PROBLEM 1:
SOLUTION:
1. Solve for the total load and ultimate load, “Pn and Pu”.
𝑞𝑒𝑓𝑓 = 𝑞𝑎 − 𝛾𝑠 ℎ𝑠 − 𝛾𝑐 ℎ𝑐
𝑞𝑒𝑓𝑓 = 250.30𝑘𝑃𝑎
𝐴 = 7.59𝑚2
𝐴 = 𝐿2 , 𝐿 = √𝐴
𝐿 = √7.59𝑚2
𝐿 = 2.755𝑚 ≈ 2.8𝑚
𝐴𝑎𝑐𝑡𝑢𝑎𝑙 = 𝐿2 = (2.8𝑚)2
𝐴𝑎𝑐𝑡𝑢𝑎𝑙 = 7.84𝑚2
𝑞𝑢 = 336.73 𝑘𝑃𝑎
7. Find “d” using wide beam shear.
1 1
𝑉𝑐 = √𝑓 ′ 𝑐 = √27.6𝑀𝑃𝑎
6 6
𝑉𝑐 = 0.8756𝑀𝑃𝑎
𝑉𝑢
𝑉𝑛 = , 𝑉𝑢 = 𝑞𝑢𝐿𝑥
∅𝑏𝑑
𝐿−𝑐
𝑥= −𝑑
2
2800−400
336.73(2800)[ −𝑑]
2
𝑉𝑛 =
(0.75)(2800)(𝑑)
Equate 𝑉𝑐 to 𝑉𝑛 :
2800−400
336.73𝑘𝑃𝑎(2800𝑚𝑚)[ −𝑑]
2
0.8756𝑀𝑃𝑎 =
(0.75)(2800𝑚𝑚)(𝑑)
𝑑 = 406.75 ≈ 407𝑚𝑚
2 1
𝑉𝑐𝑝 = (1 + )( √𝑓 ′ 𝑐 )
𝛽𝑐 6
2800𝑚𝑚
𝛽𝑐 = =1
2800𝑚𝑚
2 1
𝑉𝑐𝑝 = (1 + ) ( √27.6𝑀𝑃𝑎 )
1 6
𝑉𝑐𝑝 = 2.6268𝑀𝑃𝑎
1 1
𝑉𝑐𝑝𝑎𝑙𝑙𝑜𝑤 = √𝑓 ′ 𝑐 = √27.6𝑀𝑃𝑎
3 3
𝑉𝑢
𝑉𝑛𝑝 = , 𝑉𝑢 = 𝑞𝑢[𝐿2 − (𝑐 + 𝑑)2 ]
∅𝑏𝑜 𝑑
𝑏𝑜 = 4(𝑐 + 𝑑) = 4(400 + 𝑑)
0.33673469[28002 −(400+𝑑)2 ]
1.75𝑀𝑃𝑎 =
(0.75)[4(400+𝑑)](𝑑)
𝑑 = 464.39𝑚𝑚 ≈ 465𝑚𝑚(GOVERNS)
d = 465 + 1.5(25)
d = 577.5 mm
𝑞𝑢𝐿(𝐿𝑚 )2
𝑀𝑢 =
2
2.8𝑚−0.4𝑚
𝐿𝑚 = = 1.2𝑚
2
336.73𝑘𝑃𝑎(2.8𝑚)(1.2𝑚)2
𝑀𝑢 =
2
𝑀𝑢 = 678.85 𝑘𝑁
and “ 𝜌𝑚𝑖𝑛 ”.
𝜔 = 0.029789
𝜔𝑓′ 𝑐 0.029789(27.6)
𝜌= = = 0.0029897578
𝑓𝑦 275
1.4 1.4
𝜌𝑚𝑖𝑛 = = = 0.00509 > 𝜌
𝑓𝑦 275
𝐴𝑠 = 7161.63𝑚𝑚2
𝐴𝑠 7161.63𝑚𝑚2
𝑁=𝜋 = 𝜋 = 14.6 ≈ 15 𝑝𝑐𝑠.
(𝑑 2 ) (252 )
4 4
3(275)(1)(1)(1)
𝐿𝑑𝑟𝑒𝑞′𝑑 = (25) 𝐿𝑑 = 1125𝑚𝑚 > 𝐿𝑑𝑟𝑒𝑞′𝑑
5√27.6 𝑓𝑢𝑟𝑛′ 𝑑
𝐴
𝐹𝑏 = ∅0.85𝑓 ′ 𝑐𝐴1 (√ 2 )
𝐴1
𝐴 𝐴 2.82
√𝐴2 must not be > 2 , √ 2=√ 2=7>2
𝐴 0.4
1 1
𝐴
Therefore use √ 2 = 2
𝐴 1
𝐹𝑏 = (0.75)(0.85)(27.6𝑀𝑃𝑎)(0.4𝑚𝑚)2 (2)(103 )
𝐹𝑏 = 5630𝑘𝑁 > 𝑃𝑢
𝐴𝑠𝑚𝑖𝑛 = 800𝑚𝑚2
17. Summary
Use 2.8m x 2.8m footing with the effective depth to the top
bars of 465mm (total depth = 577.5mm),with 15 - 25mm ∅ bars
bothways.
