You are on page 1of 6

Doc. No.

: 26071-100-GCQ-Q-40016

Project No.: 26071 Rev.: 000

QA/QC WEEKLY REPORT

PROJECT : Engineering, Procurement and Construction (EPC) Inside


Battery Limits (ISBL) and Outside Battery Limit (OSBL) for
the Refinery Development Master Plan (RDMP) Project RU
V Balikpapan

LOCATION : Refinery Unit V Balikpapan, East Kalimantan, Indonesia

OWNER : PT PERTAMINA (Persero)

PERIOD : Week 3 (15th February 2020 – 21st February 2020)

000 21-Feb-20 Issued for Information DP HD RW

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


Doc. No.: 26071-100-GCQ-Q-40016

Project No.: 26071 Rev.: 000

TABLE OF CONTENTS

1. OVERVIEW …........................................................................
3

2. WORK ACTIVITIES …........................................................................


3

2,1 Audits completed in this week …........................................................................


3

2,2 Inspection carried out in this week …........................................................................


3

2,3 Extend of repairs, rework and weld defect analysis …........................................................................


3

2,4 Plan for Next Week …........................................................................


3

2,5 Current concerns …........................................................................


3

2,6 Non-conformance status …........................................................................


4

2,7 Rectification planning …........................................................................


4

2,8 Re-inspection after rectification finished …........................................................................


4

2,9 IMTE (Inspection, Measuring and Test Equipment) Control …................... 4

2,10 IRC (Inspection Release Certificate) Summary …........................................... 5

2,11 Shop Inspection Summary …........................................... 5

3. DOCUMENTATION …........................................................................
6

2 of 6
Doc. No.: 26071-100-GCQ-Q-40016

Project No.: 26071 Rev.: 000

Cut Off Date : 21 February 2020

1. OVERVIEW
This report is cover of QA/QC OC PP activities at RDMP Project, Balikpapan, East Kalimantan, Indonesia. Brief description of
work activities performed within this week.

2. WORK ACTIVITIES

2,1 Audits completed in this week


a. Internal Audit
Audit area : Project Control, Construction Management, Field Engineering Management, Quality Control, Material
Control and Document Control.
b. Audit Finding

c. Folow Up NC
Formal audit report will be issued next week

2,2 Inspection carried out in this week


Acceptance
Subcont Inspection
Ratio
No / Remark
Previous Week This Week Cumulative This
Vendor Overall
Total Y N Total Y N Total Y N Week

1 PT. ETI 14 14 0 0 0 0 14 14 0 100% 100%

2 MENARD 62 62 0 4 4 0 66 66 0 100% 100%

2,3 Extend of repairs, rework and weld defect analysis


None

2,4 Plan for Next Week


CIVIL
a. PT. Enviromate Technology Indonesia (Stone Material Supply)
- Material verification for shipment 10
- Material verification for shipment 16
b. Menard
- Monitoring stone column work on area 341-SS-102 (inside building)

3 of 6
Doc. No.: 26071-100-GCQ-Q-40016

Project No.: 26071 Rev.: 000

c. PT. PP (Persero), Tbk EPC Division (Civil Work Package 18)


- Review Testing Procedures, Concrete Mix Design

d. PT. Pakubumi Semesta (Pile Work Package 8)


- Review PQP, ITP, WPS, Testing Procedures

e. PT. Waskita Beton Precast


- N/A

2,5 Current concerns


- Need add. 1 QC Civil Inspector to inspection, witness, monitoring civil works (Civil work Pkg 18).
- Technical Query about qty testing samples for material stone column from each every 1.000 tons to be each
every 10.000 m3
- Stone material that came in for shipment 10 did not meet the specifications (oversize), need to screening the
material.
- Need to surveillance check to quarry to ensure that stone material meet the specifications
- Need to confirmation with engineering & procurement related type/class of pc piles, on the drawing mention class
of pc pile is type A3 while purchased by procurement is type A1 (revised drawing still on review by IPMT).
- Some points on 341-SS-111 are hold due to located in concrete drainage and outside the platform (stone column
works)
- Rejected material of pc pile incoming material due to pile with crack = 11 nos, qc will issued NCR related this
matter.
- Material verification report of pc pile incoming material still hold due to pile type/class status at the drawing not
available yet. MVR will be issued after the document/drawing release by engineering and approved by IPMT.

2,6 Non-conformance status


NUMBER OF NO. OF OVERALL NCR
NCR ISSUED STATUS
NO. DISCIPLINE REMARK
Previous This
Cumulative Open Closed
Week Week
1 Civil 0 0 0 0 0
2 Mechanical 0 0 0 0 0
3 Piping 0 0 0 0 0
4 Electrical 0 0 0 0 0
5 Instrument 0 0 0 0 0
6 Other 0 0 0 0 0

2,7 Rectification planning

2,8 Re-inspection after rectification finished

2,9 IMTE (Inspection, Measuring and Test Equipment) Control


Device Calibration SubCon Actual Usage Start Actual Usage Calibration Expired Serial
Device Name Model Manufacture Calibration Laboratories Discipline SubCon Remarks
No. Period (Disc.) Date Finish Date Date Date Number
P-PP-S-01 Total Station Set 550x Sokkia 6 months Laboratorium Kalibrasi PT. Kesuma Civil - - 08-09-19 21-01-20 21-07-20 119891
P-PP-S-02 Auto Level C330 Sokkia 6 months Laboratorium Kalibrasi PT. Kesuma Civil - - 08-09-19 21-01-20 21-07-20 540126

4 of 6
Doc. No.: 26071-100-GCQ-Q-40016

Project No.: 26071 Rev.: 000

2,10 IRC (Inspection Release Certificate) Summary


Subcont./ IRC
No Remark
Vendor Previous Week This Week Cumulative

1 PT. ETI 16 0 16

2,11 Shop Inspection Summary


Number of Shop Inspection Status
No. Remarks
PO Issued Last Week This Week Total

1 3 17 0 17

5 of 6
Doc. No.: 26071-100-GCQ-Q-40016

Project No.: 26071 Rev.: 000

3. DOCUMENTATION

Opening Meeting Internal Audit, 19-02-2010 Closing Meeting Internal Audit, 20-02-2020

Stone column installation on area 341-SS-102 Stone column installation on area 341-SS-102

Stone column installation on area 341-SS-102 Check coordinate and ground level on area 341-SS-101

6 of 6