You are on page 1of 13

‫ﻣﺸﺮوع ﺗﻮﺳﻌﺔ ﻗﺴﻢ اﻟﻄﻮارىء واﻧﺸﺎء)اﻧﺠﺎز( ﻗﺴﻢ اﻟﻨﺴﺎء واﻟﻮﻻدة واﻻﻃﻔﺎل ﻓﻲ‬

‫ اﻟﺸﺎرﻗﺔ‬- ‫ﻣﺴﺘﺸﻔﻰ اﻟﻘﺎﺳﻤﻲ‬

Extension of Emergency Department & New Women and Children


Department in Al Qassimi Hospital -Sharjah

Tender Documentation
February 2009

Revision 0

2007/153/100202047091-100202047048/ ‫ ﻣﺐ‬-: ‫رﻗﻢ اﻟﻤﻨﺎﻗﺼﺔ‬

VOLUME 1

TITLE Domestic Water System Calculation


Domestic water demand of Maternity Domestic water demand of Emergancy
Daily Domestic water
No. of Daily Domestic water Demand BATH ROOM No. of
BATH ROOM TYOE Demand
3 TYOE
BATH liter/day m /day BATH liter/day

COMPLETE
COMPLETE BATH ROOM 158 450 71.10 0 450
BATH ROOM

HALF
HALF BATHROOM 102 225 22.95 18 225
BATHROOM

Pantry 15 340 5.10 Pantry 0 340

Main KITCHEN 36.34

Domestic Demand for one day 135.49 Domestic Demand for one day

Elevated tanks 40.00 Elevated tank


Domestic Demand for two day 270.97 Domestic Demand for two day

** Water demand for kitchent = 37.85 L/meal 3meal/day


** NO OF bed = 320 bed
** NO OF Meal for each bed = 3 meal

Fire Demand 410 m3


Underground domestic water storage capacity 237 m3

Underground tank capacity for domestic water and fire


647
fighting requirments of emergancy and Maternity
m3
FINAL underground water storage tank capacity for 680.00 m3
Two underground water storage tanks each have the
17*10*2.5 m (water height 2 m)
dimenions (length*width*height)

Waste output Waste output


Daily Domestic water
No. of Daily Domestic water Demand
Demand

BATH liter/day m3/day m3/day

Waste water load of the main Maternity 54.19 Waste water capacity 1.62
Waste water collecting tank capacity for emergancy and
55.81
main Maternity

Selected Waste water collecting tank capacity for


112 m3
Emergancy and Maternity for two days

Treated water water demand of Al Qassimi Treated water water demand of


Maternity Emergancy Maternity

Daily Domestic Daily Domestic water


water Demand Demand

m3/day m3/day
Treated water demand 40.65 Treated water deman 1.22
Treated water Elevated tank 15.00 Elevated tank 1.50
Treated water site tank capacity for Emergancy and main
51
Maternity for two days

Selection Summary:
TANK
TANK CAPACITY TANK CAPACITY TANK DIMENSION (M) Total Tanks Capacity
TANK FUNCTION LOCATION NO. OF TANKS
CAPACITY (m3) (IMPERICAL (IMPERICAL Gallon) length*width*height (Imperical Gallon)
Gallon)
Underground Domestic and fire fighting storage tank for COURTYARD
340 74790 74,790 2 (17*10*2.5) 149,579
Emergancy and Maternity OF SITE
GRP Sectional Domestic water Elevated tank for Maternity Maternity ROOF 30 6599 6,600 2 (4*2*2.5) 13,200
Emergancy
GRP Sectional Domestic water Elevated tank for Emergancy 1 220 220 2 (1*1*1.5) 440
ROOF

Waste water collecting tank capacity for Emergancy and COURTYARD ACCORDING TO
115 25296 25,300 1 25,300
Maternity OF SITE AVAILABLE SPACE

Treated water storage tank capacity for Emergancy and COURTYARD ACCORDING TO
67 14738 14,740 1 14,740
Maternity OF SITE AVAILABLE SPACE

Treated water Elevated tank for Maternity Maternity ROOF 15 3300 3,300 1 (3.8*2.0*2.5) 3,300
Emergancy
Treated water Elevated tank for Emergancy 1.5 330 330 1 (1*1*2) 330
ROOF
Central Electric Heater for Maternity Maternity ROOF 4.5 990 1,000 2 (1.7*1.5*3) 2,000

