Date:
Standard Work Combination Sheet Manual =
Process: Available time: Takt Time: Automatic =
Product: Required output: Entered by: Walk =
# Description of Operation Step Time Time (draw solid line vertically at takt time) Multicycle time study to obtain average time
Manual Automatic Walk 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Sample 1 2 3 4 5 6 7 8 9 10 Average
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Totals
Rev. 10/17/2005 Copyright © Oct 2005. All Rights Reserved. (619)244-8705 www.ProgressivEdge.com
Date: Oct 17, 2005
Standard Work Combination Sheet Manual =
Process: Left Bracket Assembly Available time: 440 minutes Takt Time: 66 seconds Automatic =
Product: Tough Truck Required output: 400 per day Entered by: Billy B. Walk =
# Description of Operation Step Time (seconds) Time (draw solid line vertically at takt time) Multicycle time study to obtain average time
Manual Automatic Walk 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 Sample 1 2 3 4 5 6 7 8 9 10 Avg
1 Form Bracket 5 3 2 4.5 5.5 5.5 4.9 5.1 5.0 4.9 5.0 5.0 5.1 5.05
2 Paint Bracket (Auto is dry time) 15 30 3 15.0 15.0 14.8 14.9 15.0 15.0 15.0 15.0 15.2 15.0 14.99
3 Connect Support to Bracket 3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3
4 Clean 20 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20
5 Test 12 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12
6 Pack 14 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Total Time 69 33 5
Rev. 10/17/2005 Copyright © Oct 2005. All Rights Reserved. (619)244-8705 www.ProgressivEdge.com
Date:
Standard Work Sheet
Cell: Available time: Takt Time:
Product: Required output: Entered by:
# Description of Operation Step Time
Cell Layout
Manual Automatic Walk
Quality Standard
WIP Safety Total:
Flow Check
Copyright © Oct 2005. All Rights Reserved. (619)244-8705
Rev. 10/17/2005 www.ProgressivEdge.com
Date: Oct 17, 2005
Standard Work Sheet
Cell: The Bracket Makers Available time: 440 Minutes Takt Time: 66 seconds
Product: Tough Truck Required output: 400 Entered by: Billy B.
# Description of Operation Step Time
Cell Layout
Manual Automatic Walk
1 Form Bracket 5 3 2
2 Paint Bracket (Auto is dry time) 15 30 3
3 Connect Support to Bracket 3
#1 Press to 4 Clean 20
form #6 Pack
Brackets 5 Test 12
20 Brackets
6 Pack 14
Max.
20 Brackets
Max.
#2 Paint #5 Test
Booth with
Dry Rack
#4 Clean
#3 Connect Support to
Bracket
Quality Standard
WIP Safety Total Time: 69 33 5
Flow Check
Copyright © Oct 2005. All Rights Reserved. (619)244-8705
Rev. 10/17/2005 www.ProgressivEdge.com