Workshop Daily Report

10/3/2021

 Purchasing of need martial mention in report 9/3/2021 + repair of water pump c-38
+special tool for valves (workshop)
 2 sheets written { (in/out) & (filters in store ) } (store)

11/3/2021
 Going to Badr site to identify works needed and material and tools and dimension to
start work next sat 13/3/2021 (Badr site)

 3406 first one-- need to adjust fuel injector and valve lash and thermostat needed--
 Cylinder head installation (springs and valve and springs seats and spacer)
 Install cylinder head in block
 2 elbow for radiator + oil filters
 Fuel pump installation (workshop)

12/3/2021
 Workshop works in hold (Friday)

13/3/2021
 Installation of window No 1 3406
 ( install of fuel supply and fuel back lines to tank ) instruction from sites manger
M.fathy (badr site)

 Installation of fuel injectors and rocker arm and rocker shaft and valve cover
 Adjust timing for fuel pump and injector and valve lash
 Installation of exhaust manifold and turbo charger (workshop)