Central Electric Heater for main kitchen Maternity ROOF 0.5 110 105 1 (1*0.75*2) 105
Emergancy
Central Electric Heater for Emergancy 0.5 110 105 1 (1*0.75*2) 105
ROOF
HEAD & FLOW RATE CALCULATION OF DOMESTIC WATER TRANSFER PUMP GROUP-1:

DAILY DEMAND 30694 G UK


FLOW RATE GPM 4263 G UK/hr
TOTAL HEAD
STATIC HEAD 26.50 m
FRICTION HEAD 9.78 m
MINOR HEAD 1.96 m
RESIDUAL HEAD 5.00 m
TOTAL HEAD 43.24 m

Conclusion:

TYPE Centrifugal pumps


NUMBER 2 (1 DUTY AND 1 STANDBY)
CONNECTION PARALLEL
DISCHARGE 5116 G UK/hr 6.5 L/sec
HEAD 48 m 4.8 Bar
SPEED 2950 rpm
MOTOR POWER 10.1 HP
7.5 KW

HEAD & FLOW RATE CALCULATION OF CIRCULATING WATER PUMP GROUP-2 :

FF WATER CAPACITY 142336 G UK


CIRCULATING TIME 6 hr
FLOW RATE GPM 23723 G UK/hr
TOTAL HEAD
STATIC HEAD 2.00 m
FRICTION HEAD 0.57 m
MINOR HEAD 0.11 m
RESIDUAL HEAD 5.00 m
TOTAL HEAD 7.68 m

Conclusion:

TYPE Centrifugal pumps


NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION PARALLEL
DISCHARGE 28467 G UK/hr 35.9 L/sec
HEAD 8 m 0.8 Bar
SPEED 950 rpm
MOTOR POWER 7.4 HP
5.5 KW

HEAD & FLOW RATE CALCULATION OF TREATED WATER


TRANSFER PUMP GROUP- 3 :
DAILY DEMAND 9208 G UK
FLOW RATE GPM 1535 G UK/hr
TOTAL HEAD
STATIC HEAD 26.50 m
FRICTION HEAD 20.42 m
MINOR HEAD 4.08 m
RESIDUAL HEAD 5.00 m
TOTAL HEAD 56.00 m

Conclusion:

TYPE Centrifugal pumps


NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION PARALLEL
DISCHARGE 1842 G UK/hr 2.3 L/sec
HEAD 62 m 6.2 Bar
SPEED 2950 rpm
MOTOR POWER 11 Kw
15 hp
HEAD & FLOW RATE CALCULATION OF COLD WATER PUMP GROUP-4:

BUILDING FLOOR TYPE FIXTURE TYPE NO. FIXTURE S.F.U TOTAL PLAN NO

wc 3 3.75 11.25
tower A puplic lav 5 1.5 7.5
sh 3 0
wc 14 2.25 31.5
tower A privet lav 4 0.75 3
sh 1.5 0
wc 3 3.75 11.25
tower B puplic lav 5 1.5 7.5
sh 3 0
wc 14 2.25 31.5
tower B privet lav 3 0.75 2.25

04
sh 1.5 0

-0
l
ita

1
-P
sp

wc 3 3.75 11.25

EP
ho

tower C puplic lav 5 1.5 7.5

M
sh 3 0
wc 16 2.25 36
tower C privet lav 3 0.75 2.25
sh 1.5 0
wc 10 3.75 37.5
tower D puplic lav 10 1.5 15
sh 7 3 21
wc 14 2.25 31.5
tower D privet lav 3 0.75 2.25
sh 1.5 0
wc 3 3.75 11.25
tower A puplic lav 5 1.5 7.5
sh 3 0
wc 14 2.25 31.5
tower A privet lav 4 0.75 3
sh 1.5 0
wc 3 3.75 11.25
tower B puplic lav 5 1.5 7.5
sh 3 0
wc 14 2.25 31.5
tower B privet lav 4 0.75 3

05
sh 1.5 0

-0
l
ita

1
-P
sp

wc 3 3.75 11.25

EP
ho

tower C puplic lav 5 1.5 7.5

M
sh 3 0
wc 15 2.25 33.75
tower C privet lav 3 0.75 2.25
sh 1.5 0
wc 3.75 0
tower D puplic lav 1.5 0
sh 3 0
wc 5 2.25 11.25
tower D privet lav 0.75 0
sh 1.5 0
I0401 Kitchen unit 10 3 30
I0820.01 Drain unit 11 1.5 16.5
I0820.02 Sink unit 11 1.5 16.5
I1806 Washing bench 6 3 18
I0820 Bedpan washer with thermic 11 10 110
I3803 Surgical table-top washing tunnel 1 1.5 1.5
L1021 Laboratory wall bench with basin 1 1.5 1.5
RE

