Worldwide Refining Construction Projects

As published in Oil & Gas Journal, May 1, 2017


Spring 2017
Abbreviations listed at bottom of this column.
Added capacity listed in barrels per day (b/d) unless otherwise specified.

Country Database company names

ALGERIA Sonatrach SPA


ALGERIA Sonatrach SPA

Construction project abbreviations:


Listed are major construction projects
by processing and pipeline categories.
Contractors, estimated completion date,
and added capacity are provided when
available.
*Designates projects listed for the first time.
se specified.

City State Country New

Biskra Algeria
Hassi Messaoud Algeria

Engr. Engineer
Contr. Contractor
Tech. Technology
Dsgn. Design
Constr. Construction
PM Project management
CM Construction management
FEED Front-end engineering and design
Added Expected
Project capacity, b/d ~b/d Status Completion

Refinery 5 million tpy Planning —


Refinery 5 million tpy Planning —

PE Procurement engineering
CS Construction supervision
PD Process design
DD Detailed design
JV Joint venture
Lic. License
EPC Engineering procurement
ering and design construction
Contractor Engr. Contr. EPC FEED PD DD

Amec Foster Wheeler FEED


Amec Foster Wheeler FEED
PE CS CM Dsgn. Lic. Tech. Constr. PM
2nd contractor and contrProject notes
Worldwide Petrochemical Construction Projects
Spring 2017
As published in Oil & Gas Journal, May 1, 2017
Abbreviations listed at bottom of this column.
All data are in t/y unless otherwise specified.

Country Company City

ALGERIA Sonatrach Arzew


ALGERIA Sonatrach Arzew

Construction project abbreviations:


Listed are major construction projects
by processing and pipeline categories.
Contractors, estimated completion date,
and added capacity are provided when
available.
*Designates projects listed for the first time.
Added capacity,
State Country New Project (t/y) t/y

Algeria Ethylene 1,100,000


Algeria Methyl tertiary butyl e 200,000

Engr. Engineer PE
Contr. Contractor CS
Tech. Technology PD
Dsgn. Design DD
Constr. Construction JV
PM Project management Lic.
CM Construction management EPC
FEED Front-end engineering and design
Expected <Contract type
Statuscompletion Contractor Engr. Contr. FEED

Engineering — Total SA
Planning — Amec Foster Wheeler Engr.

Procurement engineering
Construction supervision
Process design
Detailed design
Joint venture
License
Engineering procurement
construction
------------- ------------- ------------- ------------- ------------- -------------
EPC PD DD PE CS PM Dsgn. Lic.
------------- -------------
Tech. Constr. 2nd contractor Project notes

Constr.
Worldwide Pipeline Construction Projects
As published in Oil & Gas Journal, May 1, 2017
Spring 2017
Diameter of pipe is listed in inches.
Abbreviations listed at bottom of this column.

Country Company

AUSTRALIA Arrow
AUSTRALIA Esso Australia

C Crude
G Gas
P Products
CN Condensate
COMP Compressor Station
PUMP Pumping Station
STOR Gas Storage
JV Joint Venture
* ------------- Project,
Location (from) Destination (to) New Type miles

North of Moranbah Gladstone, Queensland G 360


Longford Long Island Point C 116
" Expected
Diam. Status completion Contractor Project notes

24-34 Engineering 2018 WorleyParsons New


14 Under constr. 2018 Replacement
Worldwide Gas Processing Construction Projects
Spring 2017
As published in Oil & Gas Journal, May 1, 2017
Abbreviations listed at bottom of this column.

(U.S.)
Country Database Company Name Location State

AUSTRALIA APA Group Gippsland

AZERBAIJAN SOCAR GPC Garadagh

Construction project abbreviations:


Listed are major construction projects
by processing and pipeline categories.
Contractors, estimated completion date,
and added capacity are provided when
available.
*Designates projects listed for the first time.
(MMcfd)
New Added Expected
Country (*) Project capacity ~MMcfd Status completion

Australia Gas plant — — —

Azerbaijan Gas plant 10 billion cu m/year Engineering 2022

Engr. Engineer PE Procurement engineering


Contr. Contractor CS Construction supervision
Tech. Technology PD Process design
Dsgn. Design DD Detailed design
Constr. Construction JV Joint venture
PM Project management Lic. License
CM Construction management EPC Engineering procurement
FEED Front-end engineering and design construction
------------- -------------------------------------------
Contractor Engr. Contr. EPC FEED

Technip--E/D/TL

ngineering
upervision

ocurement
<Contract type> ------------- ------------- ------------- -------------
PD DD PE CS PM Dsgn. Lic. Tech.
-------------
Constr. 2nd contractor andProject notes

Orbost gas plant upgrade to handle Sole field gas.


Worldwide LNG Construction Projects
Spring 2017
As published in Oil & Gas Journal, May 1, 2017
Abbreviations listed at bottom of this column.

Country Company

AUSTRALIA Chevron Australia Pty. Ltd


AUSTRALIA Inpex Australia/Total SA

Construction project abbreviations:


Listed are major construction projects
by processing and pipeline categories.
Contractors, estimated completion date,
and added capacity are provided when
available.
*Designates projects listed for the first time.
New
Location State Country (*) Project

Ashburton North Australia LNG


Darwin Australia LNG

Engr. Engineer
Contr. Contractor
Tech. Technology
Dsgn. Design
Constr. Construction
PM Project management
CM Construction management
FEED Front-end engineering and design
Added
Capacity ~million tpy Status Completion Contractor Engr.

8.9 Under constr. 2017 Worley Parsons


8.4 Under constr. 2017 Chiyoda/JGC/KBR

PE Procurement engineering
CS Construction supervision
PD Process design
DD Detailed design
JV Joint venture
Lic. License
EPC Engineering procurement
ring and design construction
Contr. FEED EPC PD DD PE CS PM

FEED
Dsgn. Lic. Tech. Constr. 2nd contractor and conProject notes

Constr. Two trains: 4.3 million tpy/train. Costs blo


81% complete, April 2016. Cost overruns
4.3 million tpy/train. Costs blown out to $34 billion.
ete, April 2016. Cost overruns, layoffs since