BILL OF QUANTITY AND UNIT PRICE

UNIT PRICE AMOUNT


PAY ITEM NO. DESCRIPTION UNIT QUANTITY
(Rp.) (Rp.)

a b c d e f = (d x e)

DIVISION 2. DRAINAGE WORKS


2.1 Galian saluran sisi jalan M3
2.3.9.1 Gorong-gorong dia 400 mm M1
SK2.5.2 Porous Material for Filtering process (Filter) Unit
SK2.5.1 Bioretention Unit
2.3.9.1 U Dicth Type 80 x 80 cm Unit
2.3.3.(a) RCP Ø1000 mm m'
2.3.3 Reinforced Concrete Pipe Culvert, Dia.75-85 cm m'
2.3.9.1 Drainage U Type 60x60 cm m'
Pasangan batu mortar m3

Total Amount of Works DIVISION 2 (Carried to Final Summary) -