PT.

BERKAT KARUNIA PHALA


BKP
PURCHES REQUISITION
Job No. : B2109 PR No B2109-PR-TGI-002 Rev-0
Project Name : Pembuatan Jembatan Besar 2 titik, Jembatan Menengah 1 titik dan Jembatan Kecil 5 titik Date Requir'd 21-Apr-21
Customer : PT.Transportasi Gas Indonesia Issued Date 20-Apr-21
Page Sheet 1 of 1

Quantity
No Material Description Size Specification Unit Remarks
Required Used Stock Purchased

Dimension PxLxT (mm) : 203 x 95 x 145 cm


Gross Drum Volume : 400 liter
1 Mesin Molen Nominal capacity : 350 liter Unit 2 0 2
Diesel penggerak : 8 HP (8 PK)
Berat bersih : 300 kg
2 Cangkul Merk crocodile Ea 5 0 5
3 Sekop standart Ea 3 0 3
4 Holdigger standart Ea 2 0 2

5 Martil kuku kambing 0.5 kg standart Ea 4 0 4


6 Palu 5 kg tangkai pendek Ea 2 0 2
7 Palu 5kg tangkai panjang Ea 4 0 4
8 Parang standart Ea 2 0 2
9 Ember 5 Liter standart Ea 8 0 8
10 Meteran 50 meter standart Ea 1 0 1

11 Meteran 7.5 meter standart Ea 1 0 1


12 Terpal 4x3 meter standart Ea 3 0 3
13 Water Pass Leveling Magnet 9" standart Ea 2 0 2
14 Selang Water Pass 1/4" standart Ea 30 0 30
15 Angkong Arco Ea 2 0 2
16 Raskam 60 cm standart Ea 2 0 2

17 Sendok Semen atau Cetok Midle standart Ea 4 0 4


18 Sapu Lidi standart Ea 2 0 2
19 Linggis 45 cm standart Ea 2 0 2
20 Kuas 2" standart Ea 2 0 2
21 Tang Gegep standart Ea 4 0 4

Tie wire twister


22 standart Ea 4 0 4
(alat pengikat kawat rebar)

Page 1 of 3
PT. BERKAT KARUNIA PHALA
BKP
PURCHES REQUISITION
Job No. : B2109 PR No B2109-PR-TGI-002 Rev-0
Project Name : Pembuatan Jembatan Besar 2 titik, Jembatan Menengah 1 titik dan Jembatan Kecil 5 titik Date Requir'd 21-Apr-21
Customer : PT.Transportasi Gas Indonesia Issued Date 20-Apr-21
Page Sheet 1 of 1

Quantity
No Material Description Size Specification Unit Remarks
Required Used Stock Purchased
Note : 1 Setiap item sesuai spesifikasi

Prepared by, Reviewed by, Approved by,

Person In Charge Section Head Division Head / Project Manager

Page 2 of 3
PT. BERKAT KARUNIA PHALA
BKP
PURCHES REQUISITION
Job No. : B2109 PR No B2109-PR-TGI-003 Rev-0
Project Name : Pembuatan Jembatan Besar 2 titik, Jembatan Menengah 1 titik dan Jembatan Kecil 5 titik Date Requir'd 21-Apr-21
Customer : PT.Transportasi Gas Indonesia Issued Date 20-Apr-21
Page Sheet 1 of 1

Quantity
No Material Description Size Specification Unit Remarks
Required Used Stock Purchased

1 Ware Pack XXL standart Ea 10 0 10


2 Rubber Shoes XL Putih/bening Lusin 10 0 10
3 Helmet m standart Ea 10 0 10

4 Safety Glass 1 Bening Lusin 1 0 1

Note : 1 Setiap item sesuai spesifikasi

Prepared by, Reviewed by, Approved by,

Person In Charge Section Head Division Head / Project Manager

Page 3 of 3