5
TU

&

F3305 Thermostatic swaddling table 32 1.5 48


X

04
FI

Wall cupboard system


-0

F5803 6 1.5 9
L

1
A

-P

F3906 Scrub-up unit with photoelectric cell 2 1.5 3


IC

EP
ED

F3308 Thermostatic swaddling table 4 1.5 6


M

F5804 Wall cupboard system 2 1.5 3


F1320 Shower-stretcher with wall panel 6 10 60

Wall cupboard system with


Y2004 10 3 30
refrigerator, drugs conteiner and sink

Total Fixture Unit for Architecture Drawings 443

Total Fixture Unit for Medical equipments 353

Total Fixture Unit 796

Total Flow Rate (US gpm) 175

Total Flow Rate (Imp.gpm) 145.35


HEAD & FLOW RATE CALCULATION OF COLD WATER PUMP GROUP-4:

TOTAL FLOW R 145.35 (g(uk)pm)

STATIC H 6.40 m
FRICTION 15.43 m
MINOR H 3.09 m
5.00 m
RESIDUA
TOTAL H 17.11 m

Conclusion:
We select a backage booster pumps set
TYPE Centrifugal pumps
NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION parallel
DISCHARGE 174 (g(uk)pm) 13.22 L/s
HEAD 19 m 1.88 bar
SPEED 2950 rpm
MOTOR POWER 4.0 Kw
5.3 HP

HEAD & FLOW RATE CALCULATION OF TREATED WATER PUMP GROUP-5:

BUILDING FLOOR TYPE FIXTURE TYPE NO. FIXTURE S.F.U TOTAL PLAN NO

tower A puplic wc 3 3.75 11.25


privet wc 14 2.25 31.5
puplic wc 3 3.75 11.25

04
tower B
privet wc 14 2.25 31.5

-0
1
-P
tower C puplic wc 3 3.75 11.25

EP
privet wc 16 2.25 36

M
tower D puplic wc 10 3.75 37.5
l
ita

privet wc 14 2.25 31.5


sp

puplic wc 3 3.75 11.25


ho

tower A
privet wc 14 2.25 31.5

05
tower B puplic wc 3 3.75 11.25

-0
privet wc 14 2.25 31.5

1
-P
puplic wc 3 3.75 11.25

EP
tower C

M
privet wc 15 2.25 33.75
privet wc 5 2.25 11.25

Total Fixture Unit for Architecture Drawings 344

Total Flow Rate (gpm) 94

Total Flow Rate (g(uk)pm) 78.27

HEAD & FLOW RATE CALCULATION OF TREATED WATER PUMP GROUP-5:

TOTAL FLOW RATE 78.27 (g(uk)pm)

STATIC HEAD 6.40 m


FRICTION HEAD 15.68 m
MINOR HEAD 3.14 m
5.00 m
RESIDUAL HEAD
TOTAL HEAD 17.41 m
Conclusion:
We select a backage booster pumps set
TYPE Centrifugal pumps
NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION parallel
DISCHARGE 94 (g(uk)pm) 7.12 L/s
HEAD 19 m 1.92 bar
SPEED 2950 rpm
MOTOR POWER 3.0 Kw
4.0 HP

HEAD & FLOW RATE CALCULATION OF HOT WATER PUMP GROUP-6:

BUILDING FLOOR TYPE FIXTURE TYPE NO. FIXTURE S.F.U TOTAL PLAN NO

lav 5 1.5 7.5


puplic sh 3 0
tower A lav 4 0.75 3
privet sh 14 1.5 21
lav 5 1.5 7.5
puplic sh 3 0
tower B lav 3 0.75 2.25

04
privet

-0
sh 14 1.5 21

1
lav 5 1.5 7.5

-P
EP
puplic sh 3 0
tower C

M
lav 3 0.75 2.25
privet sh 16 1.5 24
lav 10 1.5 15
puplic sh 7 3 21
tower D lav 4 0.75 3
privet sh 1.5 0
l
ita

lav 5 2 10
sp
ho

puplic sh 4 0
tower A lav 4 1 4
privet sh 14 2 28
lav 5 2 10
puplic sh 4 0
tower B lav 4 1 4

