Dear Engineer
With reference to Attached Photograph, Kindly be informed that the maximum UDL allowed on Slab
concrete during stocking material, is 2ton/square meter.
You are requested to ensure the load not exceed the allowable limit.
Furthermore stocking material with load exceeding the Limit must be approved by Project supervision
consultant.
Failure to follow-up this notice will be considered as nonconformance and violation.
PM
Please acknowledge receipt by signing, dating and returning the attached copy of this Site Work Instruction