BAYER FAT SNAGLIST
POINTS

Rejection Table trials to be taken, till it gets full


E Stop at Rotary table should be installed on a separate stand for better visibility and accessebility
Flat Carton stacker should have parking position so that a single operator can load the cartons
Slip sheet motor disconnector switch to be mounted on proper position
Branding- Cybernetik LOGO s should be installed
Safety gaurds for printer
Palletiser conveyor safety covers for sensors
Polycarbonate Gaurds at all Fencing cut outs
New Parts for Pallet Dispenser assembly- Pins, Shafts, Bracket etc
New Parts for Bottle stripper- 50 ml Gripper
Slip sheet stacker arms should be in degree to avoid slip sheet displacement
Flat Carton pushing arm modification
Motor orientation to be changed for Slip Sheet stacker
Cable and Pneumatic pipe to be properly routed for Box formation unit, VAD to be mounted properly.
Palletizer Robot gripper to be made single?
Pallet guides to be fitted for pallet stack placing on pallet dispenser
Rejection pusher trials to be taken
Pallet referencing cylinder spped to be increased
Milling step for Box referencing plated
In Zone 1, mettalic cable toes to be used
Pneumatic tagging at all Zones
Safety stickers at all required locations
Pneumatic circuit engraved drawings to be pasted at respective areas
Palletiser conveyor all hardware should be as per drawing
Control panel CE certificate to be made available for control panel
Bottom Roller for pasting sealing tape from bottom
Box formation unit frame modification for adding big sealing tape
Labelling conveyor top guide arrangement
Second head for printer to be installed and kept ready
Zone 1 pnematic stand to be rotated by 180 degree
Scale on matrix formation and arrow marking
Zero marking with a 2 arrows
Pin to be mounted on matrix formation unit
Stopper arrangement installation
Fencing and door for slip sheet loading area
Inkjet and lable applicator position interchange
Zone2 fencing to be taken on outer side of all conveyors
Palletizer conveyor rollar washers to be changed
Palletizer conveyor post to be mounted
Zone 3 - fencing @ robot backside to be changed
Scale for flat carton stacker
All fencing grouting
Box formation unit frame modification
Lifter motor Disconnector switch mounting
Change over values in SCADA recipe
Bottel present absent rejection logic test
Printer communication with PLC
Cycle time optimization
ROB01 Start and Stop from SCADA
ROB02 Start and Stop from SCADA
ROB03 Start and Stop from SCADA
ROB04 Start and Stop from SCADA
ROB01 E-Stop and A-Stop wiring and checking
ROB02 E-Stop and A-Stop wiring and checking
ROB04 E-Stop and A-Stop wiring and checking
Safety Door -01 checking
Safety Door -02 checking
Safety Door -03 checking
All E-Stop checking
All E-stop on stand and visiable
SCADA screen fine tunning
HMI screen fine tunning
Pallet lifter RH side sensor mounting
STATUS
Completed
Completed Electrical
Incomplete BMI
Completed Electrical
WIP Temporary installed
WIP Given to waterjet
WIP Given to waterjet
Incomplete From Pune
Incomplete From Pune
Incomplete From Pune
Incomplete BMI
Completed BMI
Cancelled
Completed
Incomplete BMI
Completed
Completed
Incomplete Sprocket From Pune
Incomplete 3/8/2021
Incomplete Electrical- on site
WIP Zone 2 & 3 completed
Incomplete Some are remaining
Incomplete BMI
Completed
Incomplete Control
Incomplete BMI
Incomplete BMI
Incomplete BMI
Incomplete Control
Incomplete Will be done on site
WIP Ready
WIP 3/6/2021
WIP 3/6/2021
WIP 3/6/2021
Incomplete BMI
Incomplete 3/6/2021
Incomplete BMI
Incomplete 3/8/2021
WIP Post ready
Incomplete BMI
Incomplete 3/6/2021
Completed
WIP 3/6/2021
Incomplete Control 3/5/2021
Incomplete Control 3/6/2021
Incomplete Control 3/6/2021
Incomplete Control 3/8/2021
Incomplete Control 3/10/2021
Incomplete Control 3/9/2021
Incomplete Control 3/9/2021
Incomplete Control 3/9/2021
Incomplete Control 3/9/2021
Incomplete Control 3/8/2021
Incomplete Control 3/8/2021
Incomplete Control 3/8/2021
Incomplete Control 3/8/2021
Incomplete Control 3/8/2021
Incomplete Control 3/8/2021
Incomplete Control 3/8/2021
Incomplete Control 3/8/2021
Incomplete Control 3/12/2021
Incomplete Control 3/12/2021
Incomplete Control 3/10/2021