Lean & Flow Manufacturing

Section 6 -
Short Interval Management (S.I.M.)
Awareness

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


1
Objectives

 Introduce the «global» contents of SIM

 Show organization impact on management of manufacturing


and support function teams

 Present principles, concepts and tools management.

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


2
Contents

 Why SIM?

 What is SIM?

 Implementation: Means

 Example

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


3
Why SIM ?

People commitment

Product-process Management of industrial


engineering and logistic processes

The SPS and its operating principles entail major changes


in the different groups of people involved in manufacturing.

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


4
Why SIM ?

People commitment

n Quality product, service quality,


productivity and elasticity come from
employee commitment rather than a
particular technique.
n Competitiveness depends on the
initiative and intelligence of everyone.
n People commitment must be supported
by a consistent social policy and
management system for the whole site.

SPS - 0041 EN - ind Bridge Illustration guiding principles of SPS


2
2

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


5
Why SIM ? New operating mode

 The SPS, Industrial Excellence programs and the physical changes they bring
about within the manufacturing organization lead to:

 A new operating mode among operating personnel ( new shape line).

 Different demands in relations between cell managers and operators.

 Suitable means of «reading» Manufacturing Performance.

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


6
Why SIM ? New operating mode

 Lean conditions (one piece flow, minimum stock, reduced throughput


time…) create the need for increased responsiveness on the part of
production support functions ( Supply chain, Maintenance, Methods
Engineering, Quality…).

 It's a new relation mode between Manufacturing and support Function.

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


7
Why SIM ? Before Lean Manufacturing
Border line and/or off-set raw material Store
A B C D E F G H I J K L M

Important
displacements Components and investment X 2 many displacements
A B C D
conflict of flow A B C D - Individual performance
S/
E
S/
E -Useless displacements.
raw materials work-in work-in
-progress -progress Raw materials
- Product flow is complex.
- Lead time
- WIP absorb the risks.
E F G H Station Bottleneck
S/
E

work-in-progress raw materials


Break of flow

Unbalanced station
The reaction time is adapted to this state
I J High stocks K L M

S/ S/
E E
work-in- Raw materialswork-in- finished products
progress progress

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


8
Why SIM ? after Lean Manufacturing

E F G

- Flow is continuous S/E S/


E

E
S/
- Displacements are minimized H
D
I

S/E
-The operators are centered on the added value.

S/E
C
J
- The team has a hourly output

S/E
S/E
Stocks and the work-in-progress are at least K
reduced. Concept of the "one piece flow" B
L

S/E

S/E
A
M

finished products
The reaction time
must adapt to this situation

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


9
 What is SIM?

- Definitions
- SIM in Industrial Excellence

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


10
What is SIM ?

 Definitions

 SIM is a system based on a close relationship with frequent contact


between line managers and their staff.

 The aim of SIM is to:

«Put staff in an optimally effective position to achieve, maintain and


even systematically improve the desired level of performance and
attain such effectiveness»

 SIM concerns both Production and Support Functions.

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


11
What is SIM ?

 SIM in Industrial Excellence

The system links up the production sectors and the support functions

It synchronizes the support functions with the specific needs


of the production sectors

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


12
What is SIM ?
Specific needs for the Production: To remove the waste causes and give priorities

Potential Causes ( in hours)

Repairs Others

Quality parts .

No component
Training .
Self-checking Pace
.
Waiting
Displacements parts
Ergonomics Beginning /end Empty line
New products Balance
.
Provisioning SIL Failures
Change over machine

Tracability

Taking away

which are the causes of red?

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


13
Means

 Implementation: Means

- A continuous improvement process


- An event-driven cycle
- Basic rules

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


14
A continuous improvement process

 Steps in Process

Define scope of the activity

Determine success indicators

Compare results to expectations

 Identify causes for any gap (5 why)


Congratulate 
& Identify solutions
Encourage

Set up the action plan

Take actions to meet deadlines

Continually review progress

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


15
A SIM cycle

 Components

Production Support
animation Function
animation

SIM
cycle

The SIM cycle is the essential structuring element. It establishes the link
between production process and support functions.

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


16
Basic rules

 a common language: green / red

 objectives known to all and displayed in the workshops or departments

 performance to be measured at frequent intervals

(e.g. by the hour for the production line)

 systematic search for reasons for disparities in performance

(search based on facts and not on impressions)

 actions given priority according to what is at stake

(focus on the 2 or 3 major dysfunctions noted)

 systematic feed back to the teams on defined actions and deadlines

SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training


17
The Short interval Cycle

Real time Worker correct


immediatly

Ideas board
weekly
Support M
1 3 Fonction
A
N
By shift Method A
Quality G
h daily E
Supervisor Maintenance R
 Logistic S
 2
Team weekly
4
meeting Method Mg
2 weeks Qualit Mg
Maintenance Mg
6 Manuf Plant Mg Logistic Mg
monthly
Supervisor Manuf Mg 5 Manufacturing Mg
Plant Mg
SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training
18
The Short interval Cycle : examples

Real time Worker correct


immediatly

Ideas board
weekly
M
hourly 1 Support A
Permanent 3 Method
Weekly
Fonction N
A
By shift
Weekly daily Quality G
h E
By shift  By day Supervisor Maintenance
Logistic
R
S
 2
Team weekly
4
meeting Method Mg
2 weeks Qualit Mg
Maintenance Mg
6 Manuf Plant Mg Logistic Mg
monthly
Supervisor Manuf Mg 5 Manufacturing Mg
Plant Mg
SPS 0078 EN ind AC Section 6 : lean & flow manufacturing Training
19
More details are available on intranet SPS
http://swebi.schneider-electric.com