You are on page 1of 3

TABLE OF CONTENTS

Project REINFORCEMENT OF AD DAKHILIYAH WATER TRANSMISSION SYSTEM - PHASE II


Client PUBLIC AUTHORITY FOR WATER
PMC ENERGOPROJECKT ENTEL L.L.C
Contractor LARSEN & TOUBRO CONSTRUCTION LTD

Vendor

S.No Particulars Page No


1 Compliance Statement
2 Product Data Sheet. (It will contain information as per specfication)
3 Product Drawing & List of Materials, etc.
4 Latest Test Certificate/ Mill Certificate related to the product

5 Product Certificate Registration from PAW with valid date and / or PAW
approval letter
Product broucher or Catalogue. Highlighted proposed product to be used in
6 the project.
7 Manufacturer / Supplier Company Profile
8 Manufacturer ISO certificate (ISO 9001) with valid date
9 Pricing schedule reference to be provided
10 Copy of relevant contract specification
11 Copy of relevant standards
12 Previous approval MAS copies from PAW project
13 List of reference projects, stamped by manufacture/supplier
14 Certificates (WRAS, API, etc)
15 Delivery period
16 QAP/QCP/ITP
17 Supplier organziation chart/ Leadership
18 Quality Policy
19 Warranty/Guaranty /under taking certificates
20 Details of Testing Facilities

Sensitivity: LNT Construction Internal Use


#
MAS INTERNAL CHECK LIST
Project REINFORCEMENT OF AD DAKHILIYAH WATER TRANSMISSION SYSTEM - PHASE II
Client PUBLIC AUTHORITY FOR WATER
PMC ENERGOPROJECKT ENTEL L.L.C
Contractor LARSEN & TOUBRO CONSTRUCTION LTD
Vendor
Availablity
S.no Details Remarks
Yes No
QA/QC Reviewd /Verified Detailed complaince statement duly signed and stamped by
1
supplier & Contractor with specification clauses.

Original detailed product catalog with supplier stamp by highliting exact releated to project
2
specific

3 Product Data Sheet, Drawing, List of materials (As per Specification)

4 Valid ISO certificates, WRAS & API..etc.

5 Product Certificate Registration from PAW with valid date / PAW approval letter

6 Latest MTC. with stamp

7 Previous MAS approvals in oman (shall be recent & relevant)

8 Manfacturer QAP/QCP (shall be stamped)

9 Manfacturer ITP (shall be stamped)

Sensitivity: LNT Construction Internal Use


#
10 Manufacture / Supplier profile with stamp

11 Copies of Related standards or codes & Project Specification.

12 Table of contents With PAGE Nos

13 Price of schedule and comparison if we proposing multiple venders for same product

14 List of reference projects, Stamped by manufacture/Supplier

15 Delivery Period
Note:- Page details shall be mentioned in the Remark column for quick reference.

Sensitivity: LNT Construction Internal Use


#