Professional Documents
Culture Documents
Dated: -03-2021
To,
The Divisional superintendent.
Pakistan Railways, Rawalpindi.
SUB: REQUEST FOR EXTENSION IN CONTRACT FOR FURTHER TWO YEAS AS PER
CONTRACT APPOINTMENT.
With due respect it is stated that, I have been appointed as a Sub Engineer
date 16-04-2018 on contract basis for the period of 3 years (including training) and
expire in April 2021, so it is therefore requested to your good honor that may kindly
allow the further extension in my employee contract for two years, my working report
is attached herewith.
DA/One
Yours Obediently
MUHAMMAD SHAHZAD MUSTAFA
S/Engineer Mechanical (TXR Grd-1)
C&W Depot LalaMusa CC# 5557
EMP NO.5555002
PAKISTAN RAILWAYS
Working Report
having Emp No:5555002 has been working as a Sub Engineer Mechanical (TXR Grd-1)
on contract basis since 21-02-2019 vide CPO headquarter letter No : 940-E-4/3-V (APO-1)
He is well conversant with his job and relevant Rules, and performing his duties
diligently, efficiently and taking keen interest to complete tasks assigned to him within
satisfactory.