Interfaces and involved

Priority Description Activity parties Delieverable Remarks

Demarcate MCI activities Ammendment to Hand Pending Ms. Noraina’s Updates;Noraina


Study conflicts between over Guideline- was talking about including this into
during commissioning  and Operation
Procedure/ Update another more comprehensive hand
parties during start up
hand over.t CIMG over manual which is under preparation

Defining relationship and


Mapping and Gap Analysis of precedence of all Petronas Operation/Operation
Issue Report
Corrosion Documentation and Carigali Corrosion Control Excellence/GTS
Documents
Consolidate and unify by
Update/Develop
Intelligent Pigging Specification Review of Corrosion Control GTS/Operation Guideline
Documents
QA audit of PRBI and CMP Survey/Study/Audit GTS/Operation Report on non- Nominate projects and perform
implementation and practices conformances audit or be part of audit team.

Improvement accuracy of The scope and content of activity


prepared and is to start January
1 Corrosion Modeling by Field Study Operation/PRSB Issue Report
2016.Campaign already approved by
validation TGTC.

Establish central database for


Data Collection, consolidation
material performance and Operation/GTS Report/Database
failure history in upstream and Study

Corporate corrosion failure


Standardize Fi and RCA Update/ Develop This guideline will improve quality of
investigation methodology and GTS/Operation Guideline Root Cause Analysis studies.
protocol methodes

Central database for qualified


generic corrosion inhibitors Data Collection and review Operation Establish Database To be used later on in projects
and performance records in Study
field
Guideline on MCI job MCI custodianship on important MCI
Issue Report/ and
demarcation during project Review/Gap Study DE only
GiveRecommendations
related topics and reviews (like CP)
review stages should be revised in PTS matrices.