SQUARE FOOTING (CASE 2)
PROBLEM 2:
SOLUTION:
1. Solve for the total load and ultimate load, “Pn and Pu”.
𝑞𝑒𝑓𝑓 = 𝑞𝑎 − 𝛾𝑠 ℎ𝑠 − 𝛾𝑐 ℎ𝑐
𝑞𝑒𝑓𝑓 = 250.72𝑘𝑃𝑎
𝐴 = 8.38𝑚2
𝐴 = 𝐿2 , 𝐿 = √𝐴
𝐿 = √8.38𝑚2
𝐿 = 2.894𝑚 ≈ 2.9𝑚
𝐴𝑎𝑐𝑡𝑢𝑎𝑙 = 𝐿2 = (2.9𝑚)2
𝐴𝑎𝑐𝑡𝑢𝑎𝑙 = 8.41𝑚2
𝑞𝑢 = 347.21 𝑘𝑃𝑎
7. Find “d” using wide beam shear.
1 1
𝑉𝑐 = √𝑓 ′ 𝑐 = √27.6𝑀𝑃𝑎
6 6
𝑉𝑐 = 0.8756𝑀𝑃𝑎
𝑉𝑢
𝑉𝑛 = , 𝑉𝑢 = 𝑞𝑢𝐿𝑥
∅𝑏𝑑
𝐿−𝑐
𝑥= −𝑑
2
2900−500
347.21(2900)[ −𝑑]
2
𝑉𝑛 =
(0.75)(2900)(𝑑)
Equate 𝑉𝑐 to 𝑉𝑛 :
2900−500
347.21(2900)[ −𝑑]
2
0.8756𝑀𝑃𝑎 =
(0.75)(2900)(𝑑)
𝑑 = 415.025 ≈ 415𝑚𝑚
2 1
𝑉𝑐𝑝 = (1 + )( √𝑓 ′ 𝑐 )
𝛽𝑐 6
2900𝑚𝑚
𝛽𝑐 = =1
2900𝑚𝑚
2 1
𝑉𝑐𝑝 = (1 + ) ( √27.6𝑀𝑃𝑎 )
1 6
𝑉𝑐𝑝 = 2.6268𝑀𝑃𝑎
1 1
𝑉𝑐𝑝𝑎𝑙𝑙𝑜𝑤 = √𝑓 ′ 𝑐 = √27.6𝑀𝑃𝑎
3 3
𝑉𝑢
𝑉𝑛𝑝 = , 𝑉𝑢 = 𝑞𝑢[𝐿2 − (𝑐 + 𝑑)2 ]
∅𝑏𝑜 𝑑
𝑏𝑜 = 4(𝑐 + 𝑑) = 4(500 + 𝑑)
0.34721[29002 −(500+𝑑)2 ]
1.75𝑀𝑃𝑎 =
(0.75)[4(500+𝑑)](𝑑)
𝑑 = 493.887𝑚𝑚 ≈ 494𝑚𝑚(GOVERNS)
d = 494 + 1.5(25)
d = 531.5 mm
𝑞𝑢𝐿(𝐿𝑚 )2
𝑀𝑢 =
2
2.9𝑚−0.5𝑚
𝐿𝑚 = = 1.2𝑚
2
347.21(2.9𝑚)(1.2𝑚)2
𝑀𝑢 =
2
𝑀𝑢 = 724.97 𝑘𝑁
and “ 𝜌𝑚𝑖𝑛 ”.
𝜔 = 0.0278
𝜔𝑓′ 𝑐 0.0278(27.6)
𝜌= = = 0.00279
𝑓𝑦 275
1.4 1.4
𝜌𝑚𝑖𝑛 = = = 0.00509 > 𝜌
𝑓𝑦 275
𝐴𝑠 = 7845.47𝑚𝑚2
𝐴𝑠 7845.47𝑚𝑚2
𝑁=𝜋 = 𝜋 = 15.98 ≈ 16 𝑝𝑐𝑠.
(𝑑 2 ) (252 )
4 4
3(275)(1)(1)(1)
𝐿𝑑𝑟𝑒𝑞′𝑑 = (25) 𝐿𝑑 = 1125𝑚𝑚 > 𝐿𝑑𝑟𝑒𝑞′𝑑
5√27.6 𝑓𝑢𝑟𝑛′ 𝑑
𝐴
𝐹𝑏 = ∅0.85𝑓 ′ 𝑐𝐴1 (√ 2 )
𝐴1
𝐴 𝐴 2.92
√𝐴2 must not be > 2 , √ 2 = √ 2 = 5.8 > 2
𝐴 0.5
1 1
𝐴
Therefore use √ 2 = 2
𝐴 1
𝐹𝑏 = (0.75)(0.85)(27.6𝑀𝑃𝑎)(0.5𝑚𝑚)2 (2)(103 )
𝐹𝑏 = 8797.5𝑘𝑁 > 𝑃𝑢
𝐴𝑠𝑚𝑖𝑛 = 1250𝑚𝑚2
17. Summary
Use 2.9m x 2.9m footing with the effective depth to the top
bars of 494mm (total depth = 606.5mm),with 16 - 25mm ∅ bars
bothways.
Time Duration (Problem 1): 28 mins. And 14 sec.