10/3/2021
Purchasing of need martial mention in report 9/3/2021 + repair of water pump c-38
+special tool for valves (workshop)
2 sheets written { (in/out) & (filters in store ) } (store)
11/3/2021
Going to Badr site to identify works needed and material and tools and dimension to
start work next sat 13/3/2021 (Badr site)
3406 first one-- need to adjust fuel injector and valve lash and thermostat needed--
Cylinder head installation (springs and valve and springs seats and spacer)
Install cylinder head in block
2 elbow for radiator + oil filters
Fuel pump installation (workshop)
12/3/2021
Workshop works in hold (Friday)
13/3/2021
Installation of window No 1 3406
( install of fuel supply and fuel back lines to tank ) instruction from sites manger
M.fathy (badr site)
Installation of fuel injectors and rocker arm and rocker shaft and valve cover
Adjust timing for fuel pump and injector and valve lash
Installation of exhaust manifold and turbo charger (workshop)