REQUEST FOR INSPECTION / TEST

Work Order Title : Zonal Inspection for Outer Qatar

Work Order Number : ZF_050


Project Co-Coordinator : Mr. Labernie David Galang
Contractor : ALCAT Contracting Company W.L.L.

B.O.Q.Item No: ZF.C.H.31


ZF.H.H.58 Date: 26/1/2021
ZF.C.H.24 Location : Mishaal Street
ZF.H.F.27
WO No :
12571288

R.F.I. No : 674 Drawing : N/A Weather : Sunny


THE WORK / MATERIAL DETAILED BELOW ARE AVAILABLE FOR INSPECTION
Type of Works/Particulars Item No.ZF.C.H.31:- (Area = 12.80 sqm) ,ZF-(C)-Demolition and Site Clearance EXCAVATION,
Take up and set aside for re-use existing precast concrete block paving
Item No.ZF.H.H.58:- (Area = 12.80 sqm),Concrete for Kerbs and Pavements , Relay existing precast
concrete block paving previously taken up and stored on 50mm sharp sand and 150mm Class C granular
sub base, including excavation and preparation of formation
Item No.ZF.C.H.24:- (Area = 4.60 m) , ZF-(C)-Demolition and Site Clearance ,EXCAVATION,
Take up or down and remove to tips off site existing precast concrete kerbing
Item No.ZF.H.F.27:- (Area = 4.60 m) , Concrete for Kerbs and Pavements
Precast Concrete hydraulically pressed 300mm x 150mm raised kerbing, dropped or dropper
kerb or channel block, laid straight or curved at any radius, including excavation, disposal,
formation on any type of material and etc., to render the work complete.

Submitted By: SUDEEP Date: 26/1/2021 Time:


Received By: Date: Time:

Engineer's Comments :

The Above Detailed Works / Materials have been Inspected are:


Approved
Approved Subject to comments above
Not Approved amend and Resubmit

Contractor Rept. Inspector Engineer Quantity Engineer Senior/Lead Enginer


Sadath Ali

Signature / Date
Note: Contractor must provide 24 Hour notice for works/materials to be inspected
Zonal Framework Contract for Road Maintenance Qatar - Zonal Inspection for Outer Doha

Work Order Number - ZF_050

Quantity Calculation

RFI NO :- 674

ZF-(C)-Demolition and Site Clearance ,EXCAVATION,


Item No.ZF.C.H.31:- (Area = 12.80 sqm) Take up and set aside for re-use existing precast concrete block paving
Concrete for Kerbs and Pavements
Item No.ZF.H.H.58:- (Area = 12.80 sqm) Relay existing precast concrete block paving previously taken up and stored on 50mm sharp sand and 150mm Class C granular sub base, including excavation and preparation of
formation
ZF-(C)-Demolition and Site Clearance ,EXCAVATION,
Item No.ZF.C.H.24:- (Area =4.60 m) Take up or down and remove to tips off site existing precast concrete kerbing

Concrete for Kerbs and Pavements


Item No.ZF.H.F.27:- (Area = 4.60 m) Precast Concrete hydraulically pressed 300mm x 150mm raised kerbing, dropped or dropper kerb or channel block, laid straight or curved at any radius, including excavation,
disposal, formation on any type of material and etc., to render the work complete.
Coordinates KERBS & FOOTWAYS
Area &
Sl.No. Work Order No. Length (m) Width (m) Remarks
Location Easting Northing ZF.C.H.31 ZF.H.H.58 ZF.C.H.24 ZF.H.F.27
(SQM) (SQM) (M) (M)
4.00 3.20 12.80 12.80
1 Mishaal Street 12571288 25.25401485 51.436643
4.60 - 4.60 4.60 Kerbstones

TOTAL MEASUREMENTS 12.80 12.80 4.60 4.60

Prepared By: Checked By:


ZF_050 – RFI NO. 674, WO # 12571288 - Mishaal Street
( BEFORE PHOTO)

Type of Defect Footway, Interlock, damaged

Date Of Repaired 26/01/2021

Permanent Repair Yes

Contractor ALCAT
ZF_050 – RFI NO. 674, WO # 12571288 - Mishaal Street
( DURING PHOTO)

Type of Defect Footway, Interlock, damaged

Date Of Repaired 26/01/2021

Permanent Repair Yes

Contractor ALCAT
ZF_050 – RFI NO. 674, WO # 12571288 - Mishaal Street
(COMPLETED PHOTO)

Type of Defect Footway, Interlock, damaged

Date Of Repaired 26/01/2021

Permanent Repair Yes

Contractor ALCAT
ZF_050 – RFI NO. 674, WO # 12571288 - Mishaal Street