INVITATION TO BID

No.XEN/T&G/GSC/LESCO/ 75 Dated: 15.01.2021


1. EXECUTIVE ENGINEER T&G DIVISION GSC LESCO invites sealed bids (NCB) through
Single Stage One Envelope Bidding Method from the PEC Registered Firms having code
“EE-05” in categort “C-6” and above for electrical works. For supply works firms must be
registered with FBR and GST. The following works will be carried out during shut down, detail
of works as under:
2. 1. Dismantling of 20/26 MVA P/T at 132KV G/S Chung. 2. Dismantling of 20/26 MVA P/T
at 132KV G/S Haveli Lakha. 3. Dismantling of 20/26 MVA P/T at 132KV G/S Wallington
Mall. 4. Dismantling of 20/26 MVA P/T at 132KV G/S Kala Shah Kaku. 5. Dismantling of
20/26 MVA P/T at 132KV G/S Shadman 6. Dismantling of 20/26 MVA P/T at 132KV G/S
Bhaipheru (T-1). 7. Dismantling of 20/26 MVA P/T at 132KV G/S Bhaipheru (T-4). 8.
Loading, Shifting & Un-Loading i.e Removing of existing 20/26MVA Power Transformer from
Plinth to Yard & Installation of New 31.5/40MVA on plinth during shutdown at 132KV G/S
Haveli Lakha. 9. Loading, Shifting & Un-Loading i.e Removing of existing 20/26MVA Power
Transformer from Plinth to Yard & Installation of New 31.5/40MVA on plinth during shutdown
at 132KV G/S Wallington Mall. 10. Loading, Shifting & Un-Loading i.e Removing of existing
20/26MVA Power Transformer from Plinth to Yard & Installation of New 31.5/40MVA on
plinth during shutdown at 132KV G/S Kala Shah Kaku. 11. Loading, Shifting & Un-Loading i.e
Removing of existing 20/26MVA Power Transformer from Plinth to Yard & Installation of New
31.5/40MVA on plinth during shutdown at 132KV G/S Bhaipheru (T-1). 12. Loading, Shifting
& Un-Loading i.e Removing of existing 20/26MVA Power Transformer from Plinth to Yard &
Installation of New 31.5/40MVA on plinth during shutdown at 132KV G/S Bhaipheru (T-4). 13.
Dismantling of existing 11KV Incoming panels for 20/26MVA PTF and installation of new
11KV Incoming Panels for 31.5/40MVA PTF including Laying of Power Cables at 132KV Grid
Station Farooqabad. 14. Dismantling of existing 11KV Incoming panels for 20/26MVA PTF
and installation of new 11KV Incoming Panels for 31.5/40MVA PTF including Laying of Power
Cables at 132KV Grid Station Batapur. 15. Dismantling of existing 11KV Incoming panels for
20/26MVA PTF and installation of new 11KV Incoming Panels for 31.5/40MVA PTF including
Laying of Power Cables at 132KV Grid Station Kasur Old. 16. Dismantling of existing 11KV
Incoming panels for 20/26MVA PTF and installation of new 11KV Incoming Panels for
31.5/40MVA PTF including Laying of Power Cables at 132KV Grid Station Shalamar-II. 17.
Dismantling of existing 11KV Incoming panels for 20/26MVA PTF and installation of new
11KV Incoming Panels for 31.5/40MVA PTF including Laying of Power Cables at 132KV Grid
Station Chung. 18. Dismantling of existing 11KV Incoming panels for 20/26MVA PTF and
installation of new 11KV Incoming Panels for 31.5/40MVA PTF including Laying of Power
Cables at 132KV Grid Station Sabzazar (T-2). 19. Dismantling of existing 11KV Incoming
panels for 20/26MVA PTF and installation of new 11KV Incoming Panels for 31.5/40MVA PTF
including Laying of Power Cables at 132KV Grid Station Sabzazar (T-4). 20. Dismantling of
existing 11KV Incoming panels for 20/26MVA PTF and installation of new 11KV Incoming
Panels for 31.5/40MVA PTF including Laying of Power Cables at 132KV Grid Station Haveli
Lakha. 21. Dismantling of existing 11KV Incoming panels for 20/26MVA PTF and installation
of new 11KV Incoming Panels for 31.5/40MVA PTF including Laying of Power Cables at
132KV Grid Station Wallington Mall. 22. Dismantling of existing 11KV Incoming panels for
20/26MVA PTF and installation of new 11KV Incoming Panels for 31.5/40MVA PTF including
Laying of Power Cables at 132KV Grid Station Kala Shah Kaku. 23. Dismantling of existing
11KV Incoming panels for 20/26MVA PTF and installation of new 11KV Incoming Panels for
31.5/40MVA PTF including Laying of Power Cables at 132KV Grid Station Shadman. 24.
Dismantling of existing 11KV Incoming panels for 20/26MVA PTF and installation of new
11KV Incoming Panels for 31.5/40MVA PTF including Laying of Power Cables at 132KV Grid
Station Bhaipheru (T-1). 25. Dismantling of existing 11KV Incoming panels for 20/26MVA
PTF and installation of new 11KV Incoming Panels for 31.5/40MVA PTF including Laying of
Power Cables at 132KV Grid Station Bhaipheru (T-4). 26. Supply of wiring Material for 132KV
G/S Ittehad Chemical. 27. Erection/ Installation of Electrical Equipments at 132kv G/S Saddar
Gogera. 28. Removing i.e Loading, Shifting & Un-Loading of existing Power Transformer
from plinth to yard within the premises of G/S at 132KV G/S Warburton. 29. Supply of Wiring
Material for GOR Sub Station. 30. Dismantling of existing 11KV Panels and wiring/ installation
of new panels at GOR Sub Station.
3. Bid Security amounting Rs 20000 PKR for each work in form of CDR from any schedule
bank.
4. The Bids, prepared in accordance with the instructions in the bidding documents, must reach
in office of Executive Engineer (T&G) Division GSC LESCO Lahore, Near 132 KV G/S
GARDEN TOWN FEROZEPUR ROAD on 03-02-2020. Bids will be received up to 11.00 A:M
& opened at the same day up to 11:30Hours.
5.Bidding documents can be purchased from office of XEN T&G Divn: GSC after depositing
of Rs: 1000/ tender Fee for each work along with PEC Registration certificate having code
“EE-05” and must completed at least one work order of similar nature and for supply works firm
must be registered with FBR, PRA and having valid GST No.
6.Tender advertisement can be seen on LESCO (www.lesco.gov.pk) and PPRA
(www.ppra.gov.pk) websites.

EXECUTIVE ENGINEER
T&G DIVN GSC LESCO