05
privet

-0
sh 14 2 28

1
lav 5 2 10

-P
EP
puplic sh 4 0
tower C

M
lav 3 1 3
privet sh 15 2 30
lav 2 0
puplic sh 4 0
tower D lav 1 0
privet sh 4 2 8
I0401 Kitchen unit 10 3 30
I0820.01 Drain unit 11 1.5 16.5
I0820.02 Sink unit 11 1.5 16.5
I1806 Washing bench 6 1.5 9
I0820 Bedpan washer with thermic disinfection 11 1.5 16.5
I0405 Kitchen unit 0 3 0
I3803 Surgical table-top washing tunnel 1 1.5 1.5
L1021 Laboratory wall bench with basin 1 1.5 1.5
F5803 Wall cupboard system 32 1.5 48
E
R

5
TU

Scrub-up unit with photoelectric cell


&
F3906 6 1.5 9
X

04
controls. Double stand type
FI

-0
L

1
-P
A

F3308 Thermostatic swaddling table 2 1.5 3


IC

EP
ED

M
M

F3309 Thermostatic swaddling table 4 1.5 6


2 Scrub-up unit with photoelectric cell
F3907 controls. Single stand type.
2 1.5 3

F5801 Wall cupboard system 0 1.5 0


F1320 Shower-stretcher with wall panel 0 3 0
D0101 Dental cabinet system 6 0.75 4.5

Stainless steel cupboard


Y3014 system with bedpan washer, janitor and 10 3 30
sink
Total Fixture Unit for Architecture Drawings 270

Total Fixture Unit for Medical equipments 195

Total Fixture Unit 465

Total Flow Rate (gpm) 118

Total Flow Rate (g(uk)pm) 98.26

HEAD & FLOW RATE CALCULATION OF HOT WATER PUMP GROUP-6:

TOTAL FLOW RATE 98.26 (g(uk)pm)

STATIC HEAD 6.40 m


FRICTION HEAD 15.68 m
MINOR HEAD 3.14 m
5.00 m
RESIDUAL HEAD
TOTAL HEAD 17.41 m

Conclusion:
We select a backage booster pumps set
TYPE Centrifugal pumps
NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION parallel
DISCHARGE 118 (g(uk)pm) 8.93 L/s
HEAD 19 m 1.92 bar
SPEED 2950 rpm
MOTOR POWER 3.0 Kw
4.0 HP
HEAD & FLOW RATE CALCULATION OF COLD WATER PUMP GROUP-9:

BUILDING FLOOR TYPE FIXTURE TYPE NO. FIXTURE S.F.U TOTAL PLAN NO

puplic wc 12 3.75 45

01
y
lav 13 2 26
nc

-0
ga Ground floor wc 7 2.25 15.75

1
-P
er
privet lav 18 1 18

EP
Em

sh 2 0

M
I0401 Kitchen unit 1 4 4
I1810 Plaster inox working table with double sink 1 1 1
R1201 Daylight RX developer 1 2 2
RE

I6102 Ice machine 1 2 2


TU

01
X

-0
FI

1
L1021 Laboratory wall bench with basin 1 2 2

-P
L
A

EP
IC

M
Y3014 Stainless steel cupboard 5 10 50
ED
M

Wall cupboard system with refrigerator,


Y2004 16 4 64
drugs conteiner and sink

Total Fixture Unit for Architecture Drawings 105

Total Fixture Unit for Medical equipments 125

Total Fixture Unit 230

Total Flow Rate (gpm) 71

Total Flow Rate (g(uk)pm) 59.12

HEAD & FLOW RATE CALCULATION OF COLD WATER PUMP GROUP-9:

TOTAL FLOW RATE 59.12 (g(uk)pm)

STATIC HEAD 5.80 m


FRICTION HEA 11.97 m
MINOR HEAD 2.39 m
5.00 m
RESIDUAL HEA
TOTAL HEAD 13.56 m

Conclusion:
We select a backage booster pumps set
TYPE Centrifugal pumps
NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION parallel
DISCHARGE 71 (g(uk)pm) 5.38 L/s
HEAD 15 m 1.49 bar
SPEED 1450 rpm
MOTOR POWER 2.2 Kw
2.9 HP

HEAD & FLOW RATE CALCULATION OF TREATED WATER PUMP GROUP-10:

