You are on page 1of 2

GASOIL HYDROTREATING PLANT

PROJECT

DOCUMENT NO: Field Inspection And Test Plan CONTRACT NO.:93-52

A/G Civil Works


PAGE 1 OF 1
Quality Control Form

STEEL STRUCTURE COMPLETION ACCEPTANCE

AREA / UNIT: REPORT NO.: 001

STRUCTURE: DATE:

DWG NO.: SUBCONTRACTOR: CAST CO.

REV . NO.: 00 ATTACHMENT:

ROW OK OK N/A N/A NO NO

1 MAT DELIVERY REPORT □


✘ □ □
2 FABRICATION REPORT □
✘ □ □
3 TOUCH UP / PAINTING □ □ □✘

4 BOLT TIGHTENING □
✘ □ □
5 FINAL SETTING □
✘ □ □
6 GROUTING □ □✘ □
7 FIREPROOFING REPORT □ □✘ □
NOTES:

APPROVED BY:
SUBCONTRACOR(CAST CO) FALAT SAANAT ABNIE FALAT SAANAT IDEH
TZORC
QA/QC MANAGER FACTORY MANAGER INSPECTOR QA/QC MANAGER

NAME: NAME: NAME: NAME: NAME:


DATE: DATE: DATE: DATE: DATE:
SIGN: SIGN: SIGN: SIGN: SIGN: