TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.

TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 1 of 5

METHOD STATEMENT FOR (REPLACE BY DESCRIPTION


OF THE METHOD STATEMENT)

PROJECT : (Replace with the project’s name, at location , city name)

CLIENT : (Replace with the client’s name)

MASTER DEVELOPER : (Replace with the master developer’s name)

PMC : (Replace with the PMC’s name)

LEAD CONSULTANT : (Replace with the lead consultant’s name)

SUB-CONSULTANT : (Replace with the sub-consultant’s name)

MAIN CONTRACTOR : (Replace with the main contractor’s name)

SUB-CONTRACTOR : (Replace with the sub-contractor’s name)

TABLE OF CONTENTS
1. REVISION RECORD...............................................................................................................................3
2. PURPOSE...............................................................................................................................................4
3. SCOPE....................................................................................................................................................4
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 2 of 5

4. REFERANCE..........................................................................................................................................4
5. DEFINITIONS / ABBREVIATIONS..........................................................................................................4
5.1. Definition.............................................................................................................................................4
5.2. Abbreviations......................................................................................................................................4
6. RESPONSIBLITY....................................................................................................................................4
7. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS.............................................................................4
8. PROCEDURE..........................................................................................................................................4
9. HEALTH, SAFETY AND ENVIRONMENT..............................................................................................5
10. ATTACHMENTS......................................................................................................................................5
10.1. Inspection Checklists..........................................................................................................................5
10.2. Inspection Test Plan...........................................................................................................................5
10.3. Risk Assessment................................................................................................................................5
10.4. Technical Data sheet (TDS)...............................................................................................................5
10.5. Material Safety Data Sheet (MSDS)...................................................................................................5

1. REVISION RECORD
This page is a record of all revisions of the document identified below by number and title. All previous revisions
are hereby superseded and are to be destroyed.
Rev Date By Chkd. Approved Description of Revisions
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 3 of 5

0 First issue

Signature field
Revision
Revision
Number
Date
Prepared by Checked by

Reviewed
By Construction Technical QA/QC MEP Co-
Manager Manager Engineer HSE Officer ordinator Sub-contractor

Approved
By Project
Manager

2. PURPOSE
The purpose of this Method Statement is to define the procedure for sequence of works for the cutting of the blinding to
accommodate water feature plumbing and electrical works below the existing blinding levels.
3. SCOPE
This method statement applies to SOG concrete and building concrete in 6C & 6D grids E-K/1-2 at Basement Level 2.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 4 of 5

4. REFERANCE
5. DEFINITIONS / ABBREVIATIONS
5.1.Definition
1. Client -(Replace with clients name)
2. Developer -(Replace with developers name)
3. Consultant -(Replace with consultants name)
4. PMC -(Replace with PMC name)
5. Contractor -(Replace with contractors name)
5.2.Abbreviations
1. Engineer- Representative of “Name of engineering consultancy”
2. ICL - Inspection Check List
3. IR - Inspection Request
4. ITL -Independent Testing Laboratory
5. ITP - Inspection and Test Plan
6. ITR -Inspection & Test Requests
7. MET - Method Statement
8. MIR - Material Inspection Request
9. MSDS - Material Safety Data Sheet
10. PPE -Personal Protective Equipment
11. PQP -Project Quality Plan
12. PTW -Permit To Work ( Working at Height or enclosed spaces)
13. RA -Hazard Identification and Risk Assessment
14. RFIA - Request for Inspection and Approval
15. TBM - Temporary Bench Mark

6. RESPONSIBLITY
7. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS
8. PROCEDURE
1. Layout & Marking
2. Using the latest approved Drawings the Surveyor shall mark out the locations of the required services on the
blinding surface.
3. Cutting and Concrete Removal
4. At the locations marked out by the Surveyor grove shall be cut around the periphery of the area. Additional cuts
crisscrossing the area will be made to help in the removal of the blinding.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 5 of 5

5. The cut concrete debris shall be removed by hammer and chisel. In the case of SOG slab the steel shall be
exposed and bent upwards to provide lapping at the time of recasting.
6. Laying of Services
7. The Surveyor shall layout the alignment and levels of the services to be provided. Wherever the service is passing
a structural member the surveyor shall mark the location and a core shall be drilled. The service pipes shall be laid
out and connected in accordance to approved shop drawings.
8. Filling of Cores
9. After the laying of the services is complete the gaps around pipe penetrations shall be closed off using Laticrete
Hydro Ban. This material shall be used as per its manufacturer’s recommendations as specified in the attached
data sheets.
10. Replacement of Concrete
11. Once all the service installations are complete, the area shall be back filled in layers of a maximum depth of
200mm. Each layer shall be tested to 95% of compaction. The filling and compaction shall continue till the
formation level is reached or in cases of excavation under tie beams, layer compaction below the beam is not
possible due to lack of space. At this point blinding concrete shall be placed
12. Anti-termite Treatment
13. Below the SOG blinding, anti-termite treatment shall be done a few hours before the placement of the blinding
concrete. Care shall be taken to protect the treated soil using polythene sheets.
14. Blinding
15. Shuttering for the blinding shall be fixed to provide a blinding bed 200mm to 300mm deep and 150mm wider than
the strap beam. WIR shall be prepared and offered for inspection to the Consultant along with the complete
preparation of concrete placement. Once the approval from the Consultant has been obtained the concrete shall
be placed.
16. Curing
17. Once the blinding has obtained its initial setting curing shall start and shall proceed for a day. The shuttering shall
be removed and the backfilling and compaction shall be continued as described above.
9. HEALTH, SAFETY AND ENVIRONMENT
10. ATTACHMENTS
10.1. Inspection Checklists
10.2. Inspection Test Plan
10.3. Risk Assessment
10.4. Technical Data sheet (TDS)
10.5. Material Safety Data Sheet (MSDS)