BUILDING FLOOR TYPE FIXTURE TYPE NO. FIXTURE S.F.U TOTAL PLAN NO
-P
g

puplic wc 12 3.75 45
er

Ground floor
EP
Em

privet wc 7 2.25 15.75


M

Total Fixture Unit for Architecture Drawings 61

Total Flow Rate (gpm) 32

Total Flow Rate (g(uk)pm) 26.65


HEAD & FLOW RATE CALCULATION OF TREATED WATER PUMP GROUP-10:

TOTAL FLOW RATE 26.65 (g(uk)pm)

STATIC HEAD 5.80 m


FRICTION HEAD 11.97 m
MINOR HEAD 2.39 m
5.00 m
RESIDUAL HEAD
TOTAL HEAD 13.56 m

Conclusion:
We select a backage booster pumps set
TYPE Centrifugal pumps
NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION parallel
DISCHARGE 32 (g(uk)pm) 2.42 L/s
HEAD 15 m 1.49 bar
SPEED 1450 rpm
MOTOR POWER 1.5 Kw
2.0 HP

HEAD & FLOW RATE CALCULATION OF HOT WATER PUMP GROUP-11:

BUILDING FLOOR TYPE FIXTURE TYPE NO. FIXTURE S.F.U TOTAL PLAN NO

Ground floor puplic lav 14 1.5 21


privet lav 20 0.75 15
I0401 Kitchen unit 1 3 3
I1810 Plaster inox working table with double sink 1 1.5 1.5
y
nc

L1021 Laboratory wall bench with basin 1 1.5 1.5

01
ga

-0
er

Y3014 Stainless steel cupboard 5 7 35

1
Em

-P
EP
Wall cupboard system with refrigerator,

M
Y2004 16 3 48
drugs conteiner and sink

Total Fixture Unit for Architecture Drawings 36

Total Fixture Unit for Medical equipments 89

Total Fixture Unit 125

Total Flow Rate (gpm) 50

Total Flow Rate (g(uk)pm) 41.63

HEAD & FLOW RATE CALCULATION OF HOT WATER PUMP GROUP-11:

TOTAL FLOW RATE 41.63 (g(uk)pm)

STATIC HEAD 5.80 m


FRICTION HEAD 11.97 m
MINOR HEAD 2.39 m
5.00 m
RESIDUAL HEAD
TOTAL HEAD 13.56 m

Conclusion:
We select a backage booster pumps set
TYPE Centrifugal pumps
NUMBER 2 (1DUTY AND 1STANDBY)
CONNECTION parallel
DISCHARGE 50 (g(uk)pm) 3.79 L/s
HEAD 15 m 1.49 bar
SPEED 1450 rpm
MOTOR POWER 1.5 Kw
2.0 HP
Electric water heaters sizing:
(Refer to ASHREA Applications Handbook 1999)
o o
Hot water temperature for toilet = 60 C (140 F)
Cold water temperature for toilet =20 oC (68 oF)
Power consumption = GPH*DT/(410*0.85) KW

CENTRAL HEATER
HW Total HW Recovery Storage Power
H .F.U T.H .F.U Demand Storage Tank Capacity
FLOOR NO Description Symbol Fixture NO. Demand Demand Rate Capacity Consum.
Factor
Factor
GPH GPH GPH Gal. Liters kW

lav 20 1.50 30.00 6.00 120.00 0.25 30.00 0.60 18.00 68.14 7.75
PUPLIC
SH 5 1.50 7.50 75.00 375.00 0.25 93.75 0.60 56.25 212.93 24.21
LEVEL 0
lav 39 0.75 29.25 2.00 78.00 0.25 19.50 0.60 11.70 44.29 5.04
PRIVATE
SH 2 1.50 3.00 75.00 150.00 0.25 37.50 0.60 22.50 85.17 9.68

PUPLIC lav 28 1.50 42.00 6.00 168.00 0.25 42.00 0.60 25.20 95.39 10.85
LEVEL 1 lav 62 0.75 46.50 2.00 124.00 0.25 31.00 0.60 18.60 70.41 8.01
PRIVATE
SH 8 1.50 12.00 75.00 600.00 0.25 150.00 0.60 90.00 340.69 38.74

lav 17 1.50 25.50 6.00 102.00 0.25 25.50 0.60 15.30 57.92 6.59
PUPLIC
SH 4 1.50 6.00 75.00 300.00 0.25 75.00 0.60 45.00 170.34 19.37
LEVEL 2
lav 17 0.75 12.75 2.00 34.00 0.25 8.50 0.60 5.10 19.31 2.20
PRIVATE
SH 42 1.50 63.00 75.00 3150.00 0.25 787.50 0.60 472.50 1788.60 203.37
PUPLIC lav 18 1.50 27.00 6.00 108.00 0.25 27.00 0.60 16.20 61.32 6.97
LEVEL 3 lav 22 0.75 16.50 2.00 44.00 0.25 11.00 0.60 6.60 24.98 2.84
PRIVATE
SH 44 1.50 66.00 75.00 3300.00 0.25 825.00 0.60 495.00 1873.77 213.06

