You are on page 1of 10

DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor

PLANT Logo

KGP2301-XXXX-XXXX-XXX-
Document Title REV dd.mm.yyyy
XXX-00##

DOCUMENT TITLE

X dd.mm.yyyy Issued for Review X.Y X.Y X.Y

REV DATE ISSUE, MODIFICATION PREPARED CHECKED APPROVED

Vendor/Contractor Name
….. Floor
Apt…, Erbil
Kurdistan Region
Iraq
Tel.: +964 ……. | Fax: +964 … .. .. …
E-Mail: xxx.xxx@xxx.com | www.xxx.com
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

REVISION CHANGE HISTORY

Rev. Date Explanation / List of Changes

HOLD REGISTER

HOLD description Location in the document

Page 2 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

TABLE OF CONTENTS
1. INTRODUCTION..................................................................................................4
1.1 Project Background.....................................................................................4
1.2 Purpose of this document ...........................................................................4
1.2.1 Exclusions ......................................................................................4
1.2.2 Area and Term of Application ..........................................................4
1.3 Definitions and Abbreviations ......................................................................5
1.3.1 Definitions .......................................................................................5
1.3.2 Abbreviations ..................................................................................6
1.4 Reference ...................................................................................................7
1.4.1 Codes and Standards .....................................................................7
1.4.2 Project Documents..........................................................................7
1.5 Custodian of the Document .........................................................................7

2. HEADING 1 .........................................................................................................8
2.1 Heading 2 ...................................................................................................8
2.2 Heading 3 ...................................................................................................8

TABLES
Table 1: Definitions................................................................................................................ 6
Table 2: Abbreviations ........................................................................................................... 6
Table 3: Codes and Standards .............................................................................................. 7
Table 4: Referenced Project Documents ............................................................................... 7

FIGURES
Figure 1: Figure description ................................................................................................... 8
Figure 2: Figure description ................................................................................................... 8

APPENDICES
Appendix 1: Appendix description ......................................................................................... 9
Appendix 2: Appendix description ........................................................................................10

Page 3 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

1. INTRODUCTION
1.1 Project Background
Due to the expansion in gas production in Kurdistan Region of Iraq, the Ministry of
Natural Resources has appointed KAR GP Ltd (KAR or Company) as a turnkey
EPC contractor to carry out the FEED, Detailed Design and Construction of a new
gas pipeline. The objective of the new gas pipeline is to transport the natural gas
from the increase in gas production in the gas fields located in Kurdistan Region
of Iraq to Duhok Power Plant.

The title of the project is “Domestic Gas Pipeline to Duhok Power Plant” and is
abbreviated as “DGD”.
KAR GP Ltd has awarded [VENDOR/CONTRACTOR] to carry out [insert title of
scope] for the Domestic Gas pipeline to Duhok Power Plant (Project) and to
perform [provide brief description of scope].
1.2 Purpose of this document
[define purpose of document]

1.2.1 Exclusions
[if applicable, define anything that should not be considered as part of the
document, if not, leave empty and indicate “N/A”]

1.2.2 Area and Term of Application


This Document/Procedure shall be applicable to…
[Guide: this section should specify the Parties that are involved in the
implementation of the plan or procedure;]

Page 4 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

1.3 Definitions and Abbreviations

1.3.1 Definitions

Client / Project Owner Ministry of Natural Resources (MNR)


Project Domestic Gas Pipeline to Duhok Power Plant
Company / EPC Contractor KAR GP Ltd.
Engineer / PMC Consultant / ILF Consulting Engineers (ILF) acting with
PMC one or the other or both of the below roles:
- Basic Design and FEED during engineering
and procurement phases (Engineer);
- Project Management Consultant (PMC) and
DD Consultant during project execution,
namely detailed design and construction
phase covering:
(i) Detail Design and Engineering
Follow-up Team as continuation of the
previous phase/services.
(ii) project management team in Erbil
Company Headquarters and
(iii) site supervision team at project sites.
Vendor/Contractor [name] Vendor/Contractor for [define scope]
Other Contractor Third party contractors employed by
Company/EPC Contractor
Other Vendor / Supplier The party who manufactures and/or supplies
services to perform the duties as specified by
the Company
Project Parties All the parties involved in execution of the
Project including Company, Consultant and
all other Vendors, Contractors and parties
involved in Project execution.
Integrated Project The team comprising members from
Management Team (IPMT) Company and Consultant assigned by the
Company to act independently with regards
to the management of Project execution as
one integrated team vis-a-vis Vendors and
Contractors.
Third Party Any legal entity except the ones listed in this
table above
Shall Indicates a mandatory requirement
Should Indicates a strong recommendation to comply
with the requirements of this document
[Insert / specify any other
definition needed for the
particular
plan/procedure/document]

Page 5 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

Table 1: Definitions

1.3.2 Abbreviations
[revise /update table for abbreviation in line with the document’s scope]

CMS Communication Management System


DCR Document Control Register

DCS Document Comment Sheet


DDM Document Distribution Matrix
EDMS Electronic Document Management System
EPC Engineering, Procurement and Construction
FEED Front End Engineering Design
IPMT Integrated Project Management Team
MDDR Master Document & Drawing Register
MNR Ministry of Natural Resources
MOC/MOV Management of Change / Management of
Variations
MRB Manufacturer Record Book
TDR Technical Deviation Request
TQR Technical Query
VDRL Vendor Document Requirement List
VDL Vendor Document List
[Insert / specify any other
abbreviation needed for the
particular
plan/procedure/document]
Table 2: Abbreviations

Page 6 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

1.4 Reference

1.4.1 Codes and Standards


DOC. NO. TITLE
N.A

Table 3: Codes and Standards

1.4.2 Project Documents


[revise /update table for abbreviation in line with the document’s scope]

DOC. NO. TITLE


KGP2301-ILFP-COMM-CMM-REQ- Communication Requirements for
0001 Vendors/Contractors
KGP2301-ILFP-COMM-CMM-LST-0001 List of Project Communication Codes
KGP2301-ILFP-COMM-CMM-PRO- Document and Correspondence
0002 Management Procedure

Table 4: Referenced Project Documents

1.5 Custodian of the Document


The Custodian of this [insert document title] is the [define responsible position like
Engineering Manager of Vendor/Contractor] who shall be contacted for any
suggestions for improvement.
New revisions of this Procedure may be issued upon periodic review and /
or suggestions from the team members of the implementing parties. It is the
Custodian’s responsibility to ensure the distribution of new revisions to all affected
parties.

Page 7 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

2. HEADING 1
2.1 Heading 2
xxx

Figure 1: Figure description

2.2 Heading 3
xxx

Figure 2: Figure description

Page 8 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

APPENDICES
Appendix 1: Appendix description

Page 9 of 10
DOMESTIC GAS PIPELINE TO DUHOK POWER Vendor/Contractor
PLANT Logo
KGP2301-XXXX-XXXX-XXX-XXX-00## Document Title REV dd.mm.yyyy

Appendix 2: Appendix description

Page 10 of 10

You might also like