Item/Cost wise breakup for Details of Task to be carried out by Consultant.

Sl. Quantit Sanctioned Sanctioned Amount Quoted by


Particulars Unit Consultant (INR)
No y Rate (In INR) Cost (In INR)

Preparation of all existing


layers from topographical No of Topo
1 338 No. 15000.00 50,70,000.00
sheets after tracing from sheets
field.

Updating and addition of


new roads using Google No. of
2 220 No. 10000.00 22,00,000.00
earth and ancillary sources Blocks
for blocks
No. of MP
Preparation of MP / MLA constituen 28 No. 5000.00 1,40,000.00
constituency and block cies
3
boundaries data as per No. of MLA
census of India constituen 224 No. 5000.00 11,20,000.00
cies
Printing of maps for
No of
4 verification and checking of 320 No. 1500.00 4,80,000.00
blocks
blocks
Edge matching and
mosaicking of databases No of Topo
5 338 No. 1000.00 3,38,000.00
and restructuring as per sheets
SRS, If any required

Total 93,48,000.00