PUPLIC lav 9 1.50 13.50 6.00 54.00 0.25 13.50 0.60 8.10 30.66 3.49
LEVEL 4 lav 11 0.75 8.25 2.00 22.00 0.25 5.50 0.60 3.30 12.49 1.42
PRIVATE
SH 49 1.50 73.50 75.00 3675.00 0.25 918.75 0.60 551.25 2086.70 237.27

I0401 Kitchen unit 28 3.00 84.00 20.00 560.00 0.25 140.00 0.60 84.00 317.97 36.15
I0820.01 Drain unit 20 1.5 30.00 6.00 120.00 0.25 30.00 0.60 18.00 68.14 7.75
I0820.02 Sink unit 20 1.5 30.00 6.00 120.00 0.25 30.00 0.60 18.00 68.14 7.75
Plaster working bench
I1817 2 1.5 3.00 6.00 12.00 0.25 3.00 0.60 1.80 6.81 0.77
with sink
Automatic and
I0821 polyvalent washer, two 3 1.5 4.50 6.00 18.00 0.25 4.50 0.60 2.70 10.22 1.16
doors
Double sink washing
I1803 2 3.00 6.00 20.00 40.00 0.25 10.00 0.60 6.00 22.71 2.58
unit with work table
Sterilizer with
I1417 2 1.50 3.00 6.00 12.00 0.25 3.00 0.60 1.80 6.81 0.77
horizontal chamber.
I0403 Kitchen unit 3 3.00 9.00 20.00 60.00 0.25 15.00 0.60 9.00 34.07 3.87
I1806 Washing bench 18 1.50 27.00 6.00 108.00 0.25 27.00 0.60 16.20 61.32 6.97
Washing unit with
I1808 9 1.50 13.50 6.00 54.00 0.25 13.50 0.60 8.10 30.66 3.49
cabinet
Bedpan washer with
I0820 15 1.50 22.50 6.00 90.00 0.25 22.50 0.60 13.50 51.10 5.81
thermic disinfection
I1502 Milk preparation bench 1 1.50 1.50 10 10.00 0.25 2.50 0.60 1.50 5.68 0.65
I0405 Kitchen unit 1 3.00 3.00 20.00 20.00 0.25 5.00 0.60 3.00 11.36 1.29
Surgical table-top
I3803 1 1.50 1.50 6.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39
washing tunnel

L0903 Washing unit with 2 sink 1 1.50 1.50 6.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39

Laboratory washing
1.50 3.00 6.00 12.00 0.25 3.00 0.60 1.80 6.81 0.77
R

L4803 machine with drying 2


TU

system, for laboratory


X
FI

Laboratory wall bench


1.50 7.50 6.00 30.00 0.25 7.50 0.60 4.50 17.03 1.94
L

L1021 5
A

with basin
IC
ED

Thermostatic swaddling
F3305 56 1.50 84.00 6.00 336.00 0.25 84.00 0.60 50.40 190.78 21.69
M

table
F5803 Wall cupboard system 18 1.50 27.00 6.00 108.00 0.25 27.00 0.60 16.20 61.32 6.97
Scrub-up unit with
photoelectric cell
F3906 4 1.50 6.00 10 40.00 0.25 10.00 0.60 6.00 22.71 2.58
controls. Double stand
type
Thermostatic swaddling
F3308 22 1.50 33.00 6.00 132.00 0.25 33.00 0.60 19.80 74.95 8.52
table
Thermostatic swaddling
F3309 2 1.50 3.00 6.00 12.00 0.25 3.00 0.60 1.80 6.81 0.77
table

F5804 Wall cupboard system 2 1.50 3.00 6.00 12.00 0.25 3.00 0.60 1.80 6.81 0.77

2 Scrub-up unit with


photoelectric cell
F3907 2 1.50 3.00 10 20.00 0.25 5.00 0.60 3.00 11.36 1.29
controls. Single stand
type.
F5801 Wall cupboard system 1 1.50 1.50 6.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39
Shower-stretcher with
F1320 8 3.00 24.00 75.00 600.00 0.25 150.00 0.60 90.00 340.69 38.74
wall panel
D0101 Dental cabinet system 3 0.75 2.25 2.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39
D0202 Dental unit 3 0.75 2.25 2.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39
R1201 Daylight RX developer 1 1.50 1.50 6.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39

