2 4"NS 4 REINFORCEMENT PAD - RP1, SEE STD DWG. 0568-MI20-92S1-1503-001 4 3
5 VARIABLE HEIGHT WELDED SHOE - S4, SEE STD DWG. 4 2
89.4° 2 0568-MI20-92S1-1503-001
EL +32450 50 S9 6 STANDARD WELDED SHOE - S3, SEE STD DWG. 0568-MI20-92S1-1503-001 4 1
9
SPL-1 BP-4in
1-1
40
FALL 1:100 02 S10
G2-4in
"WEST SIDE GUIDE TO
PS-1
CHAMBER (25x25) AT TOP"
S5
S4-4in-300-100-MPM <1
>
2P-PWT-SPS-208 1
2
3 89.4°
S4 EL +32410
RP1-340-MPM-MPWT
301
89.4° 4
EL +32109
150 ERECTION MATERIALS
FALL 1:100 PT DESCRIPTION N.S CLIENT CODE QTY
S4 7 GASKET, 316L SS (ALL RINGS) WITH NON-ASBESTOS FILLER (E.G. 4 GAS71PAA04 1
5 GRAPHITE), SPIRAL WOUND ASME B16.20, 4.5 MM THK (3.175 MM THK
RP1-340-MPM-MPWT SOLID RINGS), FLEXITALLIC TYPE "CGI", CL 150
8 95 MM Zn-Ni Plated + Whitford Xylan 1014 COATING / ASTM A320 GR 5/8 BSL61BB0F095 8
2 PS-2 L7 / ASTM A194 GR 7 WITH 2 HVY HEX NUTS, Deep Med Blue
9 PTFE BEARING PAD - BP, SEE STD DWG. 0568-MI20-92S1-1503-001 4 3
89.4° 502 10 GUIDE FOR PIPE ON SHOE-G2, SEE STD DWG. 0568-MI20-92S1-1503-001 4 1
EL +32097 1 11 HOLD DOWN GUIDE FOR PIPE SHOE-G3, SEE STD DWG. 4 1
6 > S6
<2 0568-MI20-92S1-1503-001
S9 S4-4in-300-100-MPM
65
10 BP-4in 2P-PWT-PS-176
SPL-2
S5
S3-4in-300-MPM
2269
DIRECTION SOUTH
2P-PWT-SPS-176
3037
S9
BP-4in
S11
G3-4in CUT PIECE
PS-3
PIECE NO LENGTH N.S REMARK PIECE NO LENGTH N.S REMARK
668
S4
1 3701 4"
RP1-340-MPM-MPWT 2 915 4"
3 2886 4"
PLATE PENETRATION
<3> 1
4"NS
D YNA- M AC Engineering Services Pte Ltd.
45 GUL ROAD, SINGAPORE 629350
TP-S1401-18 8
E 161041 CLIENT:
N 4043
EL +29060
OWNER:
PS-1 PS-3
F1 F1
PROJECT TITLE :
1 8
DRAWING TITLE :
MODULE 2P-PWT Client
SPL-1 SPL-2
Rev
PWT PACKAGE
DESIGN CONDITION NOTES: LEGEND 2
DE. PRES. (BARG) : STRESS CRITICAL : #N/A NDT (NOTE 5) 1. ALL DIMENSIONS ARE IN MILLIMETER (mm) 04-DO-A2-141031-01
OP. PRES. (BARG) : STRESS No. : RT (%) : #N/A 2. ALL DIMENSIONS TO BE VERIFIED ON SITE SPOOL No. : THREAD No. :
DE. TEMP. (°C) : PIPE SPEC : A2 LPT (%) : 3. DATA BASED ON LINE LIST REV. 5 DME Drawing Number : Sheet No Rev Size Scale
OP. TEMP. (°C) : #N/A INSUL. (TYP.) : MPIT (%) : 4. DESIGN CONDITION TO BE CONFIRMED SHOP WELD No. : MTR No. :
TEST PRESS. (BARG) : TRACING : UT (%) : WITH LATEST LINE LIST. 0 DME 30-OCT-20 ISSUED FOR CONSTRUCTION RJP NAA MW P102105-02P-PIP-WMD-CS-10249 1 / 1 0 A1 NTS
FIELD WELD No. : PIPE SUPPORT Drawn Chk'd Engrg
TEST MEDIUM : #N/A PCKLG&PSVTN : PAUT (%) : 5. THERMAL INSULATION SPECIFICATION
Status/