The document contains data from 4 modules measuring humidity, temperature, voltage, and current in different experimental setups. Module 1 measures primary voltage, secondary voltage, and primary current. Module 2 measures sphere gap distance and theoretical/observed breakdown voltages. Submodule 2 compares aluminum and copper needles using the same measurements. Module 3 repeats the voltage and current measurements. Module 4 again measures sphere gap distance and theoretical/observed breakdown voltages.
The document contains data from 4 modules measuring humidity, temperature, voltage, and current in different experimental setups. Module 1 measures primary voltage, secondary voltage, and primary current. Module 2 measures sphere gap distance and theoretical/observed breakdown voltages. Submodule 2 compares aluminum and copper needles using the same measurements. Module 3 repeats the voltage and current measurements. Module 4 again measures sphere gap distance and theoretical/observed breakdown voltages.
The document contains data from 4 modules measuring humidity, temperature, voltage, and current in different experimental setups. Module 1 measures primary voltage, secondary voltage, and primary current. Module 2 measures sphere gap distance and theoretical/observed breakdown voltages. Submodule 2 compares aluminum and copper needles using the same measurements. Module 3 repeats the voltage and current measurements. Module 4 again measures sphere gap distance and theoretical/observed breakdown voltages.
Tegangan Primer (V) Tegangan Sekunder (kV) Arus Primer (A)
25 13.56 0.8 50 26.2 1.8 75 39.12 2.8 100 52.51 3.9 Data Modul 2 Kelembaban Ruang Uji 55% Temperatur Ruang Uji 32.7˚C
Sphere Gap Distance (mm) Theoritical Breakdown Voltage (kV)
10 20 30 40 Observed Breakdown Voltage (kV) Tegangan Primer (V) 20.72 43 41.87 83 60.04 120 74.45 145 Data Sub Modul 2 Jarum Alumunium Kelembaban Ruang Uji 56% Temperatur Ruang Uji 32.9˚C
Sphere Gap Distance (mm) Theoritical Breakdown Voltage (kV)
5 10 20 30 40
Data Sub Modul 2 Jarum Tembaga
Kelembaban Ruang Uji 55% Temperatur Ruang Uji 33.1˚C
Sphere Gap Distance (mm) Theoritical Breakdown Voltage (kV)
20 30 40 Observed Breakdown Voltage (kV) Tegangan Primer (V) 2.93 14 6.83 16 10.93 20 21.95 42 23.57 45
Observed Breakdown Voltage (kV) Tegangan Primer (V)
17.09 33 21.36 42 25.56 52 Data Modul 3 Kelembaban Ruang Uji 55% Temperatur Ruang Uji 33.5˚C
Tegangan Primer (V) Tegangan Sekunder (kV) Arus Primer (A)
25 33.41 0.2 50 63.74 0.3 75 96.73 0.5 100 126.51 0.7 Data Modul 4 Kelembaban Ruang Uji 54% Temperatur Ruang Uji 33.8˚C
Sphere Gap Distance (mm) Theoritical Breakdown Voltage (kV)
10 20 30 40 Observed Breakdown Voltage (kV) Tegangan Primer (V) 45.1 36 105.63 83 128.86 104 175.19 140