Wall cupboard system


Y2004 with refrigerator, drugs 15 1.50 22.50 6.00 90.00 0.25 22.50 0.60 13.50 51.10 5.81
conteiner and sink

Total 8,548.95 972.05

Conclusion
We select two electric water heaters each 50% of full load
Electric heater power 486.03 KW
Electric heater capacity 4.27 M3
SELECTION 4.50 M3 989.86 gallon uk

Sizing of circulating pumps of central hot water system

DESCR. level 0 level 1 level 2 level 3 level 4 level 5 TOTAL


TAL LENGTH OF ALL HOT WATER PIPING 330 420 810 360 161 566 2647
TAL LENGTH OF ALL HOT WATER RISERS 70 147 147 132.5 206.7 703.2
LENGTH OF ALL HOT WATER RETURN PI 330 420 810 360 161 566 2647
LENGTH OF ALL HOT WATER RETURN RI 70 147 147 132.5 206.7 0 703.2

Total 6,700.40

HEAD & FLOW RATE CALCULATION OF HOT WATER RETURN CIRCULATING PUMP GROUP-7:

Flow rate of hot water circulating pump:

Pump capacity (Q) = q/pCpDT L/s q= heat loss= 205,032.24 w

Q = 10 L/s ρ= 1 kg/L
= 35 m3/h cp= 4180 J/(kg.k)
129.5 (g(uk)pm) DT= 5 K

Head of hot water circulating pump :


Maximum pipe length = 1,030.18 ft Friction loss= 5 ft per 100 ft of pipe
Friction loss = 52 ft
Fittings loss= 10 ft
heater pressure loss= 10 ft
safty Factor = 10 %
Total pump head= 79 ft 24 m

Conclusion:
We select a backage booster pumps

TYPE Centrifugal pumps


NUMBER 2 (1 duty and 1 standby)
CONNECTION parallel
DISCHARGE 155 (g(uk)pm) 11.77 L/s
HEAD 24 m 2.4 bar
SPEED 2900 rpm
POWER 8 HP
6 Kw

GATE HOUSE DETAIL


1 toilet
HW Total HW Recovery Storage Power
Demand Storage Tank Capacity
Symbol Description Fixture Qty. Demand Demand Rate Capacity Consum.
Factor
Factor
GPH GPH GPH Gal. Liters kW
Lavatory PR 1 2 2 0.30 0.60 0.70 0.42 1.59 0.15
bathtub 1 20 20 0.30 6.00 0.70 4.20 15.90 1.55
Total 22 0.30 6.60 0.70 4.62 17.49 1.70

We select one electric heater for each toilet (30 lit., 1.5 kW) EWH-1

GATE HOUSE DETAIL


1 toilet
HW Total HW Recovery Storage Power
Demand Storage Tank Capacity
Symbol Description Fixture Qty. Demand Demand Rate Capacity Consum.
Factor
Factor
GPH GPH GPH Gal. Liters kW
kitchen SINK 1 10 10 0.30 3.00 0.70 2.10 7.95 0.77
Total 10 0.30 3.00 0.70 2.10 7.95 0.77

We select one electric heater for each toilet (20 lit., 1.5 kW) EWH-2
Electric water heaters sizing:
Electric water heaters sizing:
(Refer to ASHREA Applications Handbook 1999)
Hot water temperature for toilet = 85 oC (185 oF)
o o
Cold water temperature for toilet =20 C (68 F)
Power consumption = GPH*DT/(410*0.85) KW

CENTRAL HEATER

Total HW Recovery Power


Demand Storage Storage Tank Capacity
Symbol Description Demand Rate Consum.
Factor Capacity Factor
GPH GPH Gal. Liters kW
Kitchen 400.00 0.25 100.00 0.60 60.00 227.12 33.57

Total 227.12 33.57

Conclusion

We select one electric water heaters each 100% of full load


Electric heater power 33.57 KW
3
Electric heater capacity 0.23 M
3
SELECT 0.5 M 109.984576 gallon uk

Consumption of kitchen

hot water demand 4.00 gpdpmeal


operation time 24.00 hr
Kitchen no of meal 3.00 meal/day
no of bed 320.00 bed
total demand 400.00 gph

