Client minimum cement content 175 225 170 300 330 350 375 400
PCC M- 7.5 (1:4:8) PCC M-10 (1:3:6) PCC M-15 (1:2:4) RCC M-20 RCC M-25 RCC M-30 RCC M-35 RCC M-40
Sr. No. Materials Unit Rate
Const Amount Const Amount Const Amount Const Amount Const Amount Const Amount Const Amount Const Amount
Total Cementious content 175 225 314 340 375 400 440 475
1 Cement Bag 265 2.80 742.00 3.60 954.00 5.02 1,331.36 5.44 1,441.60 6.00 1,590.00 6.40 1,696.00 7.04 1,865.60 7.60 2,014.00
2 Fly-Ash (Cement* Fly Ash %) Kg 2.5 35.00 88 45.00 113 62.80 157 68.00 170 75.00 188 80.00 200 88.00 220 95.00 238
3 Crushed Sand Cum 1,400 0.55 770 0.55 770 0.55 770 0.55 770 0.50 700 0.50 700 0.50 700 0.50 700
4 20 mm Aggregate Cum 1,250 0.82 1,025 0.57 718 0.57 718 0.57 718 0.55 683 0.55 683 0.55 683 0.55 683
5 12/10mm aggregate Cum 1,250 - 0.25 308 0.25 308 0.25 308 0.23 293 0.23 293 0.23 293 0.23 293
6 Micro-silica Kg 25 - - - - - - - -
7 Admixtures-1 (SNF) litr 48 - 2.25 108 3.14 151 3.40 163 3.75 180 1.60 77 1.76 84 1.90 91
11 Add Wastage - - - - - - - -
3 100 T Silo for Cement 1 600,000 600,000 13,980 466 28.00 391,440
4 60 T Silo for Fly ash/ GGBS 1 550,000 550,000 12,815 427 28.00 358,820
9 Extra pipe line 100M 2 350,000 700,000 8,155 272 27.00 440,370
12 DG Set 125 KVA for 30 Cum BP 1 770,000 770,000 17,941 598 27.00 484,407
1 Two trucks are required for shifting the concrete pump Nos 2
Total 533,590
Total 250,000
1 Manpower Cost
Monthly Duration
Sr.No. Description Unit Nos/ Cost Total Salary
Salary/Hire (Month)
A) Batching Plant
4 Cement Feeding & Other Labour Month 10,000 2.00 27.00 540,000
Total 1,215,000
B) Transit Mixer
Total 1,782,000
C) Concrete Pump
3 Labour for Pipe Line Handling Month 10,000 5.00 27.00 2,700,000
Total 3,780,000
D) Loader/TLB
Total 270,000
E) Maintainance Cell
Total 1,269,000
No. of trip Dist from site-Km Diesel cons/ trip Diesel Rate Amount
Total 2,449,742
B) Concrete Pump
Total 1,825,688
C) Loader/TLB
Total 795,270
Total 2,443,982
Mob/ Demob Total Operating Cost for the Project (Rs.) Total Mob/ De Mob & Total Equip
Sr.No. Equipment No. including civil Rental Charges Oper.Cost for the Cost for the Cost/ Cum
work Crew Cost POL Total project (Rs.) project (Rs.)
1 Batching Plant 30Cum/60 Cum 1 843,590 3,849,160 1,849,500 1,849,500 2,693,089.50 6,542,249.50 148.80
4 Transit mixer 6 Cum 3 6,795.00 5,095,710 2,416,500 2,449,742 4,866,242 4,873,036.55 9,968,746.55 226.74
5 Concrete Pump 2 80,000.00 3,397,140 3,780,000 1,825,688 5,605,688 5,685,688.15 9,082,828.15 206.59
8 Loader /TLB 1 2,265.00 1,415,475 270,000.00 795,270 1,065,270 1,067,534.76 2,483,009.76 56.48
9 DG Set 125 KVA /160 KVA 1 484,407 2,443,982 2,443,982 2,443,982.11 2,928,389.11 66.61
Adopted 732