Is the Contract Straight Forward! Yes, Then FIDIC Green Book If Not Straight Forward, Then Which mean it need design, so based on design IF Design by Employer Then FIDIC RED Book IF Contractor Design Then Contractor see unforeseen risk If there is risk Design Build and Operate FIDIC Yellow Book If there is no unforeseen risk Then Either it should be EPC Project – Silver Book DBO Project –Golden Book
Normally Contracts Are Straight forward mean Green Book or Designed by Employer means Red Book.