HEAD & FLOW RATE CALCULATION OF


HOT WATER RETURN CIRCULATING PUMP GROUP-8:
Sizing of hot water circulating pump of public bath

Pump capacity (Q) = q/pcpDT L/s q= heat loss= 5490 w


Q = 0.4 L/s ρ= 1 kg/L
3
= 2 m /h cp= 4180 J/(kg.k)
5.8 (g(uk)pm) DT= 3K

Head of hot water circulating pump of public bath


Maximum pipe length = 600 ft Friction loss= 5 ft per 100 ft of pipe
Friction loss = 30 ft
Fittings loss= 8 ft
heater pressure= 10 ft
safty Factor = 15 %
Total pump head= 55 ft 17 m

Conclusion:
We select a backage booster pumps

TYPE Centrifugal pumps


NUMBER 2 (1 duty and 1 standby)
CONNECTION parallel
DISCHARGE 7 (g(uk)pm) 0.44 L/s
HEAD 17 m 1.7 bar
SPEED 1450 rpm
MOTOR POWER 0.20 HP
Electric water heaters sizing:
(Refer to ASHREA Applications Handbook 1999)
Hot water temperature for toilet = 60 oC (140 oF)
o o
Cold water temperature for toilet =20 C (68 F)
Power consumption = GPH*DT/(410*0.85) KW

CENTRAL HEATER
HW Total HW Recovery Storage Power
H .F.U T.H .F.U Demand Storage Tank Capacity
FLOOR NO Description Symbol Fixture NO. Demand Demand Rate Capacity Consum.
Factor
Factor
GPH GPH GPH Gal. Liters kW

PUPLIC lav 14 1.50 21.00 6.00 84.00 0.25 21.00 0.60 12.60 47.70 5.42
Emergancy
PRIVATE lav 20 0.75 15.00 2.00 40.00 0.25 10.00 0.60 6.00 22.71 2.58
I0401 Kitchen unit 1 3.00 3.00 20.00 20.00 0.25 5.00 0.60 3.00 11.36 1.29

Plaster inox working


I1810 1 1.5 1.50 6.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39
table with double sink

Laboratory wall
1.50 1.50 6.00 6.00 0.25 1.50 0.60 0.90 3.41 0.39
E

L1021 1
R

bench with basin


TU

Wall cupboard
X
FI

system with
24.00 96.00 0.25 24.00 0.60 14.40 54.51 6.20
L

Y2004 16 1.50 6.00


A

refrigerator, drugs
IC
ED

conteiner and sink


M

Stainless steel
cupboard
Y3014 system with bedpan 5 3.00 15.00 50.00 250.00 0.25 62.50 0.60 37.50 141.95 16.14
washer, janitor and
sink

Total 285.04 32.41

Conclusion
We select two electric water heaters each 100% of full load
Electric heater power 32.41 KW
Electric heater capacity 0.29 M3
SELECTION 0.50 M3 109.98 gallon uk

Sizing of circulating pumps of central hot water system

DESCR. level 0 TOTAL

TOTAL LENGTH OF
ALL HOT WATER
PIPING = 220 220
TOTAL LENGTH OF
ALL HOT WATER
RISERS = 4.8 4.8
TOTAL LENGTH OF
ALL HOT WATER
RETURN PIPING = 220 220
TOTAL LENGTH OF
ALL HOT WATER
RETURN RISERS = 4.8 4.8

Total 449.60

HEAD & FLOW RATE CALCULATION OF HOT WATER RETURN CIRCULATING PUMP GROUP-12:

Flow rate of hot water circulating pump

Pump capacity (Q) = q/pcpDT L/s q= heat loss= 13,488.00 W

Q = 1 L/s ρ= 1 kg/L
= 2 m3/h cp= 4180 J/(kg.k)
8.5 (g(uk)pm) DT= 5 K

Head of hot water circulating pump


Maximum pipe length = 490.81 ft Friction loss 5 per 100 ft of pipe
Friction loss = 25 ft
Fittings loss= 5 ft
heater pressure loss= 10 ft
safty Factor = 10 %
Total pump head= 43 ft 13 m

Conclusion:
We select a backage booster pumps

TYPE Centrifugal pumps


NUMBER 2 (1 duty and 1 standby)
CONNECTION parallel
DISCHARGE 10 (g(uk)pm) 0.77 L/s
HEAD 13 m 1.3 bar
SPEED 1450 rpm
POWER 0.275 HP
0.206 Kw