Dear Sir,

Kindly find below the list of the materials required for the maintenance of H2SO4 dosing system. Please
arrange the material as per below list.

Quantity
SR# Item Description Type Company
(Pcs)
1 A0-080 Ball Valve 346FPM Georg Fischer 14
D20, DN15 ½”
2 Ball Check Valve 360 Georg Fischer 6
D20, DN15, PN16
3 Wafer Check Valve 369 SYGEF 4
D40, DN 32 PN6
4 Fusion Socket Valve 346 Georg Fischer 10
end
5 Standard Union Bush 735 648 606 SYGEF 10
PN 16, D20
6 Standard Union End 735 640 106 SYGEF 10
PN16, D20
7 O ring Gaskets D20, 700 245 481 Georg Fischer 20
DN15