Professional Documents
Culture Documents
Client Project Location Project# Proj - Area Form By: Check By: Calc - By: Rev. By: 2 3
Client Project Location Project# Proj - Area Form By: Check By: Calc - By: Rev. By: 2 3
Project
Location
Project#
Proj.Area
HVAC / P / FP Engineering Dept. Form By:
Check By:
Determine Energy Savings for Glycol Run Around System Calc.By:
Rev. By:
Application: Supply and Exhaust Air Glycol Run Around System 2
3
Conventional Binning :
Units: I-P 14,734
Date:
# hrs:
Total Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Mid-pts DB (F) Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs
97.5 95 to 100 6 6
92.5 90 to 95 40 8 5 26 1
87.5 85 to 90 122 2 11 19 45 44 1
82.5 80 to 85 500 6 25 93 148 166 49 13
77.5 75 to 80 620 7 38 101 171 202 75 26
72.5 70 to 75 847 5 22 68 142 173 229 152 56
67.5 65 to 70 671 2 15 112 150 97 81 151 59 4
62.5 60 to 65 927 23 54 183 185 78 21 191 149 33 10
57.5 55 to 60 600 4 37 91 149 24 80 130 66 19
52.5 50 to 55 730 2 23 65 145 117 1 21 177 149 30
47.5 45 to 50 634 18 41 100 171 25 97 135 47
42.5 40 to 45 513 41 55 118 99 8 32 113 47
37.5 35 to 40 1,023 226 162 248 64 5 126 192
32.5 30 to 35 734 134 159 94 26 63 258
27.5 25 to 30 391 98 141 20 18 27 87
22.5 20 to 25 195 95 35 22 4 39
17.5 15 to 20 125 58 42 10 15
12.5 10 to 15 47 41 6
7.5 5 to 10 34 30 4
2.5 0 to 5 1 1
CFM DB WB RH W
Units to consider: AC-8 30,000 Extreme ConditionsWinter OA: 0 (2) Err:511 Err:511
AC-9 30,000 Winter EA: 72 Err:511 50% Err:511
AC-10 30,000 Summer OA: 93 74 Err:511 Err:511
MP-1 15,000 Summer EA: 72 Err:511 50% Err:511
Summary of Parameters:
Supply Airflow, CFM: 105,000 Sup. Coil SP, in wg: 0.6 Cooling Efficiency: 61.9%
Exhaust Airflow, CFM: 105,000 Exh. Coil SP, in wg: 0.6 Heating Efficiency: 47.2%
Unoccupied Airflow, %: Temp. Efficiency: Cooling KW per ton: 0.7
Lvg. Supply Temp, F: Pump TDH, Ft water: Fuel Cost ($/Therm): $0.30
Ent. Exhaust Temp, F: OA Design Temp, F: 0 Elec. Cost ($/kWh): $0.09
Brine Temp. Rise, F: 17 Fan Efficiency, % 65% Pump Efficiency, %: 70%
Heating GPM Brine: 658.0 Lvg. Brine Temp., F: 51 Brine Sply. Temp, F: 34
Cooling GPM Brine: 191.9 BTUH: 5.1E+06 Lvg. OA Temp, F: 44.67
Client
Project
Location
Project#
Proj.Area
HVAC / P / FP Engineering Dept. Form By:
Check By:
Determine Energy Savings for Glycol Run Around System Calc.By:
Rev. By:
Application: Supply and Exhaust Air Glycol Run Around System 2
3
Carrier Method Inputs:
cp = 1 F1 = 17.25
SG = 1 F2 = 1.00
Eff = 1 F3 = 1.00
F4 = 1.00
Notes:
GPM = [(Texh - Toa) x CFM x Eff] / [500 x cp x sg x F1 x F2 x F3 x F4]
Texh - Temperature exhaust air
Toa - Temperature outside air
CFM - average of exhaust / ventilation air quantities
Eff - Cycle effiency (8 row / 14 fin/inch)
cp - specific heat
sg - specific gravity
F1, F2, F3, F4 - brine temperature rise factors