You are on page 1of 4

Subject : UPS Priced BOQ

Version Remarks Date


R1 1x20 Kva ,1x6 Kva

Sl. No. DESCRIPTION Unit Total Qty

Note :
Scope of work covers supply, unloading ,Storing , installation,
testing and commissioning of the system as per the technical
specification & technical data sheet, installation cost shall
include testing & commissioning also.

Necessary Copper cabling between UPS and batteries / battery


breaker etc., shall be a part of UPS tender.
UPS input & output cable from UPS shall be supplied &
terminated by other vendors.
Necessary control cabling between different units of UPS shall
be a part of UPS offer (If required).
UPS installation cost shall include necessary 350mm MS angle
iron for UPS for bottom cable terminations. The angle frame
shall be powder coated with shade same as UPS.

Vendor to submit dimensional GA drawing of UPS / Batteries


along with offer.

1.0 UPS for Workstation&Server

Supply,Installation testing and Commissioning of UPS for


a
Workstation 1x20 Kva
1 No UPS, 20kVA, 3phase in and 3 Phase out standalone
configuration UPS with Inbuilt Static Bypass - For 1 Nos 20 Kva
UPS

Supply Installation Testing and Commissioning of 1 Nos UPS


of 20 Kva Nos 1.00

b Supply,Installation testing and Commissioning of UPS for


Workstation 1x6 Kva Standby
1 Nos UPS, 6 kVA, 1phase in and 1 Phase out Parallel
configuration UPS with Inbuilt Static Bypass - For 1 Nos 6 Kva
UPS

Supply Installation Testing and Commissioning of 1 Nos UPS


of 6 Kva Nos 1.00

2.0 UPS for Workstation /Server

12Volts batteries for 1x20kVA UPS with 15Mins back-up,


a Sealed maintenance free, Valve regulated type.- - Note 20 Kva Nos 1.00
UPS will be with 15 Minutes for each Unit

12Volts batteries for 1x6 kVA UPS with 30Mins back-up,


Sealed maintenance free, Valve regulated type.- - Note each 6
b Kva UPS will be with 30 Minutes for each Unit Nos 1.00

3.0 OTHER ACCESSORIES

Copper cables between batteries, Copper cables between UPS


3.1 & batteries and Battery Breaker for 1x20kVA, Battery stands. Nos 1.00

Copper cables between batteries, Copper cables between UPS


3.3 & batteries and Battery Breaker for 1x6 kVA, Battery stands. Nos 1.00

Supply and installation of neatly painted MS frame work


Fixing UPS on false floor for all mentioned UPS , Iso
transformers& Batteries With 75mm MS Channel 6mm thick
4.0 and 3mm Chequered plate. Scope includes load distribution Kgs 100.00
also

Supply and Erection of MS Powdercoated racks to hold 400-


500 kgs per rack, With 14 G Material, With suitable foot and
5.0 frame to hold 1x20 Kva,+1x6 Kva+ 1x1 Kva( 1kva Inverter will Nos 1.00
be Suplied by Electrical team)

TOTAL - UPS & ACCESSORIES EX TAXES


Supply
Rate in Rs