened with a good system. This can be done on the run by switching
quality mineral spirit and refill with Fyrquel EHC fluid. pumps.
Run for 24 to 48 hours and shut the system down, lock
the pumps out and drain the tank. This step removes Make sure that the system is not inadvertently
the sludge deposits that have been dislodged by the contaminated with mineral oil by clearly posting a sign
88050 cleaning fluid. Once again, clean the tank and "Fyrquel EHC Fluid Only" on the hydraulic reservoir.
filter reservoirs thoroughly.
Use a good quality mineral spirits to clean all
rn Refill the tank with Fyrquel EHC fluid. components that will come in contact with the
phosphate ester fluid. CAUTION!!! Never use any other
rn Install a Selexsorb GTR filter element in the Hilco- cleaning fluid.
Hiflo filter (P/N ST718-00-03WCO with gasket FB-811-
6). rn Take hydraulic pump motor load readings and
record them watching for any increase from normal.
Start the system back up and flush the servo valves
and rams. This can be done by disconnecting the drain XI. SUMMARY
lines and connecting a hose to catch the fluid in a 5-
gallon container for proper disposal. Reconnect the In order to keep your turbine hydraulic control system
drain lines and put the turbine generator back into operating trouble-free, maintain your phosphate ester
operation. Run for 7 days and take a sample of the EHC fluid in top condition by keeping the system dry as
fluid and send to AKZO Chemical, Inc., for testing. possible, particulate count low, temperature between
110" F and 115" F avoiding high temperature
DC SAF€W/ENVIRONMENTAL conditions and of utmost importance, maintain a low
acid number. This can be done through a
USE CHEMICAL HANWNG GLOVES AT Au. TIMES comprehensive fluid maintenance program. This
WHEN H A N W N G PHOSPHATE ESTER RUIDS. program should include a quarterly monitoring and
ALWAYS F W O W MSDS PROCEDURES WHEN testing program of the fluid by a qualified phosphate
HANWNG OR DISPOSING Of THE FLUID. ester testing laboratory.
Phosphate ester fluids, such as FyrquelR EHC supplied The numbers and suppliers used above are for a
by AKZO Chemical, Inc., are very different from standard General Electric furnished hydraulic system for
petroleum oils and should be tested only by the people turbine control of an EHC machine.
furnishing the fluid. The supplier of the fluid supply test
kit and will test the fluid quarterly free of charge and
furnish a d e t a i l e d test r e p o r t i n c l u d i n g
185