You are on page 1of 3

GANTREX TECHNICAL BULLETIN No.

TB47

Crane Rail Inspection

There are virtually no North American crane design principles for loads and
standards regarding the inspection and load combinations. Both mention
replacement of rails used for overhead inspecting rails, but offer little more than
and gantry cranes, transfer cars and theoretical suggestions based on
other types of rail-mounted material limiting crane skew caused by rail wear.
handling equipment other than railroads.
There are gauges, programs, systems
and algorithms to measure rail wear on
railroad rails, but very little of it can be
Canada Plant & Office used on the unique profiles of crane
Gantrex Canada Inc.
12 Barr Road rails. Private companies may have their
Ajax, ON L1S 3X9 own internal standards, and some crane
manufacturers have paddled out into
Phone: 905-686-0560 this deep water, but perhaps some new
Fax: 905-686-0962
industry consensus standards are
USA Corporate Office needed on this topic.
Gantrex Inc.-Pittsburgh Office
2000 Oxford Dr., Suite 400 Most crane rails are inspected and/or
Bethel Park, PA 15102 replaced based on the instinct or
Toll Free: 1-800-242-6873
experience of the user. This approach
Phone: 412-655-1400 can lead either to the premature
Fax: 412-655-3814 replacement of rails or major problems
caused by waiting too long to replace a
www.Gantrex.com Damaged Crane Rail Splice Joint
rail or system. Bad rails can result in
damage to the crane or structure, For member countries of the European
increased emergency downtime and Union, the broad guidelines known as
unplanned and excessive costs. Rails the, “Machinery Directive” require that
At present, there are that are replaced before they need to be the “manufacturer shall give the wear
no North American is like leaving money on the table. limits of equipment in the maintenance
Standards regarding manual”. Anyone who has been around
the inspection and International Standards
cranes and runways knows that one of
replacement of rails There are some international standards the big problems is figuring out who is
used for cranes. that address the issue of crane rail the “manufacturer” or responsible party
inspection, and these should be for any crane component below the
examined for possible use in North wheels. The international consensus
America. standards provide little help in
determining how to inspect and when to
ISO 9927-1:2009 covers crane replace crane rails.
inspections, ISO 8686-1 addresses
GANTREX TECHNICAL BULLETIN No. TB47 Crane Rail Inspection PAGE 2 OF 3

FRA Study inspection practices and criteria. The


results of the study confirmed that the
There is also a 1998 report, published methods of inspection and replacement
by the United States Department of criteria are varied by crane user and no
Transportation, via the Federal Railway real or replacement criteria exist. The
Administration titled, “Estimation of Rail survey also confirmed that the most
Wear Limits Based on Rail Strength prudent crane users inspect their rails
Limitations”. This report considers the and runways at least once per year,
fracture strength of rails, but pertains along with the crane annual inspection.
mostly to heavy railroad rail. Rail splice joints are given particular
attention, since they are often the
These numbers were derived based on
source of many rail problems, leading to
analytical tests conducted on heavy rail
sections that are typically used as damage to the overall rail system and to
the crane itself. Misalignment of the
railroad rails. The summary of this 1998
document concludes that rail should be crane wheels and/or rails will also often
create readily observable problems, but
replaced after an allowable wear of 0.5
inches of head loss or 0.6 inches of face by this time, it is often too late to repair
any one component and can be solved
loss. The entire report can be viewed at
only replacing rails or wheels.
the following government web site:
www.fra.dot.gov . The survey also indicated that many
users find information from the Crane
Whiting Crane Handbook
Manufacturers Association of America,
The Whiting Crane Handbook is a great (CMAA) to be helpful in terms of runway
resource for information on overhead alignment tolerances. (In particular, see
and gantry cranes. It also contains the “Maximum Runway Tolerances”
some general guidelines as to runway chart in Specification #70.) The most
maintenance and repair, but offers little significant conclusion derived from the
guidance with specific rail issues. All AIST survey and research is that there
too often, a rail is not replaced until the should be a limit to the amount of rail
rail sweep or end truck bottoms out, and wear, after which replacement should be
these repairs must be done on a costly considered before severe problems
emergency basis. arise.

AIST Efforts The follow-on effort to the survey by the


AIST committee is the development of
One group that is currently working on an extensive new technical report with a
the issue of rail inspections with two working title of “Crane Inspection,
ongoing projects is the Association for Maintenance and Repair Guidelines”.
Iron & Steel Technology, (AIST). The The intent of this document is to
Cranes Technology Committee (CTC) of describe methods of inspection and
AIST are the producers of Technical replacement criteria for all aspects of
Report #6 for the design of overhead overhead cranes, and it will include a
cranes and Technical Report #13, which significant section on rails and runways.
covers mill buildings, including crane This new technical report could be
runways. CTC sponsored a recent available as early as 2013 from AIST.
survey of crane users to determine rail
PAGE 3 of 3 GANTREX TECHNICAL BULLETIN No. TB47 Crane Rail Inspection

rail when it was new. This can be done


Absent any other by referencing specification sheets for
replacement criteria, the given rail size, or by simply
the 25% rule should measuring the rail at a point, such as
be used as a worst the very ends that see little or no crane
case scenario. travel.

The 25% Rule

One possible method to determine the


amount of allowable rail wear is based
Rail Wear Types on the wheel load charts found in the
The two most common types of rail Whiting Crane Handbook. It can be
wear are plastic deformation and edge derived that if a given rail loses 25% of
wear. Each will occur in every crane rail its overall mass, the rail selection would
application, the severity of which drop one complete rail size category,
depends on the loading and duty cycle based solely on the mass of the smaller
of a particular runway. Both types of rail as it pertains to the wheel load. Said
wear actually displace or remove metal in another way, if a rail is worn to the
from the rail surface. The results of this extent that 25% of its mass is has
wear over a long period of time can disappeared, the wheel load would
Rail wear gauge, but weaken the rails to the point that further exceed the amount listed for that rail
only for railroad rails. damage may occur, leading to failure. size. While this is a basic principle, it
can serve as a ‘lower limit’ of rail fitness
Obvious Signs of Crane Rail Failure for duty. Actual values may vary, based
on the completion of the research, but
There are several failures of crane rail one large crane manufacturer already
that can be easily identified by a visual uses this criteria when training crane
inspection of the rail. These include inspectors regarding rail inspection.
breaks in the rail, cracks in the rail head From a practical view, the point at which
and propagating cracks from splice bolt a given heavy rail should be replaced is
holes. most likely well before an aggregate
loss of material. According to the FRA
Other obvious signs include the
study, a 0.5” loss of head dimension
aforementioned bottoming of rail
alone would account for 25% of the rail
sweeps and end trucks caused by
mass alone. Absent any obvious
severe wear of the rail over long periods
Contact Gantrex at: cracking or damage, the 25% rule could
of use. By the time these conditions are
be used as a maximum amount of
1-800-242-6873 or discovered, the cost and downtime of
allowable rail wear.
emergency repairs is high, and a better
www.Gantrex.com method to determine when a rail should Conclusion
be changed is needed.
Further study to determine more
Perhaps the simplest way to determine exacting values of replacement should
the amount of wear on a crane rail is to be considered by the various technical
measure the dimensions of the rail and committees responsible for crane, rail
compare them to the dimensions of the and runway design. END.
Rev 0 = 4/24/12