Professional Documents
Culture Documents
1. Please Tick (✔) when job is completed & P.I.C to sign before off work - Area spray disinfectant sanitization
process.
Checklist/Date
Date: Date: Date: Date:
Depa Compu
PIC rtme lsory 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30
Common Areas: Name nt (Y/N) am pm pm am pm pm am pm pm am pm pm
Door Bell
Incoming Lorry
Loading/Unloading Area
Warehouse Office
Warehouse Toilet
Dustbin/ Wastebin
2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30
Optional Areas: (if use) pm pm am pm pm am pm pm am pm pm
Pallet Trolley
Door/Gate handles
Items/Areas which
touched/visited by visitor
Production
Areas in charge
by: Date: Date: Date: Date: Date:
Compulsory 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30
Common Areas: am pm pm am pm pm am pm pm am pm pm am pm pm
Punch Card
Machine
Rest/ Meal
Table & Chair
Production
Toilets
Forklift
Dustbin/
Wastebin
Optional Areas: 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30 8.00 2.00 4.30
(if use) am pm pm am pm pm am pm pm am pm pm am pm pm
Machinery/
Equipments
Power/Water
switches
Door/Gate
handles
Production
Working Tables
Items/Areas
which
touched/visited
by visitor
P.I.C Sign:
(session
completion)