Verify as per Plot Plan

Update this as provided

General Comments:
1. Mention all Coordinates on all Piperack Columns.
2. Mention Interface Section Drawing reference.
3. Mark Line Numbers where missing

Verify as per
Plot Plan

Correct It

Update this Section View as


we did in FCCU and HF Alky
Units. Mention FGL and Level
Elevations.

ISSUED FOR DETAIL


ENGINEERING

Since FGL is now available we have to


provide all BOPs.

Mentioned FGL = 26.7 m as agreed


in DR.

KHT UNIT PIPERACK NO. 5